Jorge Carbonell
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Jorge Carbonell Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Sep 2026
267 permits since 2000 (architect on 251 permits, engineer on 7 permits, authorized agent-others on 6 permits, designer on 5 permits): 167 completed, 32 in progress, 28 never finaled, 40 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 267.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2026 | In progress filed Sep 2026, not yet issued | 4150 Cesar Chavez St | correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26Details
correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26 | $25,000 | |
| Aug 27, 2026 | In progress issued Aug 2026 | 4150 Cesar Chavez St | Nk Construction & Real Estate Developmen | at unit #6 on the 4th floor: 1)enlarge opening at kitchen; 2) new washer and dryer in kitchen; 3)new hvac heat pump for unit #6Details
at unit #6 on the 4th floor: 1)enlarge opening at kitchen; 2) new washer and dryer in kitchen; 3)new hvac heat pump for unit #6 | $15,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 77 Ventura Av | Darc Ventures Inc Dba Spl Construction S | 2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room.Details
2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room. | $60,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 2215 California St | Ryan Construction | 3/fl- create (n) opening between (e) primary bedroom and (e) officeDetails
3/fl- create (n) opening between (e) primary bedroom and (e) office | $15,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 1819 08th Av | Precision General Contruction | 2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm..Details
2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm.. | $100,000 |
| May 27, 2026 | In progress issued Jun 2026 | 399 10th Av | Rcp Construction Llc | at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant.Details
at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant. | $190,000 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 426 Valley St | Nk Construction & Real Estate Developmen | convert part of garage & storage into conditioned space w/ new bedroom/bath/laundry & media rm; horizontal addition @ rear yard & side setback; new interior stairs; excavate grade;new heat pump & water heater;new rear deck;kitchen remodel;replace stairs @front setback;new half-bath;vertical additionDetails
convert part of garage & storage into conditioned space w/ new bedroom/bath/laundry & media rm; horizontal addition @ rear yard & side setback; new interior stairs; excavate grade;new heat pump & water heater;new rear deck;kitchen remodel;replace stairs @front setback;new half-bath;vertical addition | $400,000 |
| May 4, 2026 | In progress issued May 2026 | 880 Pacheco St | Cej Construction Llc | revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter.Details
revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter. | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 201 Onondaga Av | mandatory seismic retrofit per ab-107: application of engineering criteria in sfbc chapter 4:d.Details
mandatory seismic retrofit per ab-107: application of engineering criteria in sfbc chapter 4:d. | $25,000 | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 201 Onondaga Av | per ca govt code 66323: turn part of (e) garage into 1 new accessory dwelling unit.Details
per ca govt code 66323: turn part of (e) garage into 1 new accessory dwelling unit. | $125,000 | |
| Feb 19, 2026 | In progress issued Aug 2026 | 354 Arlington St | Cardea Bldg Dba Dimension Design Group | work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights.Details
work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights. | $40,000 |
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 249 Peru Av | Steadfast Bay Construction | remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors.Details
remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. | $250,000 |
| Nov 14, 2025 | In progress issued Mar 2026 | 727 Rockdale Dr | De Jong Construction | revision to pa# 202212289235: at 1/f- expand proposed bath, convert proposed half bath to full bath, (n) exterior stairs in side yard, modify proposed interior stairs, relocate exterior door at side yard. at 2/f: new doors from living room to bedroom, replace (e) fireplace and chimney with (n)...Details
