Block 3583, lot 059
577 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 14,985 sq ft
- Lot
- 6,124 sq ft
- Zoning
- CASTRO
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 577 Castro St | Chaney Construction | unit 202: paint entire unit. new upper & lower kitchen cabinets, new kitchen countertops. remove tub surround. new tiles on tub surround. new bathroom vanity and countertops. repair damaged/rotten wood sash windowns (not street visible) install new lvp flooring in kitchen & eat area. new appliances.Details
unit 202: paint entire unit. new upper & lower kitchen cabinets, new kitchen countertops. remove tub surround. new tiles on tub surround. new bathroom vanity and countertops. repair damaged/rotten wood sash windowns (not street visible) install new lvp flooring in kitchen & eat area. new appliances. | $30,000 |
| Oct 18, 2023 | Completed final sign-off Dec 2024 | 577 Castro St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $24,600 |
| Aug 2, 2023 | Completed final sign-off Dec 2024 | 579 Castro St | Mulhall Construction Inc. | revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567.Details
revision to pa 201708013542: mandatory soft story oridinance 66-13 design to comply with 2022 cebc appendix a-4 (for commercial only under 579 castro st). reference to pa #202304125567. | $49,000 |
| Apr 12, 2023 | Completed final sign-off Dec 2024 | 577 Castro St | Mulhall Construction Inc. | revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4Details
revision to permit# 201708013542. soft story (residential component) mandatary under ordinance 66-13 design comply with 2022 cebc appendix a4 | $200,000 |
| May 15, 2019 | Completed final sign-off Jun 2019 | 577 Castro St | San Francisco Fire Protection | replace fire panel.Details
replace fire panel. | $3,200 |
| Aug 1, 2017 | Expired or cancelled expired Feb 2025 | 577 Castro St | S F Garage Company Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, install (n) moment frames & shear walls.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, install (n) moment frames & shear walls. | $45,000 |
| Jun 13, 2017 | Expired or cancelled cancelled Oct 2022 | 577 Castro St | addition of 2 new units per ord no. 162-16. (n) pantry/storage for (e) restaurant. (n) studio w/ 1 bathroom, 1 kitchen. new studio w/ 1 bathroom, 1 kitchen. (n) studio w/ 1 bathroom, 1 kitchen.Details
addition of 2 new units per ord no. 162-16. (n) pantry/storage for (e) restaurant. (n) studio w/ 1 bathroom, 1 kitchen. new studio w/ 1 bathroom, 1 kitchen. (n) studio w/ 1 bathroom, 1 kitchen. | $160,000 | |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 577 Castro St | street spaceDetails
street space | ||
| Dec 22, 2014 | Expired or cancelled withdrawn Jul 2017 | 577 Castro St | a new unmanned tel. communication facility for at&t mobility, consisting of 9 new antennas camo'd behind a screen along with associated radio equipment in garage.Details
a new unmanned tel. communication facility for at&t mobility, consisting of 9 new antennas camo'd behind a screen along with associated radio equipment in garage. | $150,000 | |
| Oct 5, 2006 | Expired or cancelled cancelled Sep 2007 | 577 Castro St | installation of 2 microcell antennas mounted on (e) penthouse wall at roof level with the associated equipment cabinet mounted on the ground. no batteries.Details
installation of 2 microcell antennas mounted on (e) penthouse wall at roof level with the associated equipment cabinet mounted on the ground. no batteries. | $65,000 | |
| Apr 20, 2005 | Completed final sign-off Aug 2005 | 577 Castro St | Lucky Ching Construction | install new column on the wall, for recessed electrical box relocated nearby in hallway. see app 200Details
install new column on the wall, for recessed electrical box relocated nearby in hallway. see app 200 | $2,500 |
| Nov 30, 2004 | Completed final sign-off Dec 2004 | 577 Castro St | S One Construction | reroofingDetails
reroofing | $15,000 |
| Aug 30, 2004 | Never finaled issued Aug 2004, no final | 577 Castro St | Yu Kwan Construction Co. | remove and replace extg elect. equipment upgrade/work paid under app #200408252503Details
remove and replace extg elect. equipment upgrade/work paid under app #200408252503 | $1,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.