Block 6515, lot 013
390 Bartlett St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 9,186 sq ft
- Lot
- 4,356 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2024 | Completed final sign-off Nov 2024 | 390 Bartlett St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $31,600 |
| May 16, 2024 | Completed final sign-off Oct 2025 | 390 Bartlett St | Cpb Construction Corporation | unit 7: remodel kitchen/ install new cabinets, sink, plumbing, countertop, appliances, disposal/ microwave, gas stove- remodel bathroom: new tile, shower fixture, tub, floor, sink, toilet, shower tiles, fam. upgrade electrical.Details
unit 7: remodel kitchen/ install new cabinets, sink, plumbing, countertop, appliances, disposal/ microwave, gas stove- remodel bathroom: new tile, shower fixture, tub, floor, sink, toilet, shower tiles, fam. upgrade electrical. | $25,000 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 390 Bartlett St | Cpb Construction Corporation | rev to pa# 201908027671; beam and bearing wall removal n/a maherDetails
rev to pa# 201908027671; beam and bearing wall removal n/a maher | $3,500 |
| Dec 5, 2019 | Never finaled issued Jan 2020, no final | 390 Bartlett St | Cpb Construction Corporation | unit #16 (4th fl); no changes to building exterior relocate kitchen, turn (e) kitchen into (n) bedroom,remodel (e) bath, replace fixtures and finishes add (n) radiator at (n) bedroomDetails
unit #16 (4th fl); no changes to building exterior relocate kitchen, turn (e) kitchen into (n) bedroom,remodel (e) bath, replace fixtures and finishes add (n) radiator at (n) bedroom | $45,000 |
| Aug 2, 2019 | Never finaled issued Sep 2019, no final | 390 Bartlett St | Cpb Construction Corporation | work only on unit # 3: no changes to building exterior. relocate kitchen, turn existing kitchen into new bedroom, remodel existing bathroom. replace fixtures, finishes, add new hydronic radiator at new bedroom.Details
work only on unit # 3: no changes to building exterior. relocate kitchen, turn existing kitchen into new bedroom, remodel existing bathroom. replace fixtures, finishes, add new hydronic radiator at new bedroom. | $20,000 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 390 Bartlett St | Doherty Restoration, Inc. | revision to to pa # 201609147646. as-built design revisions. maher n/aDetails
revision to to pa # 201609147646. as-built design revisions. maher n/a | $5,000 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 390 Bartlett St | street spaceDetails
street space | ||
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 390 Bartlett St | street spaceDetails
street space | ||
| May 19, 2017 | Never finaled issued May 2017, no final | 390 Bartlett St | Make Ready Maintenance Inc | revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartmentDetails
revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartment | $3,000 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 390 Bartlett St | Velox Construction, Make Ready Maintenance Inc | unit #5: kitchen and bathroom remodel. no windows. no load bearing walls.Details
unit #5: kitchen and bathroom remodel. no windows. no load bearing walls. | $27,000 |
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 390 Bartlett St | Make Ready Maintenance Inc | unit #4: kitchen and bathroom remodel. no windows and no loading walls. n/a for maherDetails
unit #4: kitchen and bathroom remodel. no windows and no loading walls. n/a for maher | $27,000 |
| Sep 14, 2016 | Completed final sign-off Sep 2018 | 390 Bartlett St | Doherty Restoration, Inc. | mandatory seismic streghtening per ord 66-13 for soft story per full ubc design base shearDetails
mandatory seismic streghtening per ord 66-13 for soft story per full ubc design base shear | $90,000 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 390 Bartlett St | Make Ready Maintenance Inc | unit #8: kitchen and bathroom remodel, new lighting and plugsDetails
unit #8: kitchen and bathroom remodel, new lighting and plugs | $18,276 |
| Oct 3, 2013 | Completed final sign-off Oct 2013 | 390 Bartlett St | Sequoia Construction Services Inc | voluntary seismic strengthening to address potential falling of bricks (veneer) from bottom to 1st belly band. no change to exteriorDetails
voluntary seismic strengthening to address potential falling of bricks (veneer) from bottom to 1st belly band. no change to exterior | $5,000 |
| Sep 3, 2013 | Never finaled issued Sep 2013, no final | 390 Bartlett St | unit 9: kitchen & bathroom remodel, new lighting & plugs, high efficacy lights.Details
unit 9: kitchen & bathroom remodel, new lighting & plugs, high efficacy lights. | $18,276 | |
| Oct 20, 2009 | Never finaled issued Oct 2009, no final | 390 Bartlett St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Jan 8, 2007 | Expired or cancelled expired Aug 2009 | 390 Bartlett St | repair rear stairs, stringers between 1st & 2nd floors. replace a few steps. less than 50% repair. to comply with nov# 200679868. same for same.Details
repair rear stairs, stringers between 1st & 2nd floors. replace a few steps. less than 50% repair. to comply with nov# 200679868. same for same. | $1,200 | |
| Dec 19, 2006 | Expired or cancelled expired Aug 2009 | 390 Bartlett St | Ramirez Roofing Corporation | reroofingDetails
reroofing | $17,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cpb Construction Corporation (4), Make Ready Maintenance Inc (4), Doherty Restoration, Inc. (2), Crime Watch Security Sys Llc, Ramirez Roofing Corporation, Sequoia Construction Services Inc, Velox Construction
- Architects
- Jorge Carbonell (2)
- Engineers
- Michael Hom, Smith Engineering Inc.
- Authorized agent-otherss
- Smith Engineering Inc.
- Designers
- Calin C Smith
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.