revision to pa# 202212289235: at 1/f- expand proposed bath, convert proposed half bath to full bath, (n) exterior stairs in side yard, modify proposed interior stairs, relocate exterior door at side yard. at 2/f: new doors from living room to bedroom, replace (e) fireplace and chimney with (n)... | $10,000 |
| Nov 14, 2025 | Completed final sign-off May 2026 | 1570 Sanchez St | Citidev Inc. | revision to 202508042195. replacement of ext stair at front to be in kind replacement< non conforming riser ht to remain at rear yard, modify new fence framing in lieu of guardrailDetails
revision to 202508042195. replacement of ext stair at front to be in kind replacement< non conforming riser ht to remain at rear yard, modify new fence framing in lieu of guardrail | |
| Sep 22, 2025 | In progress issued Sep 2025 | 880 Pacheco St | Cej Construction Llc | revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drains to new patio concrete slab. new drainage detail for landscape retaining walls.Details
revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drains to new patio concrete slab. new drainage detail for landscape retaining walls. | |
| Sep 5, 2025 | In progress issued Mar 2026 | 750 Presidio Av | Precision General Contruction | per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room.Details
per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room. | $350,000 |
| Aug 11, 2025 | In progress issued Mar 2026 | 457 Duncan St | Cardea Bldg Dba Dimension Design Group | 1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate grade @ rear yard. 2nd flr-demolish rear portion of bldg, deck & exterior stairs; horizontal 2025072512Details
1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate grade @ rear yard. 2nd flr-demolish rear portion of bldg, deck & exterior stairs; horizontal 2025072512 | $390,000 |
| Aug 4, 2025 | Completed final sign-off May 2026 | 1570 Sanchez St | Citidev Inc. | replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening.Details
replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening. | $25,000 |
| Aug 4, 2025 | Completed final sign-off Sep 2026 | 1401 Waller St | Cpb Construction Corporation | apartment #5, 3rd floor - relocate kitchen to living room; previous kitchen to become a bedroomDetails
apartment #5, 3rd floor - relocate kitchen to living room; previous kitchen to become a bedroom | $30,000 |
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 3545 Judah St | Sunset Builders Llc. | enlarge window opening and install new window under e header. all other work under 202502120169.Details
enlarge window opening and install new window under e header. all other work under 202502120169. | |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 466 Liberty St | Lyne Construction | at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long)Details
at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long) | $10,000 |
| May 29, 2025 | In progress issued May 2025 | 880 Pacheco St | Cej Construction Llc | revision to permit 20241003226 to include the removal of the existing foundation with a new, pier supporated foundation to accommodate a slighe increase in the grade at the rear yard, remove and replace associated exterior wood stairs.Details
revision to permit 20241003226 to include the removal of the existing foundation with a new, pier supporated foundation to accommodate a slighe increase in the grade at the rear yard, remove and replace associated exterior wood stairs. | $15,000 |
| May 21, 2025 | In progress issued May 2025 | 138 Parker Av | Cej Construction Llc | revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylightDetails
revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from scope & relocate 1 skylight | |
| May 17, 2025 | In progress issued Aug 2025 | 2040 Gough St | demo and replace rear portion of building (15ft x 8ft; 3-stories); remove rear int stairs; remodel kitchen nd 1/f toilet room add 2 new baths in 3/f,remodel (e) bath; add 2 new baths on 4/f; add laudry. new windows rear elev.Details
