Back to bathroom remodel contractors
Green Sequoia Construction Group Inc
- Based in
- Alameda
- On San Francisco permits
- Nov 2017 to Oct 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 7 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2019 | Expired or cancelled expired Apr 2024 | 855 Lincoln Wy | interior remodel of 2 bathrooms. master bath -tub shower converted to walk-in shower. hallway bath, walk-in shower converted to tub shower. no structural work. no framing modification.Details
interior remodel of 2 bathrooms. master bath -tub shower converted to walk-in shower. hallway bath, walk-in shower converted to tub shower. no structural work. no framing modification. | $15,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 855 Lincoln Wy | unit 4. remodel kitchen & 2 baths, replace flooring in entire home, add recessed lighting. no plans. like for like replacement of fixtures and finishes.Details
unit 4. remodel kitchen & 2 baths, replace flooring in entire home, add recessed lighting. no plans. like for like replacement of fixtures and finishes. | $100,000 |
| Feb 13, 2019 | Completed final sign-off Jan 2021 | 516 Dwight St | 2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter.Details
2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter. | $100,000 |
| Nov 8, 2018 | Completed final sign-off Nov 2019 | 175 Bluxome St | #123: convert 1/2 to full bath. replace (e) stair with spiral stair.Details
#123: convert 1/2 to full bath. replace (e) stair with spiral stair. | $10,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 1465 Hayes St | converting closet to (n) full bath. & install new window replacing existing window. not visible from the street.Details
converting closet to (n) full bath. & install new window replacing existing window. not visible from the street. | $10,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2018 | 10 Inca Ln | #1 -bathroom remodelDetails
#1 -bathroom remodel | $12,000 |