Block 0824, lot 001
575 Pierce St
- City’s use
- Multi-Family Residential
- Built
- 1930
- Stories
- 6
- Units
- 36
- Rooms
- 36 bedrooms, 36 bathrooms
- Building
- 32,400 sq ft
- Lot
- 6,443 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
53 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 575 Pierce St | Block 12 Construction | #505: in kind bathroom remodel. no wall changes, new electrical plugs and switches, new plumbing and fixtures and shower pan.Details
#505: in kind bathroom remodel. no wall changes, new electrical plugs and switches, new plumbing and fixtures and shower pan. | $40,000 |
| Mar 29, 2024 | In progress issued Apr 2024 | 575 Pierce St | Silva's Fire Protection Llc | as built to pa# 202403137714.Details
as built to pa# 202403137714. | |
| Mar 13, 2024 | Completed final sign-off May 2024 | 575 Pierce St | Silva's Fire Protection Llc | fire sprinkler - proposed overhead automatice fire sprinkler system to be installed at 1/f adu. ref permit 201908158936.Details
fire sprinkler - proposed overhead automatice fire sprinkler system to be installed at 1/f adu. ref permit 201908158936. | $12,000 |
| Dec 7, 2022 | Completed final sign-off Jun 2024 | 575 Pierce St | Crime Watch Security Sys Llc | like for like fire system replacement w/new control panel. smoke detectors and pull stations at the same locations. install radio and power supply panel. new low frequency horns inside all units. replace exists bells with new horn/strobe at the original locationsDetails
like for like fire system replacement w/new control panel. smoke detectors and pull stations at the same locations. install radio and power supply panel. new low frequency horns inside all units. replace exists bells with new horn/strobe at the original locations | $40,000 |
| May 28, 2021 | Completed final sign-off Nov 2021 | 575 Pierce St | Block 12 Construction | #403 remodel. removal of non-structural walls. new kitchen cabs, appliances, finishes, fixtures, new electrical plugs/switchesDetails
#403 remodel. removal of non-structural walls. new kitchen cabs, appliances, finishes, fixtures, new electrical plugs/switches | $49,000 |
| May 11, 2021 | Completed final sign-off Nov 2021 | 575 Pierce St | Block 12 Construction | unit 403: in kind kitchen and bath remodelDetails
unit 403: in kind kitchen and bath remodel | $49,000 |
| Apr 19, 2021 | Completed final sign-off Oct 2021 | 575 Pierce St | Block 12 Construction | in kind kitchen and bath remodelDetails
in kind kitchen and bath remodel | $49,000 |
| Oct 28, 2020 | Expired or cancelled cancelled Nov 2022 | 575 Pierce St | Kwong Associates | fire panel upgrade, low-frequency annunciator in bedroomsDetails
fire panel upgrade, low-frequency annunciator in bedrooms | $60,000 |
| Sep 5, 2020 | Completed final sign-off Apr 2021 | 575 Pierce St | Block 12 Construction | unit 605: unit remodel, removal of non-structural walls, new kitchen, cabinets, applicances, finishes, fixtures, new electrical plugs/switchesDetails
unit 605: unit remodel, removal of non-structural walls, new kitchen, cabinets, applicances, finishes, fixtures, new electrical plugs/switches | $70,000 |
| Jul 21, 2020 | Completed final sign-off Dec 2020 | 575 Pierce St | Block 12 Construction | unit remodel #202: removal of non-sturctural walls. demo (e) kitchen & bathroom. construction of new bath & kitchen, apliances, fixtures. new electircal plugs, switches. maher naDetails
unit remodel #202: removal of non-sturctural walls. demo (e) kitchen & bathroom. construction of new bath & kitchen, apliances, fixtures. new electircal plugs, switches. maher na | $60,000 |
| Jul 21, 2020 | Expired or cancelled suspend Sep 2025 | 575 Pierce St | Block 12 Construction | #102: unit remodel. removal of non structural walls. new kitchen, appliances, fixtures, new electrical plugs/switches.Details
#102: unit remodel. removal of non structural walls. new kitchen, appliances, fixtures, new electrical plugs/switches. | $60,000 |
| Jul 13, 2020 | Expired or cancelled cancelled Nov 2020 | 575 Pierce St | Kwong Associates | unit #202: remodel kitchen & bathroom, electrical upgarde (in kind)Details
unit #202: remodel kitchen & bathroom, electrical upgarde (in kind) | $60,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 575 Pierce St | Kwong Associates | unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basementDetails
unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basement | $60,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 575 Pierce St | street spaceDetails
street space | ||
| Aug 15, 2019 | Completed final sign-off Feb 2025 | 575 Pierce St | Block 12 Construction | addition of (1) adu, demo of non-load bearing walls & penetratons of some load bearing walls - ordinance #162-16Details
addition of (1) adu, demo of non-load bearing walls & penetratons of some load bearing walls - ordinance #162-16 | $160,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 575 Pierce St | Doherty Restoration, Inc. | #405: no change to occupancy, egress, relocate kitchen, remodel bath, demo of non-structural partitions, new plumbing & kitchen fixtures. no ext workDetails