demo and replace rear portion of building (15ft x 8ft; 3-stories); remove rear int stairs; remodel kitchen nd 1/f toilet room add 2 new baths in 3/f,remodel (e) bath; add 2 new baths on 4/f; add laudry. new windows rear elev. | $25,000 | |
| May 14, 2025 | Expired or cancelled expired Oct 2026 | 508 Cole St | Gorman Construction | replace "in-kind" non-conforming exterior stairs at front facade.Details
replace "in-kind" non-conforming exterior stairs at front facade. | $20,000 |
| Feb 12, 2025 | Completed final sign-off Dec 2025 | 3545 Judah St | Sunset Builders Llc. | work only in unit 3545 judah at 2nd fl. new window at rear building wall, remove wall between kitchen and dining room, kitchen remodelDetails
work only in unit 3545 judah at 2nd fl. new window at rear building wall, remove wall between kitchen and dining room, kitchen remodel | $20,000 |
| Jan 28, 2025 | Completed final sign-off Dec 2025 | 2159 27th Av | Sunset Builders Llc. | to comply with nov 202428924: on 1/f: per ca govt code 65852.2: turn unpermitted dwelling unit into a new adu.Details
to comply with nov 202428924: on 1/f: per ca govt code 65852.2: turn unpermitted dwelling unit into a new adu. | $35,000 |
| Jan 21, 2025 | Completed final sign-off Dec 2025 | 750 Presidio Av | Precision General Contruction | unit 202 on 3/f: relocate kitchen to living room. previous kitchen to become office (not a sleeping rm)Details
unit 202 on 3/f: relocate kitchen to living room. previous kitchen to become office (not a sleeping rm) | $40,000 |
| Dec 23, 2024 | Completed final sign-off Oct 2025 | 2022 Polk St | Nimble Construction Services Llc | (n) tenant improvement for new exercise studio in vacant space (1st time tenant cfc required)Details
(n) tenant improvement for new exercise studio in vacant space (1st time tenant cfc required) | $20,000 |
| Dec 23, 2024 | In progress issued Feb 2025 | 138 Parker Av | Cej Construction Llc | 3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property lineDetails
3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property line | $70,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2026 | 565 Jersey St | Aaron Gordon Construction Inc | at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line.Details
at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line. | $72,000 |
| Nov 19, 2024 | Completed final sign-off Sep 2025 | 750 Presidio Av | Precision General Contruction | unit #305: 4th fl- relocate kitchen to walk in closet; previous kitchen to become bedroomDetails
unit #305: 4th fl- relocate kitchen to walk in closet; previous kitchen to become bedroom | $18,000 |
| Nov 4, 2024 | In progress issued Jun 2025 | 3225 Laguna St | Cpb Construction Corporation | unit 2- convert (e) kitchen into (n) bedroom and relocate (e) kitchen to the living roomDetails
unit 2- convert (e) kitchen into (n) bedroom and relocate (e) kitchen to the living room | $30,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 880 Pacheco St | Cej Construction Llc | remove/replace rear-yard concrete retaining wall with new pier- supported concrete planter and pier-supported concrete grade beam supporting a wood privacy fence. no interior workDetails
remove/replace rear-yard concrete retaining wall with new pier- supported concrete planter and pier-supported concrete grade beam supporting a wood privacy fence. no interior work | $30,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 228 Diamond St | Cpb Construction Corporation | relocate pg&e electrical meters & alter laundry roomDetails
relocate pg&e electrical meters & alter laundry room | $5,000 |
| Jul 30, 2024 | In progress issued Aug 2025 | 3968 Sacramento St | Futurecorp Development And Construction | 3970 sacramento- (n) deck at rear 3968 sacramento- remove ext stairs to rear yard. for both units: remodel kitchens & bath. add (n) bath. relocate laundry. replace in kind sunrooms at northeast corner. remove bearing wall btwn living & dining room. (n) windows & sliding doors at rear yard elevationDetails
3970 sacramento- (n) deck at rear 3968 sacramento- remove ext stairs to rear yard. for both units: remodel kitchens & bath. add (n) bath. relocate laundry. replace in kind sunrooms at northeast corner. remove bearing wall btwn living & dining room. (n) windows & sliding doors at rear yard elevation | $190,000 |
