Calin C Smith
- License
- C57642
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C57642 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Smith Engineering, Inc.
- Based in
- Berkeley
- On San Francisco permits
- Aug 2009 to Apr 2024
82 permits since 2000 (engineer on 77 permits, architect on 3 permits, designer on 2 permits, authorized agent-others on 1 permit): 63 completed, 1 in progress, 8 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Doherty Restoration, Inc. (16), Block 12 Construction (8), Saarman Construction,Ltd. (6), Mulhall Construction Inc. (3), Alpha Restoration & Wateproof (2), Bai Construction (2), Everbuilt Construction, Inc. (2), H C L Construction Inc. (2), Nextech Security Solutions (2), Velox Construction (2), Woods Const Co (2), Christopher Wells Construction Inc., De Brus Construction Inc, Diamond Home Restoration, E.J. Builders, Glenn James Perrin, H Y Construction Inc., Il Nido Designs Llc, J Reilly Construction, Jln Builders, K J Woods Construction Inc, L H Construction, Make Ready Maintenance Inc, Millsap Degnan & Associates, Nicholas Spencer Firth Gen Contr, R B C General Contractors Inc., Sft Construction Corp, Strong Builders Construction Inc., Velox Construction Inc/Velox Des & Const, Wong Construction Inc, Yk Mason & Sons Inc
- Architects
- Terry Lofrano (5), Lisa Harvey (2), Ethan Andersen, Ethan C Anderson, Stephen M. Arnold, Ted Bonneau
- Engineers
- Adnan Al. Adeeb
- Authorized agents
- John Sangiacomo, Kirc J. Castelluccio
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2024 | Completed final sign-off Dec 2024 | 630 Fillmore St | Millsap Degnan & Associates | revision to permit# 202402155988 for phase 1- as built for voluntary underpinning/shoring east foundation. phase 2- retaining wall replacement along east property line. to comply w/ nov 202299038Details
revision to permit# 202402155988 for phase 1- as built for voluntary underpinning/shoring east foundation. phase 2- retaining wall replacement along east property line. to comply w/ nov 202299038 | $45,000 |
| Dec 1, 2023 | Completed final sign-off Apr 2024 | 145 Laurel St | Block 12 Construction | unit 17: remodel and phase iii completion of phase 1 of volutary seismic strengthening work within unit 17.Details
unit 17: remodel and phase iii completion of phase 1 of volutary seismic strengthening work within unit 17. | $85,000 |
| Nov 9, 2023 | Completed final sign-off Feb 2024 | 3055 Pacific Av | Christopher Wells Construction Inc. | as built record set of additional structural work as req for rot repair for permit 202307051450.Details
as built record set of additional structural work as req for rot repair for permit 202307051450. | $15,000 |
| Aug 2, 2023 | Completed final sign-off Dec 2024 | 579 Castro St | Mulhall Construction Inc. | revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567.Details
revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567. | $49,000 |
| Apr 12, 2023 | Completed final sign-off Dec 2024 | 577 Castro St | Mulhall Construction Inc. | revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4Details
revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4 | $200,000 |
| Jan 13, 2023 | Completed final sign-off Jul 2023 | 145 Laurel St | Block 12 Construction | 1-6/flr: revisions to pa# 2022-0711-8184: new washer and dryer as shown on plans. unit #16: 1-kitchen remodel.Details
1-6/flr: revisions to pa# 2022-0711-8184: new washer and dryer as shown on plans. unit #16: 1-kitchen remodel. | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 3146 Divisadero St | Block 12 Construction | per adu ordinance# 162-16, conversion of groun level garage & storage to 3 new adu, laundry & mechanical.Details
per adu ordinance# 162-16, conversion of groun level garage & storage to 3 new adu, laundry & mechanical. | $450,000 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 145 Laurel St | Alpha Restoration & Wateproof | column repair at front sw corner garage phase vii.Details
column repair at front sw corner garage phase vii. | $10,000 |
