Block 1112, lot 024
90 Nido Ave
- City’s use
- Multi-Family Residential
- Built
- 1956
- Stories
- 2
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 5,616 sq ft
- Lot
- 4,591 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
3 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 7, 2017 | Completed final sign-off Jul 2019 | 90 Nido Av | Wong Construction Inc | ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc)Details
ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc) | $60,000 |
| Jun 15, 2004 | Completed final sign-off Jul 2004 | 90 Nido Av | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $18,930 |
| Oct 28, 2003 | Completed final sign-off Nov 2003 | 90 Nido Av | New World General Construction | repair back stairs. less than or equal to 50%. nov 200344371.Details
repair back stairs. less than or equal to 50%. nov 200344371. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- New World General Construction, Safeway Roofing & Siding Co., Wong Construction Inc
- Engineers
- Smith Engineering Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.