| Jul 8, 2024 | In progress issued Oct 2024 | 3015 Van Ness Av | Cpb Construction Corporation | per ordinance #43-14, legalize dwelling unit installed without a permit on ground floor: studio unit with a bathroom and a kitchen.Details
per ordinance #43-14, legalize dwelling unit installed without a permit on ground floor: studio unit with a bathroom and a kitchen. | $10,000 |
| Apr 25, 2024 | In progress issued Jul 2024 | 1473 Underwood Av | 1)correct nov complaint #202312994 for work without permits. removed siding installed plywood sheathing, new wood framing without permits. 2)install new overhead garage door, swing door, windows. 3) new toilet room & nw water heater. 4)foundations+slab thru-out replaced without permit.Details
1)correct nov complaint #202312994 for work without permits. removed siding installed plywood sheathing, new wood framing without permits. 2)install new overhead garage door, swing door, windows. 3) new toilet room & nw water heater. 4)foundations+slab thru-out replaced without permit. | $20,000 | |
| Mar 20, 2024 | Expired or cancelled cancelled Aug 2026 | 1590 Pacific Av | Doherty Restoration, Inc. | re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area.Details
re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area. | $240,000 |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 1710 36th Av | Y W Builders Inc. | remodel kitchen: (n) appliances and cabinets. remodel bath at second floor: (n) fixtures locations. widen openings between living room and dining room. remove fireplace at living room. replace skylight at kitchen. restore landscaping and permeable surfaces within the front setback per google photo.Details
remodel kitchen: (n) appliances and cabinets. remodel bath at second floor: (n) fixtures locations. widen openings between living room and dining room. remove fireplace at living room. replace skylight at kitchen. restore landscaping and permeable surfaces within the front setback per google photo. | $70,000 |
| Nov 16, 2023 | Completed final sign-off Aug 2024 | 876 Castro St | Citidev Inc. | revision to approved pa 2023-0810-4121. at garage building. new architectural projection (canopy) above exterior entry door @ sidewalk; widen previously approved canopy above elevator door. all work @ common area garageDetails
revision to approved pa 2023-0810-4121. at garage building. new architectural projection (canopy) above exterior entry door @ sidewalk; widen previously approved canopy above elevator door. all work @ common area garage | $5,000 |
| Nov 16, 2023 | Completed final sign-off Jun 2024 | 122 Tucker Av | Ahumada General Contractor | at rear yard, new deck & stairs.Details
at rear yard, new deck & stairs. | $15,000 |
| Nov 9, 2023 | Completed final sign-off Aug 2024 | 1303 Cortland Av | Lyne Construction | at rear yard, remove (e) deck & stairs and build new deck and stairs.Details
at rear yard, remove (e) deck & stairs and build new deck and stairs. | $15,000 |
| Nov 7, 2023 | In progress issued Nov 2023 | 2139 Pine St | Vanguard Construction Services | revision to 202310279640. 1st flr: relocate laundry in garage, relocate bath in storage. 2nd flr: turn closet into (n) bath. 3rd flr: turn closet into new powder room. 4th flr: remove wall between kitchen+dining rm and relocate ktichen. turn closet into new bath. turn closet into new laundry.turnDetails
revision to 202310279640. 1st flr: relocate laundry in garage, relocate bath in storage. 2nd flr: turn closet into (n) bath. 3rd flr: turn closet into new powder room. 4th flr: remove wall between kitchen+dining rm and relocate ktichen. turn closet into new bath. turn closet into new laundry.turn | $75,000 |
| Oct 31, 2023 | Completed final sign-off Mar 2024 | 1224 Grant Av | at commercial space at 1st fl. to comply with abe. replace door hardware. repair (e) power door operator. add (n) doorbell. abe 201912270443.Details
at commercial space at 1st fl. to comply with abe. replace door hardware. repair (e) power door operator. add (n) doorbell. abe 201912270443. | $2,000 | |