| Jul 11, 2022 | Completed final sign-off Aug 2023 | 145 Laurel St | Block 12 Construction | phase 5 - new washer/elec dryer for individual units.Details
phase 5 - new washer/elec dryer for individual units. | $90,000 |
| Jun 3, 2022 | Completed final sign-off Oct 2022 | 1388 Gough St | Saarman Construction,Ltd. | install guardrail at low "unoccupied" roof at east side of propery.Details
install guardrail at low "unoccupied" roof at east side of propery. | $18,000 |
| Feb 1, 2022 | Completed final sign-off May 2025 | 1448 Willard St | Saarman Construction,Ltd. | addition & remodel of (e) residential unit & addition of (1) (n) unit.Details
addition & remodel of (e) residential unit & addition of (1) (n) unit. | $100,000 |
| Nov 3, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | field revision to fdn work @ grade: remove (e) collum pad ftss & from continue grade bms. revision to 201506098533 & 201905100348Details
field revision to fdn work @ grade: remove (e) collum pad ftss & from continue grade bms. revision to 201506098533 & 201905100348 | $10 |
| Aug 20, 2021 | In progress issued Oct 2024 | 372 Dolores St | K J Woods Construction Inc | convert existing first floor storage/ basement of four story multi-family residential building to one adu.Details
convert existing first floor storage/ basement of four story multi-family residential building to one adu. | $300,000 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 2101 California St | Block 12 Construction | unit #2: ref pa# 202107194614. structural work only. relocate walls as required for apartment unit #2 remodel. install new lower storage level post & foundation for (e) beam support.Details
unit #2: ref pa# 202107194614. structural work only. relocate walls as required for apartment unit #2 remodel. install new lower storage level post & foundation for (e) beam support. | $12,000 |
| Jun 1, 2021 | Completed final sign-off Mar 2022 | 145 Laurel St | Alpha Restoration & Wateproof | phase iii (part 2): voluntary masonry veneer/curtain wall repairing, strengthening, and related facade. water proofing repair to amend pa 202011068372. ref. pa 201911258135Details
phase iii (part 2): voluntary masonry veneer/curtain wall repairing, strengthening, and related facade. water proofing repair to amend pa 202011068372. ref. pa 201911258135 | $400,000 |
| Apr 12, 2021 | Completed final sign-off Mar 2022 | 2101 California St | Block 12 Construction | unit #1: revision to pa# 202102104366. relocate walls walls for remodel. convert 1 bedroom unit to 2 bedrom unit.Details
unit #1: revision to pa# 202102104366. relocate walls walls for remodel. convert 1 bedroom unit to 2 bedrom unit. | $49,000 |
| Mar 30, 2021 | Expired or cancelled cancelled Jan 2026 | 792 Bay St | administrative permit to clarification of approved soft-story permit 2015 1112 2404 as a voluntary seismic upgrade per ab. 094. note this is a permit to verify that the reference pa #2015 1112 2404 meets the requriements of ab-094 structurally.Details
administrative permit to clarification of approved soft-story permit 2015 1112 2404 as a voluntary seismic upgrade per ab. 094. note this is a permit to verify that the reference pa #2015 1112 2404 meets the requriements of ab-094 structurally. | ||
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 166 Meadowbrook Dr | Velox Construction Inc/Velox Des & Const | remodel (e) 2-story single family residence and develope the rear half of the garage into living space, no alterations to the exterior of the building are proposedDetails
remodel (e) 2-story single family residence and develope the rear half of the garage into living space, no alterations to the exterior of the building are proposed | $130,000 |
| Jan 21, 2020 | Never finaled issued Feb 2020, no final | 1460 Golden Gate Av | Block 12 Construction | unit 12; remodel of 1 existing unitDetails
unit 12; remodel of 1 existing unit | $50,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 725 Greenwich St | Saarman Construction,Ltd. | exterior wall repair - voluntary wood beam post repair for multistory commercial structure. design per 100% 1979 ubc for original loadingDetails
