Or Dayan
- Listed as
- authorized agent-others, contractor, designer, pmt consultant/expediter
- Firm
- Baracke Dba Infinity Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Dec 2023
57 permits since 2000 (contractor on 50 permits, authorized agent-others on 10 permits, pmt consultant/expediter on 2 permits, designer on 1 permit): 46 completed, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 1, 2023 | Expired or cancelled expired Jan 2026 | 763 Ulloa St | Heirloom Builders Inc, Baracke Dba Infinity Construction | rev to pa 2023-0516-7900: revise width of window #3, not street visible.Details
rev to pa 2023-0516-7900: revise width of window #3, not street visible. | |
| May 16, 2023 | Expired or cancelled expired Jan 2026 | 763 Ulloa St | Heirloom Builders Inc, Baracke Dba Infinity Construction | remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study roomDetails
remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study room | $80,000 |
| May 2, 2023 | Completed final sign-off Oct 2023 | 2211 28th Av | Baracke Dba Infinity Construction | in-kind remodel of bathroom and kitchen. add bath tub in bathroomDetails
in-kind remodel of bathroom and kitchen. add bath tub in bathroom | $30,000 |
| Apr 17, 2023 | Completed final sign-off May 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side,Details
permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side, | $12,000 |
| Dec 30, 2022 | Completed final sign-off Dec 2023 | 105 Yale St | Baracke Dba Infinity Construction | remove load bearing wall bewteen kitchen & living room, remodel kitchen & (2) bathroomsDetails
remove load bearing wall bewteen kitchen & living room, remodel kitchen & (2) bathrooms | $55,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | replace (7) windows & (1) sliding door. windows are visible on the side.Details
replace (7) windows & (1) sliding door. windows are visible on the side. | $9,000 |
| Dec 8, 2022 | Completed final sign-off Feb 2023 | 811 Moultrie St | Baracke Dba Infinity Construction | revision to 202210255109: remodel 3 fixture bathroom, relocate fixtures. relocate laundry. demo 1 window, add 1 window, reduction of glazing area. (invisible from st)Details
revision to 202210255109: remodel 3 fixture bathroom, relocate fixtures. relocate laundry. demo 1 window, add 1 window, reduction of glazing area. (invisible from st) | |
| Dec 7, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30.Details
replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30. | $1,200 |
| Dec 1, 2022 | Completed final sign-off Apr 2023 | 2077 Jackson St | Baracke Dba Infinity Construction | 1)bathroom remodel changing shower locations. 2)bathroom remodel changing tub location. 3)kitchen remodel like to like inkind.4)heating system. 5)changing hardwood floor. 6)rewiring whole house.Details
1)bathroom remodel changing shower locations. 2)bathroom remodel changing tub location. 3)kitchen remodel like to like inkind.4)heating system. 5)changing hardwood floor. 6)rewiring whole house. | $50,000 |
| Nov 29, 2022 | Completed final sign-off Jan 2023 | 126 Cayuga Av | Baracke Dba Infinity Construction | remodel kitchen like for like to comply with pa #2022 0216 8097Details
remodel kitchen like for like to comply with pa #2022 0216 8097 | $12,000 |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 505 Joost Av | Baracke Dba Infinity Construction | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $14,000 |
| Nov 14, 2022 | Never finaled issued Nov 2022, no final | 1181 York St | Baracke Dba Infinity Construction | revision of 202205265036 adequately depict work & (e) condition, work descript of 202205265035 "retrofit foundation" work description: provide collyndr structrual strengthening to (e) lowest fl to included replace 3 pier 16' of (n) concrete fle (n) concrete slab & plywood shearwallsDetails
revision of 202205265036 adequately depict work & (e) condition, work descript of 202205265035 "retrofit foundation" work description: provide collyndr structrual strengthening to (e) lowest fl to included replace 3 pier 16' of (n) concrete fle (n) concrete slab & plywood shearwalls | |
| Oct 25, 2022 | Completed final sign-off Feb 2023 | 811 Moultrie St | Baracke Dba Infinity Construction | in kind remodeling 1 bathroom. in kind remodeling 1 laundry.Details
