Ted Bonneau
- Listed as
- architect, designer
- Firm
- Oxb Studio
- Based in
- Mill Valley
- On San Francisco permits
- Mar 2008 to Jun 2024
31 permits since 2000 (architect on 30 permits, designer on 1 permit): 24 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2024 | Completed final sign-off May 2025 | 1017 Green St | Abacus Group Builders Inc | exterior repair including the replacement of windows and new siding on both sides and the rear facade. no changes to front facade other than window sash replacement. total 77 windows w/same size and locations. total 5 doors w/same size and locations.Details
exterior repair including the replacement of windows and new siding on both sides and the rear facade. no changes to front facade other than window sash replacement. total 77 windows w/same size and locations. total 5 doors w/same size and locations. | $468,000 |
| Feb 10, 2021 | Completed final sign-off Feb 2024 | 711 46th Av | Baracke Dba Infinity Construction | 1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor.Details
1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor. | $148,000 |
| Apr 4, 2019 | Completed final sign-off Oct 2020 | 384 Fair Oaks St | Saturn Construction Co | replace handrail and guardrail and gate at extg stairs at exterior front of residence.Details
replace handrail and guardrail and gate at extg stairs at exterior front of residence. | $25,000 |
| Dec 4, 2017 | Completed final sign-off Jul 2019 | 384 Fair Oaks St | Saturn Construction Co | (n) master bath at 3rd fl. remodel roof to raise ceiling height at location of new master bathroom and laundry area. new air conditioning condenser unit to be installed on top of new flat roof. new roof does not exceed (e) roof ridge heightDetails
(n) master bath at 3rd fl. remodel roof to raise ceiling height at location of new master bathroom and laundry area. new air conditioning condenser unit to be installed on top of new flat roof. new roof does not exceed (e) roof ridge height | $17,000 |
| Oct 5, 2017 | Completed final sign-off Jul 2019 | 384 Fair Oaks St | Saturn Construction Co | interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roofDetails
interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roof | $215,350 |
| Aug 17, 2017 | Completed final sign-off Feb 2019 | 3026 Clay St | Barry M Nadell Construction Inc | revision to pa 2017-0411-3659, reposistion exterior door and window at 1st floor workspace. remodel exterior stair landing and steps at side of building. remove interior steps in workshopDetails
revision to pa 2017-0411-3659, reposistion exterior door and window at 1st floor workspace. remodel exterior stair landing and steps at side of building. remove interior steps in workshop | |
| Apr 19, 2017 | Never finaled issued Apr 2019, no final | 50 Palo Alto Av | Nicholas Spencer Firth Gen Contr | vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition.Details
vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition. | $190,500 |
| Apr 11, 2017 | Completed final sign-off Feb 2019 | 3026 Clay St | Barry M Nadell Construction Inc | interior remodel addition of conditioned space, to a sfincluding a remodel of the 1st flr utility space to include a new workshop,storage room, bathroom & family rm, interior (e) garageDetails
interior remodel addition of conditioned space, to a sfincluding a remodel of the 1st flr utility space to include a new workshop,storage room, bathroom & family rm, interior (e) garage | $148,500 |
| Aug 29, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | Nicholas Spencer Firth Gen Contr | revision to app#201605046541. restore fence and gate with new vertical stained wood slats. restore railings with horizontal stained wood boards, paint extg vertical wood siding paint extg beams.Details
revision to app#201605046541. restore fence and gate with new vertical stained wood slats. restore railings with horizontal stained wood boards, paint extg vertical wood siding paint extg beams. | $5,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2016 | 1833 Jones St | Abacus Group Builders Inc | rear yard fence & retaining wall. ref #201607212948. n/a maher ordinanceDetails
rear yard fence & retaining wall. ref #201607212948. n/a maher ordinance | $2,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2016 | 1017 Green St | Abacus Group Builders Inc | rear yard fence & retaining wall. ref #201607212942.Details
rear yard fence & retaining wall. ref #201607212942. | $2,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 730 Grand View Av | Abacus Group Builders Inc | legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher naDetails
legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher na | $100 |
| May 4, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | Nicholas Spencer Firth Gen Contr | interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking.Details
interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking. | $60,000 |
| Nov 4, 2015 | Completed final sign-off Sep 2017 | 3070 Pacific Av | Colindres & Associates | rear yard landscaping improvements to existing single family residence including new wrought iron fence at rear and west side property line, new address post next to driveway from pacifica ave, new outdoor bbq and gas pizza oven maher naDetails
rear yard landscaping improvements to existing single family residence including new wrought iron fence at rear and west side property line, new address post next to driveway from pacifica ave, new outdoor bbq and gas pizza oven maher na | $28,000 |
| Aug 28, 2015 | Completed final sign-off Oct 2016 | 1911 Vallejo St | Abacus Group Builders Inc | interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition.Details
interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition. | $69,395 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 394 Guerrero St | Nicholas Spencer Firth Gen Contr | 3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain.Details