| Oct 27, 2023 | In progress issued Nov 2023 | 2139 Pine St | Vanguard Construction Services | repair fire + water damage throughout as follows: 1) remove chimneys + flues thru-out; 2)new 5/8" gyp bd @ all interior walls, @ 1st flr; 3) replace furnaces + water heaters w/ new combo boiler; 4) @ storage, remodel bath inkind,typ @ 2nd flr, 3rd, 4th; 5) remodel 3-kithcens + 3-baths in kind;...Details
repair fire + water damage throughout as follows: 1) remove chimneys + flues thru-out; 2)new 5/8" gyp bd @ all interior walls, @ 1st flr; 3) replace furnaces + water heaters w/ new combo boiler; 4) @ storage, remodel bath inkind,typ @ 2nd flr, 3rd, 4th; 5) remodel 3-kithcens + 3-baths in kind;... | $300,000 |
| Oct 26, 2023 | In progress issued Apr 2024 | 126 Cole St | Sunset Builders Llc. | alter site to 202105240849: 1/f turn (n) family rm into (n) bedroom,(n) bar sink in media rm. at 2/f & 3/f, remove horizontal addition from scope. at 4/f remove (n) roof terrace from scope. at roof remove 1 (n) dormer from scope, add (n) roof parapet 30" high along south prop line. change windowsDetails
alter site to 202105240849: 1/f turn (n) family rm into (n) bedroom,(n) bar sink in media rm. at 2/f & 3/f, remove horizontal addition from scope. at 4/f remove (n) roof terrace from scope. at roof remove 1 (n) dormer from scope, add (n) roof parapet 30" high along south prop line. change windows | |
| Oct 26, 2023 | Completed final sign-off Feb 2024 | 1129 Balboa St | C N A Construction, A P Alviz Construction Co. | revision to no-plan pa# 202305177960. at exterior stair in front setback, replace in-kind roof and walls above landing.Details
revision to no-plan pa# 202305177960. at exterior stair in front setback, replace in-kind roof and walls above landing. | $10,000 |
| Aug 30, 2023 | Completed final sign-off Aug 2024 | 16 Entrada Ct | Gil Construction & Assoc Inc. | @ basement turn powder rm into full bathrm; (n) walls to seperate storage rms and garage; replacement (e) door & windows; (n) posts and beam at garage; at 1st fl turn closet intp powder rm; remodel bathroom. (n) window at bathrm; (n) skylight on flat roof. new basement bathrm. window to be alum.Details
@ basement turn powder rm into full bathrm; (n) walls to seperate storage rms and garage; replacement (e) door & windows; (n) posts and beam at garage; at 1st fl turn closet intp powder rm; remodel bathroom. (n) window at bathrm; (n) skylight on flat roof. new basement bathrm. window to be alum. | $100,000 |
| Aug 24, 2023 | Completed final sign-off Jun 2024 | 1845 08th Av | Ryan Construction | mandatory seismic retrofit to comply with 2016 sfebc chapter 4d & ab-107.Details
mandatory seismic retrofit to comply with 2016 sfebc chapter 4d & ab-107. | $30,000 |
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr.Details
front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr. | $60,000 |
| Aug 10, 2023 | Completed final sign-off Aug 2024 | 876 Castro St | Citidev Inc. | garage building: replace ext entry gate w/new aluminium/glass door, interior doors in-kind, new architectural projection (canopy) above ext elevator door opening, remove (e) decotrative canopy in roof cornice above entryDetails
garage building: replace ext entry gate w/new aluminium/glass door, interior doors in-kind, new architectural projection (canopy) above ext elevator door opening, remove (e) decotrative canopy in roof cornice above entry | $7,000 |
| Jun 2, 2023 | Completed final sign-off May 2026 | 3858 Jackson St | Ashbury Gen Constructing & Eng | new boiler at new location with combination water heater & space heater remove radiators and install new underfloor radiant heating throuought conditoned space, remove brick flue at all fl. remodel powder rm t 2nd fl. remove bath at 3rd fl. at 4th fl. turn closet into laundry, remodel bath at 4th/fDetails
new boiler at new location with combination water heater & space heater remove radiators and install new underfloor radiant heating throuought conditoned space, remove brick flue at all fl. remodel powder rm t 2nd fl. remove bath at 3rd fl. at 4th fl. turn closet into laundry, remodel bath at 4th/f | $45,000 |