#405: no change to occupancy, egress, relocate kitchen, remodel bath, demo of non-structural partitions, new plumbing & kitchen fixtures. no ext work | $45,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 575 Pierce St | street spaceDetails
street space | ||
| Feb 8, 2019 | Completed final sign-off Apr 2019 | 575 Pierce St | Doherty Restoration, Inc. | renovate e kitchen and bath. removal non structural walls and construction of new non structural walls as per plans. elec & plumbing sepDetails
renovate e kitchen and bath. removal non structural walls and construction of new non structural walls as per plans. elec & plumbing sep | $45,500 |
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 575 Pierce St | street spaceDetails
street space | ||
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 575 Pierce St | street space onlyDetails
street space only | ||
| Aug 20, 2018 | Completed final sign-off Dec 2018 | 575 Pierce St | Kadima-Schoepp, Inc | unit #106 - relocate kitchen. frame laundry walls. frame bedroom closet & terrace door frame in bedroom closet. no change in unit envelope size maher na must comply with sffc 1103.7.6.1Details
unit #106 - relocate kitchen. frame laundry walls. frame bedroom closet & terrace door frame in bedroom closet. no change in unit envelope size maher na must comply with sffc 1103.7.6.1 | $65,000 |
| Jun 28, 2018 | Completed final sign-off Oct 2018 | 575 Pierce St | Kadima-Schoepp, Inc | unit 303 frame new bedroom, bedroom closet and frame new laundry closet, renovate kitchen cabinets, countertops.Details
unit 303 frame new bedroom, bedroom closet and frame new laundry closet, renovate kitchen cabinets, countertops. | $50,000 |
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 575 Pierce St | street space permitDetails
street space permit | ||
| Apr 9, 2018 | Completed final sign-off Jul 2018 | 575 Pierce St | Kadima-Schoepp, Inc | unit 305. reframe entry way , relocate extg kitceh and bedroom, relocate laundry closet in 575 pierce #305. n/a for maher comply with sffc section 1103.7.6.1 for fire alrm sound in sleeping areas.Details
unit 305. reframe entry way , relocate extg kitceh and bedroom, relocate laundry closet in 575 pierce #305. n/a for maher comply with sffc section 1103.7.6.1 for fire alrm sound in sleeping areas. | $50,000 |
| Aug 29, 2017 | Expired or cancelled cancelled Jan 2026 | 575 Pierce St | Theodore Design & Constr | add firescape & landingDetails
add firescape & landing | $6,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 575 Pierce St | Velox Construction | unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher naDetails
unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher na | $68,000 |
| Apr 28, 2017 | Completed final sign-off Aug 2017 | 575 Pierce St | Velox Construction | unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a.Details
unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a. | $52,000 |
| Mar 29, 2017 | Never finaled issued Mar 2017, no final | 575 Pierce St | street spaceDetails
street space | ||
| Mar 29, 2017 | Never finaled issued Mar 2017, no final | 575 Pierce St | street spaceDetails
street space | ||
| Feb 15, 2017 | Completed final sign-off Apr 2017 | 575 Pierce St | Make Ready Maintenance Inc | apt 503: rev to 201701036434: add non loading bearing wall to make new bedroom. n/a maherDetails
apt 503: rev to 201701036434: add non loading bearing wall to make new bedroom. n/a maher | |
| Jan 19, 2017 | Expired or cancelled cancelled Jan 2026 | 575 Pierce St | install (1) omni-directional antenna, (1) gps unit, and (1) equipment cabinet on penthouse wall. connect cabinet to (e) electrical panel. nextnave e-911. maher naDetails
install (1) omni-directional antenna, (1) gps unit, and (1) equipment cabinet on penthouse wall. connect cabinet to (e) electrical panel. nextnave e-911. maher na | $10,000 | |
| Jan 3, 2017 | Never finaled issued Jan 2017, no final | 575 Pierce St | Make Ready Maintenance Inc | apts 406/503: each unit: kitchen and bathroom remodel. same layout. no windows or load bearing walls moved, removed, infilled or altered.Details
apts 406/503: each unit: kitchen and bathroom remodel. same layout. no windows or load bearing walls moved, removed, infilled or altered. | $35,000 |
| Oct 21, 2016 | Completed final sign-off Jan 2017 | 575 Pierce St | Make Ready Maintenance Inc | unit #104: kitchen and bathroom remodel. no windows and no loading walls. n/a for maherDetails
unit #104: kitchen and bathroom remodel. no windows and no loading walls. n/a for maher | $28,000 |
| Feb 1, 2016 | Never finaled issued Feb 2016, no final | 575 Pierce St | street spaceDetails
street space | ||
| Jan 14, 2016 | Completed final sign-off Aug 2017 | 575 Pierce St | Saarman Construction,Ltd. | updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maherDetails
updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maher | |