exterior wall repair - voluntary wood beam post repair for multistory commercial structure. design per 100% 1979 ubc for original loading | $30,000 |
| Dec 12, 2019 | Never finaled issued Aug 2020, no final | 77 Ramona Av | voluntary soft story seismic strengthening of type v structure per sfpb ab-094. elective design base shear for 100% cbc at target story. widen tradesman corridor, relocate water heater.Details
voluntary soft story seismic strengthening of type v structure per sfpb ab-094. elective design base shear for 100% cbc at target story. widen tradesman corridor, relocate water heater. | $120,000 | |
| Oct 23, 2019 | Completed final sign-off Dec 2020 | 2041 Hyde St | De Brus Construction Inc | replace exterior landscape retaining wallDetails
replace exterior landscape retaining wall | $12,000 |
| Oct 4, 2019 | Completed final sign-off Jul 2020 | 990 Bay St | Doherty Restoration, Inc. | voluntary structural strengthening. new concrete shear wall. ref app# 2014 0604 7505Details
voluntary structural strengthening. new concrete shear wall. ref app# 2014 0604 7505 | $30,000 |
| Aug 28, 2019 | Completed final sign-off Nov 2020 | 720 Haight St | Velox Construction | seismic stregthening first floor soft story ord 66-13Details
seismic stregthening first floor soft story ord 66-13 | $90,000 |
| Feb 4, 2019 | Completed final sign-off Apr 2023 | 737 Ashbury St | L H Construction | sfbc ab-094: voluntary soft story seismic strengthening and remodel of garage/storage at ground level.Details
sfbc ab-094: voluntary soft story seismic strengthening and remodel of garage/storage at ground level. | $120,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | Jln Builders | lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbingDetails
lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbing | $285,000 |
| Jun 20, 2018 | Expired or cancelled cancelled Jan 2026 | 2485 Folsom St | remoedl of basement level to increase head height gor future adu. design base shear for 100% cbc at target story per app a4Details
remoedl of basement level to increase head height gor future adu. design base shear for 100% cbc at target story per app a4 | $85,000 | |
| Apr 5, 2018 | Completed final sign-off May 2021 | 990 Bay St | Doherty Restoration, Inc. | construct one (n) residential unit done in conjunction w/ ordinance 162-16.Details
construct one (n) residential unit done in conjunction w/ ordinance 162-16. | $90,000 |
| Jan 10, 2018 | Completed final sign-off Sep 2019 | 559 24th Av | Doherty Restoration, Inc. | soft story strengthening of tier iii structures per sfebc ch 4d as amended by ab-107. design base shear for 100% cbc at target storyDetails
soft story strengthening of tier iii structures per sfebc ch 4d as amended by ab-107. design base shear for 100% cbc at target story | $75,000 |
| Dec 28, 2017 | Completed final sign-off Oct 2018 | 4740 Balboa St | revision to 201606018897, 1st fl remodel, removal of load bearing wall and replace with steel beamDetails
revision to 201606018897, 1st fl remodel, removal of load bearing wall and replace with steel beam | $5,000 | |
| Nov 30, 2017 | Completed final sign-off Feb 2019 | 566 Lombard St | H C L Construction Inc. | unit #7: renovation of existing apartment in conjunction with soft story(reference bpa# 201706068550) retrofit work; incorporated additional square footage and add a bedroom, renovate bathroom.Details
unit #7: renovation of existing apartment in conjunction with soft story(reference bpa# 201706068550) retrofit work; incorporated additional square footage and add a bedroom, renovate bathroom. | $46,000 |
| Sep 26, 2017 | Completed final sign-off Jan 2019 | 165 Vasquez Av | Il Nido Designs Llc | excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powderDetails
excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powder | $225,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2022 | 1497 Church St | Nextech Security Solutions | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201709148220Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201709148220 | $40,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2022 | 288 27th St | Nextech Security Solutions | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201709148222Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201709148222 | $45,000 |