in kind remodeling 1 bathroom. in kind remodeling 1 laundry. | $15,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | Baracke Dba Infinity Construction | revision to pa 2020-0830-1577 kitchen: remove 1 partition wall & move appliances; bathroom: remove 1 partition walls; extend other partition wall by 2 ft, closed 2 doors to bathroom, added 1 door, moved toilet, sink, closed 1 window, replaced 1 window; converted bath to shower.Details
revision to pa 2020-0830-1577 kitchen: remove 1 partition wall & move appliances; bathroom: remove 1 partition walls; extend other partition wall by 2 ft, closed 2 doors to bathroom, added 1 door, moved toilet, sink, closed 1 window, replaced 1 window; converted bath to shower. | |
| Aug 30, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | Baracke Dba Infinity Construction | revision to pa# 202205063708. revise before and after plan removing partiton wall between kitchen and living room, replace two windows in kind, not visible from street.Details
revision to pa# 202205063708. revise before and after plan removing partiton wall between kitchen and living room, replace two windows in kind, not visible from street. | $20,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unitDetails
remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unit | $20,000 |
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 814 Hayes St | Baracke Dba Infinity Construction | unit 1: amend to pa202206136152 for additional work. remodel of 2 (e) bathrooms. in kind. no structural work. replace all flooring. rewiring entire house. no additional alteration of wall, window or door. ledDetails
unit 1: amend to pa202206136152 for additional work. remodel of 2 (e) bathrooms. in kind. no structural work. replace all flooring. rewiring entire house. no additional alteration of wall, window or door. led | $30,000 |
| Jul 27, 2022 | Completed final sign-off Sep 2022 | 2017 19th St | Baracke Dba Infinity Construction | bathroom in kind renovation, it contains electrical & plumbing works like to like. replace all tiles, replace shower pan, replace toilet, replace sink.Details
bathroom in kind renovation, it contains electrical & plumbing works like to like. replace all tiles, replace shower pan, replace toilet, replace sink. | $22,000 |
| Jul 25, 2022 | Completed final sign-off Oct 2022 | 1200 Rhode Island St | Baracke Dba Infinity Construction | remodeling kitchen: and replacing cabinets, new tile, new sink , new lights, remodeling new baths: deplacing tile new vanity and new tile. shower pan. remodel in kindDetails
remodeling kitchen: and replacing cabinets, new tile, new sink , new lights, remodeling new baths: deplacing tile new vanity and new tile. shower pan. remodel in kind | $55,543 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | Baracke Dba Infinity Construction, A N R Development | (1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings.Details
(1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings. | $14,500 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | Baracke Dba Infinity Construction, A N R Development | (1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings.Details
(1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings. | $14,500 |
| Jun 16, 2022 | Completed final sign-off Feb 2023 | 1040 Filbert St | Baracke Dba Infinity Construction | kitchen and two bathrooms remodel, like for like. no structural work and no change to wall layout or floor plan. replace tiles, cabinets, vanities in kind.Details
kitchen and two bathrooms remodel, like for like. no structural work and no change to wall layout or floor plan. replace tiles, cabinets, vanities in kind. | $97,250 |
| Jun 13, 2022 | Completed final sign-off Sep 2024 | 814 Hayes St | Baracke Dba Infinity Construction | unit #1: remodel kitchen. delete half bath (toilet & sink). modify guardrails at mezzanine. add door at entry within non-bearing wall. replace all windows & skylights at same size & location. tankless water heater. new hydronic radiant heat and flooring throughout.Details
unit #1: remodel kitchen. delete half bath (toilet & sink). modify guardrails at mezzanine. add door at entry within non-bearing wall. replace all windows & skylights at same size & location. tankless water heater. new hydronic radiant heat and flooring throughout. | $75,000 |
| Jun 7, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | Baracke Dba Infinity Construction, A N R Development | one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings.Details
one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings. | $14,500 |