3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain. | $90,000 |
| Jun 23, 2014 | Completed final sign-off Feb 2015 | 3026 Clay St | interior remodel of a s.f.d., including the kitchen and family room. new windows and one new door at the rear yard. no addition.Details
interior remodel of a s.f.d., including the kitchen and family room. new windows and one new door at the rear yard. no addition. | $43,365 | |
| Apr 4, 2014 | Completed final sign-off Mar 2015 | 634 30th St | Abacus Group Builders Inc | interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition).Details
interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition). | $250,000 |
| Oct 28, 2013 | Completed final sign-off Oct 2015 | 1 Quartz Wy | interior remodel of single family residence, including kitchen remodel, replacement of existing fireplace in living room. no exterior or structural workDetails
interior remodel of single family residence, including kitchen remodel, replacement of existing fireplace in living room. no exterior or structural work | $26,075 | |
| Aug 22, 2013 | Completed final sign-off Oct 2014 | 3070 Pacific Av | Colindres & Associates | revision to appl #2013.05.08.6370 - infill of lightwell at first floor for new storage room.Details
revision to appl #2013.05.08.6370 - infill of lightwell at first floor for new storage room. | $9,555 |
| May 8, 2013 | Completed final sign-off Oct 2014 | 3070 Pacific Av | Colindres & Associates | convert 380 sq ft garage into bonus room (habitable interior space. infill garage doors, with new windows above.Details
convert 380 sq ft garage into bonus room (habitable interior space. infill garage doors, with new windows above. | $34,580 |
| May 2, 2013 | Completed final sign-off Jan 2015 | 301 Main St | Nicholas Spencer Firth Gen Contr | unti #36b:interior alterations to an extg dwelling unit. no exterior or structural work. all fire resistne assemblies to remain. sprinkler under seperate permit.Details
unti #36b:interior alterations to an extg dwelling unit. no exterior or structural work. all fire resistne assemblies to remain. sprinkler under seperate permit. | $125,000 |
| Feb 25, 2013 | Completed final sign-off Apr 2014 | 266 27th Av | Nicholas Spencer Firth Gen Contr | int remodel including new master bedrm suite, new upstairs bathrm, remodel (e) upstairs bathrm, remodel int stairs, new downstairs bathrm, laundry room, remodel of downstairs family room with bar & study. no exterior work other than new sliding glass door.Details
int remodel including new master bedrm suite, new upstairs bathrm, remodel (e) upstairs bathrm, remodel int stairs, new downstairs bathrm, laundry room, remodel of downstairs family room with bar & study. no exterior work other than new sliding glass door. | $95,000 |
| Feb 28, 2012 | Never finaled issued Aug 2012, no final | 50 Palo Alto Av | Nicholas Spencer Firth Gen Contr | demolish existing deck, construct new enlarged deck.Details
demolish existing deck, construct new enlarged deck. | $30,000 |
| Feb 28, 2012 | Expired or cancelled expired May 2013 | 2525 Webster St | Abacus Group Builders Inc | revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system.Details
revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system. | $30,000 |
| Feb 28, 2012 | Completed final sign-off May 2013 | 2525 Webster St | Abacus Group Builders Inc | to complete work & obtain final inspection for work approved under pa #2010.07.08.6203.Details
to complete work & obtain final inspection for work approved under pa #2010.07.08.6203. | $9,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2012 | 2832 Sacramento St | Barry M Nadell Construction Inc | construct new basement with access from garage & new stair from floor above.Details
construct new basement with access from garage & new stair from floor above. | $90,000 |
| Jan 18, 2011 | Completed final sign-off Feb 2013 | 118 Broderick St | addition of 2nd unit @ rear of 1st floor garage. infill lightwell slot to depth of (e), non conforming rear wall of residence. submit for variance same day. roof of addition is deck for (e) upper unit. add aspiral stair from deck to rear yard.Details
addition of 2nd unit @ rear of 1st floor garage. infill lightwell slot to depth of (e), non conforming rear wall of residence. submit for variance same day. roof of addition is deck for (e) upper unit. add aspiral stair from deck to rear yard. | $150,000 | |
| Aug 26, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | Abacus Group Builders Inc | revision to pa#2010.07.08.6203 - includes engineering for elliptical stair which was excluded from previous permit application. also includes change to skylights - which was approved by jeffry ma in pre-application meeting (see letter on a1.1)Details
revision to pa#2010.07.08.6203 - includes engineering for elliptical stair which was excluded from previous permit application. also includes change to skylights - which was approved by jeffry ma in pre-application meeting (see letter on a1.1) | $35,000 |
| Jun 10, 2010 | Never finaled issued Jun 2010, no final | 32 States St | Abacus Group Builders Inc | remodel to (e) 2-story single fam. res. all work in on 2nd. flr. interior remodel of mst. bathrm. powder rm. & kit. w/ built-in cabs. in mst. bedrm. study & dining rm. exterior work includes (n) windows & exterior doors @ 2nd. flr. (n) shingles installed o/(e) sinding; (n) skylights & re-roofing.Details
remodel to (e) 2-story single fam. res. all work in on 2nd. flr. interior remodel of mst. bathrm. powder rm. & kit. w/ built-in cabs. in mst. bedrm. study & dining rm. exterior work includes (n) windows & exterior doors @ 2nd. flr. (n) shingles installed o/(e) sinding; (n) skylights & re-roofing. | $200,000 |
| Mar 26, 2008 | Expired or cancelled expired Sep 2009 | 50 Palo Alto Av | Nicholas Spencer Firth Gen Contr | interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail.Details
interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail. | $250,000 |