| Sep 13, 2017 | Completed final sign-off Sep 2018 | 325 Maple St | Everbuilt Construction, Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. per sf ab-66.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. per sf ab-66. | $90,000 |
| Sep 12, 2017 | Completed final sign-off Sep 2019 | 775 Haight St | revision to app#201512114787 (commercial) & 201512114791(residential). replace sheets s0.1,s1.1-3, & s2.1-4; structural revision tier iv structure per sfebc chapter 4 as amended by ab107, appendix a4. design base shear for 100% cbc atDetails
revision to app#201512114787 (commercial) & 201512114791(residential). replace sheets s0.1,s1.1-3, & s2.1-4; structural revision tier iv structure per sfebc chapter 4 as amended by ab107, appendix a4. design base shear for 100% cbc at | $100,000 | |
| Sep 5, 2017 | Completed final sign-off Nov 2018 | 2665 Franklin St | Sft Construction Corp | soft story retrofit per sfebc chapter 4d engineering criteria asce 41-06Details
soft story retrofit per sfebc chapter 4d engineering criteria asce 41-06 | $20,000 |
| Sep 5, 2017 | Completed final sign-off Aug 2019 | 3075 22nd St | Woods Const Co | soft story retrofit per sfebc chapter 4d engineering criteria asce 41-06 2016 cebc appendix a-4. design base shear for 100% cbc at target story. frame to be placed on exterior of north elevation. plans do not show projection past property line per cp-zocDetails
soft story retrofit per sfebc chapter 4d engineering criteria asce 41-06 2016 cebc appendix a-4. design base shear for 100% cbc at target story. frame to be placed on exterior of north elevation. plans do not show projection past property line per cp-zoc | $95,000 |
| Aug 31, 2017 | Completed final sign-off Jul 2019 | 1656 Leavenworth St | Doherty Restoration, Inc. | soft story retrofit per sfebc chapter 4d: other rational design. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: other rational design. n/a for maher | $75,000 |
| Aug 30, 2017 | Completed final sign-off Jul 2018 | 2940 Van Ness Av | Everbuilt Construction, Inc. | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $75,000 |
| Aug 29, 2017 | Expired or cancelled expired Nov 2021 | 372 Dolores St | Woods Const Co | soft story retrofit for tier iii structure per sfebc chapter 4d as amended by ab-107 design base shear for 75% cebc at target story.Details
soft story retrofit for tier iii structure per sfebc chapter 4d as amended by ab-107 design base shear for 75% cebc at target story. | $85,000 |
| Aug 25, 2017 | Completed final sign-off Sep 2019 | 769 Haight St | Velox Construction | soft story retrofit per sfebc chapter 4d: other rational design.Details
soft story retrofit per sfebc chapter 4d: other rational design. | $100,000 |
| Aug 10, 2017 | Never finaled issued Sep 2017, no final | 1701 Jones St | Doherty Restoration, Inc. | voluntary seismic strengthening, revision to #201702239994, for discovered as-built conditions and minor shear wall and foundation configuration changes.Details
voluntary seismic strengthening, revision to #201702239994, for discovered as-built conditions and minor shear wall and foundation configuration changes. | |
| Aug 1, 2017 | Expired or cancelled cancelled Jul 2024 | 2150 Taylor St | soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 | |
| Aug 1, 2017 | Completed final sign-off Aug 2023 | 2154 Taylor St | Yk Mason & Sons Inc | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2020 | 2160 Taylor St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 |
| Jun 15, 2017 | Completed final sign-off May 2018 | 145 Laurel St | Saarman Construction,Ltd. | revision to 201411191978, 201607071796 for discovered as built conditions and minor shear wall configuration changesDetails
revision to 201411191978, 201607071796 for discovered as built conditions and minor shear wall configuration changes | |