| May 26, 2022 | Never finaled issued Jun 2022, no final | 1181 York St | Baracke Dba Infinity Construction | retrofit foundationDetails
retrofit foundation | $17,000 |
| May 24, 2022 | Completed final sign-off Nov 2022 | 233 30th St | Creekside Pro Construction Inc | adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area.Details
adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area. | $8,000 |
| May 6, 2022 | Never finaled issued May 2022, no final | 407 Clipper St | Baracke Dba Infinity Construction | (2) bathroom remodel like for like. non structural.Details
(2) bathroom remodel like for like. non structural. | $67,000 |
| May 6, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | Baracke Dba Infinity Construction | 1 kitchen remodel and 1 full bath remodel. non structural.Details
1 kitchen remodel and 1 full bath remodel. non structural. | $56,600 |
| Apr 18, 2022 | Completed final sign-off Oct 2025 | 1741 Stockton St | Baracke Dba Infinity Construction, Boman Deign & Construction Inc, Don Rene Alvarado General Construction | 1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas.Details
1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas. | $75,000 |
| Mar 29, 2022 | Never finaled issued Mar 2022, no final | 678 02nd Av | Expert Home Builders Inc | front railing and concrete stairs repair - like to like.Details
front railing and concrete stairs repair - like to like. | $18,000 |
| Mar 15, 2022 | Completed final sign-off Feb 2023 | 1371 Masonic Av | Baracke Dba Infinity Construction | remodel 600 sq ft of interior space primarily consisting of 1 kitchen, 1 full bath, and 1 1/2 bath. 1 north lightwell window being replaced(not visible from the street) new ceiling joists being added to allow partial bearing wall removal.Details
remodel 600 sq ft of interior space primarily consisting of 1 kitchen, 1 full bath, and 1 1/2 bath. 1 north lightwell window being replaced(not visible from the street) new ceiling joists being added to allow partial bearing wall removal. | $60,000 |
| Mar 11, 2022 | Completed final sign-off Sep 2023 | 2104 23rd St | Baracke Dba Infinity Construction | one bathroom remodel and floor refinish (like to like). non structuralDetails
one bathroom remodel and floor refinish (like to like). non structural | $16,000 |
| Mar 11, 2022 | Completed final sign-off Sep 2022 | 976 Clayton St | Baracke Dba Infinity Construction | kitchen & bathroom remodel/renovation.Details
kitchen & bathroom remodel/renovation. | $16,000 |
| Mar 11, 2022 | Completed final sign-off Aug 2022 | 166 Sylvan Dr | Baracke Dba Infinity Construction | 1 kitchen renovation.Details
1 kitchen renovation. | $49,000 |
| Mar 11, 2022 | Completed final sign-off Nov 2022 | 1639 18th St | Baracke Dba Infinity Construction | 1 kitchen remodel - like to likeDetails
1 kitchen remodel - like to like | $15,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 126 Cayuga Av | Baracke Dba Infinity Construction | bathroom remodel. like for like. @ 1st floor.Details
bathroom remodel. like for like. @ 1st floor. | $31,000 |
| Feb 14, 2022 | Completed final sign-off Oct 2022 | 846 42nd Av | Expert Home Builders Inc | guest bathroom remodeling - like to like. no change to walls or windows. upgrade plumbing & electrical up to code.Details
guest bathroom remodeling - like to like. no change to walls or windows. upgrade plumbing & electrical up to code. | $9,000 |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 63 Lafayette St | Baracke Dba Infinity Construction | unit #5: bathroom remodel - like to likeDetails
unit #5: bathroom remodel - like to like | $12,500 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 578 16th Av | Baracke Dba Infinity Construction | kitchen renovation - like to like and bathroom renovation remodel. unit 580.Details
kitchen renovation - like to like and bathroom renovation remodel. unit 580. | $60,000 |
| Jan 12, 2022 | Completed final sign-off Mar 2022 | 338 20th Av | Baracke Dba Infinity Construction | bathroom remodel, like for like. one bathroom. no structural modifications. comply w/cec 150Details
bathroom remodel, like for like. one bathroom. no structural modifications. comply w/cec 150 | $25,500 |
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 166 Sylvan Dr | Baracke Dba Infinity Construction | (1) bathroom remodelDetails
(1) bathroom remodel | $49,000 |
| Dec 22, 2021 | Completed final sign-off May 2022 | 2733 Harrison St | Baracke Dba Infinity Construction | bathroom remodeling. no structural work. no wall /framing modification.Details