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 575 Pierce St | street spaceDetails
street space | ||
| Aug 12, 2015 | Completed final sign-off Oct 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit 603: kitchen & bathroom renovation. no change in walls and opening layout. h/e lighting in bathroom or controlel by manual on-sensor & h/e main light; kitchen lighitng min 50% wattage h/e. no windows or structural changes.Details
unit 603: kitchen & bathroom renovation. no change in walls and opening layout. h/e lighting in bathroom or controlel by manual on-sensor & h/e main light; kitchen lighitng min 50% wattage h/e. no windows or structural changes. | $27,000 |
| May 27, 2015 | Expired or cancelled cancelled Jan 2017 | 575 Pierce St | Make Ready Maintenance Inc | #104 - renovation of existing kitchen & bath. removal of exisitng wall, construction new walls.Details
#104 - renovation of existing kitchen & bath. removal of exisitng wall, construction new walls. | $27,000 |
| May 27, 2015 | Completed final sign-off Aug 2017 | 575 Pierce St | Saarman Construction,Ltd. | voluntary seismic strengthening of concrete and steel frames structure to correct vertical offset discontinuity and strengthing of front wall with new concrete shearwalls where feasible. n/a for maher ordinance extended.Details
voluntary seismic strengthening of concrete and steel frames structure to correct vertical offset discontinuity and strengthing of front wall with new concrete shearwalls where feasible. n/a for maher ordinance extended. | $110,000 |
| May 26, 2015 | Never finaled issued May 2015, no final | 575 Pierce St | street spaceDetails
street space | ||
| May 13, 2015 | Completed final sign-off Aug 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit # 404: kitchen and bath remodel # 404. no wall removal. all new lights shall be high efficacy. n/a maher ord. #155-13Details
unit # 404: kitchen and bath remodel # 404. no wall removal. all new lights shall be high efficacy. n/a maher ord. #155-13 | $27,000 |
| Mar 23, 2015 | Completed final sign-off May 2015 | 575 Pierce St | Make Ready Maintenance Inc | kitchen and bathroom remodel in unit 203.Details
kitchen and bathroom remodel in unit 203. | $40,000 |
| Jan 22, 2015 | Completed final sign-off Jun 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit #502 - kitchen & bathroom remodel. n/a maher ordinanceDetails
unit #502 - kitchen & bathroom remodel. n/a maher ordinance | $27,000 |
| Jan 22, 2015 | Completed final sign-off Oct 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit #506 - kitchen & bathroom remodel. n/a maher ordinanceDetails
unit #506 - kitchen & bathroom remodel. n/a maher ordinance | $27,000 |
| Jan 22, 2015 | Completed final sign-off Oct 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit #601 - kitchen & bathroom remodel. add one bathroom. n/a maher ordinanceDetails
unit #601 - kitchen & bathroom remodel. add one bathroom. n/a maher ordinance | $36,000 |
| Jan 22, 2015 | Completed final sign-off Oct 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit #602 - kitchen & bathroom remodel. add one bathroom. n/a maher ordinanceDetails
unit #602 - kitchen & bathroom remodel. add one bathroom. n/a maher ordinance | $36,000 |
| Jan 22, 2015 | Completed final sign-off May 2015 | 575 Pierce St | Make Ready Maintenance Inc | unit #101 -kitchen & bathroom remodel. n/a maher ordinanceDetails
unit #101 -kitchen & bathroom remodel. n/a maher ordinance | $27,000 |
| Dec 26, 2013 | Never finaled issued Dec 2013, no final | 575 Pierce St | streetspaceDetails
streetspace | ||
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 575 Pierce St | A R C Dba/ Architectural Coatings | apply new urethane rubber roof deck waterproofing system to waterproof existing roof deck, flat roof.Details
apply new urethane rubber roof deck waterproofing system to waterproof existing roof deck, flat roof. | $9,000 |
| Jan 30, 2012 | Expired or cancelled cancelled Jan 2026 | 575 Pierce St | remove (e) deck boards ar roof deck, apply urethane rubber roof waterproofing system & replace roof deckingDetails
remove (e) deck boards ar roof deck, apply urethane rubber roof waterproofing system & replace roof decking | $9,000 | |
| Sep 27, 2011 | Never finaled issued Sep 2011, no final | 575 Pierce St | streetspaceDetails
streetspace | ||
| Sep 24, 2009 | Never finaled issued Sep 2009, no final | 575 Pierce St | Fidelity Roof Company | reroofing.Details
reroofing. | $72,400 |
| May 5, 2004 | Never finaled issued May 2004, no final | 575 Pierce St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Make Ready Maintenance Inc (12), Block 12 Construction (8), Kadima-Schoepp, Inc (3), Kwong Associates (3), Doherty Restoration, Inc. (2), Saarman Construction,Ltd. (2), Silva's Fire Protection Llc (2), Velox Construction (2), A R C Dba/ Architectural Coatings, Crime Watch Security Sys Llc, Fidelity Roof Company, Theodore Design & Constr
- Architects
- Terryl Lofrano (9), Terryl Lofrano (3)
- Engineers
- Sedco, Smith Engineering Inc.
- Authorized agent-otherss
- Chris Keohane