| Jun 6, 2017 | Completed final sign-off Feb 2019 | 566 Lombard St | H C L Construction Inc. | soft story retrofit per 2016 sfebc chapter 4d, 75% cbc of target story as amended by sfbc ordinance ab-66-13. structural strenghtening: steel frame, plywood shearwall, conc. footings.Details
soft story retrofit per 2016 sfebc chapter 4d, 75% cbc of target story as amended by sfbc ordinance ab-66-13. structural strenghtening: steel frame, plywood shearwall, conc. footings. | $85,000 |
| May 19, 2017 | Never finaled issued May 2017, no final | 390 Bartlett St | Make Ready Maintenance Inc | revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartmentDetails
revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartment | $3,000 |
| Apr 7, 2017 | Completed final sign-off Jul 2019 | 90 Nido Av | Wong Construction Inc | ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc)Details
ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc) | $60,000 |
| Feb 23, 2017 | Never finaled issued Aug 2017, no final | 1701 Jones St | Doherty Restoration, Inc. | voluntary seismic strengthening similar to soft story requirements of sf ord 66-13 seismic design level is 100% 8Details
voluntary seismic strengthening similar to soft story requirements of sf ord 66-13 seismic design level is 100% 8 | $85,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2020 | 7555 Geary Bl | Strong Builders Construction Inc. | to comply with nov 21672378 - mandatory seismic stregthening for soft story per sfbc ord 66-13 submittal replaces eariler application for voluntary soft stroy program under application 201208298532 design uses full cbc level base shearDetails
to comply with nov 21672378 - mandatory seismic stregthening for soft story per sfbc ord 66-13 submittal replaces eariler application for voluntary soft stroy program under application 201208298532 design uses full cbc level base shear | $120,000 |
| Sep 15, 2016 | Completed final sign-off Jun 2018 | 3649 18th St | Doherty Restoration, Inc. | mandatory seismic strengthening per ordinance 66.13 for soft story per sfbc ch 34b, other rational design.Details
mandatory seismic strengthening per ordinance 66.13 for soft story per sfbc ch 34b, other rational design. | $90,000 |
| Sep 14, 2016 | Completed final sign-off Sep 2018 | 390 Bartlett St | Doherty Restoration, Inc. | mandatory seismic streghtening per ord 66-13 for soft story per full ubc design base shearDetails
mandatory seismic streghtening per ord 66-13 for soft story per full ubc design base shear | $90,000 |
| Aug 31, 2016 | Completed final sign-off May 2019 | 3317 Mission St | E.J. Builders | soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story.Details
soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story. | $100,000 |
| Jul 7, 2016 | Completed final sign-off May 2018 | 145 Laurel St | phase ii shear core voluntary seismic strengthening and revisions for as built conditions for 201411191978 phase 1Details
phase ii shear core voluntary seismic strengthening and revisions for as built conditions for 201411191978 phase 1 | $250,000 | |
| Jun 10, 2016 | Completed final sign-off Oct 2018 | 4740 Balboa St | Bai Construction | design revisions to permit 201511021434 to replace columns w/steel & provide new foundations as required to improve head height,including drainage in garage/utility area.Details
design revisions to permit 201511021434 to replace columns w/steel & provide new foundations as required to improve head height,including drainage in garage/utility area. | $60,000 |
| Apr 14, 2016 | Expired or cancelled expired Jun 2017 | 2481 Folsom St | Doherty Restoration, Inc. | revision to pa #201511233342 to adjust/remove exisitng columns & replace w/new steel beams & columns, & new foundations where required, designed to 100% cbc.Details
revision to pa #201511233342 to adjust/remove exisitng columns & replace w/new steel beams & columns, & new foundations where required, designed to 100% cbc. | $35,000 |