bathroom remodeling. no structural work. no wall /framing modification. | $20,000 |
| Nov 4, 2021 | Completed final sign-off Feb 2022 | 1015 Carolina St | Baracke Dba Infinity Construction | one bathroom remodeling - like to like. counter top replacement.Details
one bathroom remodeling - like to like. counter top replacement. | $14,000 |
| Nov 4, 2021 | Completed final sign-off Apr 2022 | 959 Corbett Av | Baracke Dba Infinity Construction | apt 11: one bathroom remodel, like to like.Details
apt 11: one bathroom remodel, like to like. | $9,000 |
| Nov 4, 2021 | Expired or cancelled expired Feb 2025 | 2781 Filbert St | Jw Builders Construction Inc, Baracke Dba Infinity Construction | one kitchen and one bathroom remodel, like to like. rewire. non structural.Details
one kitchen and one bathroom remodel, like to like. rewire. non structural. | $60,000 |
| Oct 28, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room.Details
revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room. | |
| Oct 28, 2021 | Completed final sign-off Feb 2022 | 225 Mullen Av | Baracke Dba Infinity Construction | remodel bathroom and wet bar. like for like, non structural. flooring vinyl 400sf. paint interior.Details
remodel bathroom and wet bar. like for like, non structural. flooring vinyl 400sf. paint interior. | $22,000 |
| Oct 18, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | 1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/dDetails
1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/d | $82,000 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 1118 Eddy St | Baracke Dba Infinity Construction | unit c: kitchen remodeling like to like. remodel 2.5 bathrooms like to like. rewire entire dwelling unit. patch walls and ceilings opened up for re-wire with in kind materials. maintain fire ratings.Details
unit c: kitchen remodeling like to like. remodel 2.5 bathrooms like to like. rewire entire dwelling unit. patch walls and ceilings opened up for re-wire with in kind materials. maintain fire ratings. | $80,000 |
| Sep 24, 2021 | Completed final sign-off Jun 2022 | 1095 Pacheco St | Baracke Dba Infinity Construction, Bassad Inc./Dba: Everlast Construction | bathroom remodeling like to like. upgrade plumbing and electricalDetails
bathroom remodeling like to like. upgrade plumbing and electrical | $7,500 |
| Sep 24, 2021 | Completed final sign-off Nov 2021 | 15 Vasquez Av | Bassad Inc./Dba: Everlast Construction | replace insulatio, drywall and epoxy floor at the garage. add 6 outlets and recessed lights. 400 sqft.Details
replace insulatio, drywall and epoxy floor at the garage. add 6 outlets and recessed lights. 400 sqft. | $13,500 |
| Sep 16, 2021 | Completed final sign-off Jun 2022 | 1821 Stockton St | Baracke Dba Infinity Construction | add a bathroom to the (e) laundry area & skylight on flat roof. converting closet to laundry room. redesigning closet in bedroom.Details
add a bathroom to the (e) laundry area & skylight on flat roof. converting closet to laundry room. redesigning closet in bedroom. | $30,000 |
| Jun 25, 2021 | Never finaled issued Sep 2021, no final | 815 40th Av | Sonny Builders Inc | replace wooden stairs in rearDetails
replace wooden stairs in rear | $20,000 |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 552 Roosevelt Wy | Bassad Inc./Dba: Everlast Construction | one bathroom remodeling like for like, convert tub to steam shower. no structural.Details
one bathroom remodeling like for like, convert tub to steam shower. no structural. | $15,000 |
| May 3, 2021 | Completed final sign-off Jun 2021 | 82 Lippard Av | Bassad Inc./Dba: Everlast Construction | kitchen remodeling - like for like. add 4 recessed lights , relocate refrigerator .Details
kitchen remodeling - like for like. add 4 recessed lights , relocate refrigerator . | $14,000 |
| Feb 10, 2021 | Completed final sign-off Feb 2024 | 711 46th Av | Baracke Dba Infinity Construction | 1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor.Details
1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor. | $148,000 |
| May 1, 2018 | Never finaled issued Jun 2023, no final | 2755 Harrison St | Baracke Dba Infinity Construction, Roosters Light Corp, Boman Deign & Construction Inc, David M Goray | permit to comply w/ nov #201396191 legalize an illegal unit in basementDetails
permit to comply w/ nov #201396191 legalize an illegal unit in basement | $85,000 |