| Apr 8, 2016 | Completed final sign-off Sep 2019 | 3110 Clay St | Doherty Restoration, Inc. | design revision to pa#201509248028 & 201601207495 to adjust column locations, modify detailing for as built conditions, new foundations where required to improve head height and improve drainage.Details
design revision to pa#201509248028 & 201601207495 to adjust column locations, modify detailing for as built conditions, new foundations where required to improve head height and improve drainage. | $60,000 |
| Jan 14, 2016 | Completed final sign-off Aug 2017 | 575 Pierce St | Saarman Construction,Ltd. | updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maherDetails
updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maher | |
| Nov 23, 2015 | Expired or cancelled expired Jun 2017 | 2481 Folsom St | Doherty Restoration, Inc. | voluntary seismic retrofit ab094 design criteria 2013 cbc 3404.5 & sfbc ch34 iebc-a4, 100% cbc. relocate first floor columns to widen parking access.Details
voluntary seismic retrofit ab094 design criteria 2013 cbc 3404.5 & sfbc ch34 iebc-a4, 100% cbc. relocate first floor columns to widen parking access. | $90,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2017 | 792 Bay St | Doherty Restoration, Inc. | voluntary seismic retrofit in accordance with 2013 cbc 3404.5 as per current sfbc. n/a for maher.Details
voluntary seismic retrofit in accordance with 2013 cbc 3404.5 as per current sfbc. n/a for maher. | $100,000 |
| Nov 2, 2015 | Completed final sign-off Mar 2017 | 4740 Balboa St | Bai Construction | soft story retrofit per sfbc chapter 34b. engineering criteria: other rational design 100% cbc.Details
soft story retrofit per sfbc chapter 34b. engineering criteria: other rational design 100% cbc. | $120,000 |
| Sep 30, 2015 | Completed final sign-off Apr 2017 | 470 Frederick St | seismic soft story retrofit per ordinance 66.13. design level, equiv. 100% cbc. other rational design.Details
seismic soft story retrofit per ordinance 66.13. design level, equiv. 100% cbc. other rational design. | $50,000 | |
| Sep 24, 2015 | Completed final sign-off Sep 2019 | 3110 Clay St | Doherty Restoration, Inc. | seismic soft story retrofit per ord 66-13. design level equiv 100% cbcDetails
seismic soft story retrofit per ord 66-13. design level equiv 100% cbc | $95,000 |
| Jun 23, 2015 | Completed final sign-off Mar 2017 | 23 Franklin St | Doherty Restoration, Inc. | mandatory seismic strengthening per sfbc ordinance 66-13 adding new plywood shear walls and new conc foundations at gr flDetails
mandatory seismic strengthening per sfbc ordinance 66-13 adding new plywood shear walls and new conc foundations at gr fl | $50,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 5 Danvers St | Doherty Restoration, Inc. | mandatory seismic strengthening and foundation repair per sfbc 34b, 2012 iebc appendix a-4, per san francisco ordinance no 66.13, rev. 6/18/2015.Details
mandatory seismic strengthening and foundation repair per sfbc 34b, 2012 iebc appendix a-4, per san francisco ordinance no 66.13, rev. 6/18/2015. | $60,000 |
| May 20, 2015 | Completed final sign-off Aug 2018 | 420 14th St | Glenn James Perrin | soft storey retrofit program mandatory seismic strengthening per ord. 66-13Details
soft storey retrofit program mandatory seismic strengthening per ord. 66-13 | $90,000 |
| Nov 19, 2014 | Completed final sign-off May 2018 | 145 Laurel St | voluntary seismic strengthen of steel frame structure with masonry & concrete walls. correction include strengthening vertical discontinuity & adding concrete shearwalls at the lower levels.Details
voluntary seismic strengthen of steel frame structure with masonry & concrete walls. correction include strengthening vertical discontinuity & adding concrete shearwalls at the lower levels. | $180,000 | |
| Sep 17, 2014 | Expired or cancelled expired Feb 2017 | 388 Arlington St | J Reilly Construction | replace in kind retaining wall and stairs, seismic strengthen of front of house.Details
replace in kind retaining wall and stairs, seismic strengthen of front of house. | $90,000 |
| Jun 4, 2014 | Completed final sign-off Sep 2015 | 990 Bay St | Saarman Construction,Ltd. | voluntary seismic strengthening of concrete and steel-framed. structural to correct vertical offset discontinuity and strengthen shearwalls at front with new concrete shearwalls.Details
voluntary seismic strengthening of concrete and steel-framed. structural to correct vertical offset discontinuity and strengthen shearwalls at front with new concrete shearwalls. | $90,000 |
| Oct 31, 2013 | Completed final sign-off Jul 2020 | 767 Valencia St | construction of (3) (n) residential units on a (n) 3rd fl including (1) kitchen & (1) bathroom per residence.Details
construction of (3) (n) residential units on a (n) 3rd fl including (1) kitchen & (1) bathroom per residence. | $50,000 | |
| Feb 15, 2013 | Completed final sign-off Feb 2014 | 544 Hill St | Doherty Restoration, Inc. | new master bath (2nd floor), relocate kitchen, renovate basement, powder room, bathroom, new roof deck, replace exterior stair.Details
new master bath (2nd floor), relocate kitchen, renovate basement, powder room, bathroom, new roof deck, replace exterior stair. | $225,000 |
| Sep 19, 2012 | Completed final sign-off Feb 2013 | 1886 18th Av | H Y Construction Inc. | construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain.Details
construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain. | $60,000 |
| Aug 29, 2012 | Expired or cancelled withdrawn Oct 2016 | 7555 Geary Bl | voluntary seismic strengthening, provide accurate scope of work and matching scope on plans. maintain access and egress to the occupied residential building. provide safe portal, fire escape work comply with ab 0.19 sec 2.3.Details
voluntary seismic strengthening, provide accurate scope of work and matching scope on plans. maintain access and egress to the occupied residential building. provide safe portal, fire escape work comply with ab 0.19 sec 2.3. | $95,000 | |
| Aug 21, 2012 | Completed final sign-off Feb 2013 | 3055 Pacific Av | Diamond Home Restoration | voluntary seismic strengthening with moment frame interior of garage door; 1 interior braced frame cripple wall strengthening with plywood, anchor bolts below 2nd floor.Details
voluntary seismic strengthening with moment frame interior of garage door; 1 interior braced frame cripple wall strengthening with plywood, anchor bolts below 2nd floor. | $176,000 |
| Aug 14, 2012 | Expired or cancelled cancelled Jan 2026 | 242 30th Av | addition of new deck to single family residence. | $10,000 | |
| May 31, 2012 | Completed final sign-off Jul 2013 | 777 Valencia St | revision to pa# 2010/12/29/7585. work include minor floor plan layout modifications. relocate stair, new brace frame for voluntary seismic upgrade. new 2nd floor office/changing room, bathroom in (e) attic space.Details
revision to pa# 2010/12/29/7585. work include minor floor plan layout modifications. relocate stair, new brace frame for voluntary seismic upgrade. new 2nd floor office/changing room, bathroom in (e) attic space. | $30,000 | |
| Feb 28, 2012 | Never finaled issued Aug 2012, no final | 50 Palo Alto Av | Nicholas Spencer Firth Gen Contr | demolish existing deck, construct new enlarged deck.Details
demolish existing deck, construct new enlarged deck. | $30,000 |
| Dec 29, 2010 | Completed final sign-off Jul 2013 | 777 Valencia St | tenant improvement for restaurant, bar establishment, jazz club includes kitchen, bathrooms, mezzanine on 1st floor.Details
tenant improvement for restaurant, bar establishment, jazz club includes kitchen, bathrooms, mezzanine on 1st floor. | $600,000 | |
| May 28, 2010 | Expired or cancelled expired Oct 2014 | 739 Valencia St | remodel facade, (n) windows, door. remove interior walls, 2-bathrooms, ground flr. deck, re-build int. stairs.Details
remodel facade, (n) windows, door. remove interior walls, 2-bathrooms, ground flr. deck, re-build int. stairs. | $48,000 | |
| Aug 5, 2009 | Completed final sign-off Dec 2009 | 44 Levant St | R B C General Contractors Inc. | remodel kitchen, open wall, transfer shear wall to exterior wallDetails
remodel kitchen, open wall, transfer shear wall to exterior wall | $25,000 |