| May 22, 2023 | Completed final sign-off Mar 2025 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boilerDetails
rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boiler | $100,000 |
| May 22, 2023 | Completed final sign-off Sep 2026 | 3858 Jackson St | Ashbury Gen Constructing & Eng | 1)1/f -convert storage & parking into conditioned space,family room, bath, kitchenette; 2)east p|l-infill lightwell at 1/f & 2/f, 3)n interior stairs from 1st to 2nd flr.Details
1)1/f -convert storage & parking into conditioned space,family room, bath, kitchenette; 2)east p|l-infill lightwell at 1/f & 2/f, 3)n interior stairs from 1st to 2nd flr. | $125,000 |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | @ front building (interior), install a new direct-vent gas fireplace in the 2nd floor ; living roomDetails
@ front building (interior), install a new direct-vent gas fireplace in the 2nd floor ; living room | $10,000 |
| Apr 25, 2023 | Completed final sign-off Sep 2023 | 4319 21st St | Jakcon, Inc | revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet.Details
revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet. | $15,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic.Details
convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic. | $80,000 |
| Dec 28, 2022 | In progress issued Aug 2025 | 727 Rockdale Dr | De Jong Construction | remodel of 1st flr: convert storage & parking into n conditioned space w/ 2 bedrms, 1 bath, 1 powder rm, laundry & den, relocate interior stairs, n garage door, windows & ext. dorrs, relocate water heater & furnace. 2nd flr: remove wall btw kitchen & living rm, remodel kitchen & bathDetails
remodel of 1st flr: convert storage & parking into n conditioned space w/ 2 bedrms, 1 bath, 1 powder rm, laundry & den, relocate interior stairs, n garage door, windows & ext. dorrs, relocate water heater & furnace. 2nd flr: remove wall btw kitchen & living rm, remodel kitchen & bath | $140,000 |
| Dec 13, 2022 | In progress issued Nov 2023 | 4 Persia Av | Lyne Construction | install door bell, install door kick plate, replace extg handle to be ada compliant. add bevelling to extg scope at elevation. application attached to abe 201912109593.Details
install door bell, install door kick plate, replace extg handle to be ada compliant. add bevelling to extg scope at elevation. application attached to abe 201912109593. | $200 |
| Nov 30, 2022 | Completed final sign-off Apr 2023 | 523 Green St | Sunset Builders Llc. | to comply with accessible business entrance program per ordinance 51-16. abe #201904045652. 1/f, technical infeasibility request. no work to be performed.Details
to comply with accessible business entrance program per ordinance 51-16. abe #201904045652. 1/f, technical infeasibility request. no work to be performed. | |
| Nov 28, 2022 | Expired or cancelled withdrawn Aug 2025 | 281 Castro St | legalize dwelling unit(281 castro apt b)per ordinance 43-14.installed without a permit on ground floor,a studio unit with a bath and a kitchen.Details
legalize dwelling unit(281 castro apt b)per ordinance 43-14.installed without a permit on ground floor,a studio unit with a bath and a kitchen. | $50,000 | |
| Nov 22, 2022 | In progress issued Mar 2025 | 4319 21st St | Jakcon, Inc | at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard.Details
at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard. | $75,000 |
| Oct 11, 2022 | Completed final sign-off Sep 2023 | 4319 21st St | Jakcon, Inc | 3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade.Details
3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade. | $40,000 |
| Aug 31, 2022 | Completed final sign-off Apr 2024 | 605 Mississippi St | Traube Construction Company | at 1st floor, new horizontal addition in rear yard with 2 new bedrooms, new roof at addition to be a roof deck.Details
at 1st floor, new horizontal addition in rear yard with 2 new bedrooms, new roof at addition to be a roof deck. | $45,000 |
| Jun 22, 2022 | Completed final sign-off Nov 2022 | 887 Capp St | Moreno Construction | replace in kind (e) stairs and landings art rear yard. required egress.Details
replace in kind (e) stairs and landings art rear yard. required egress. | $25,000 |
| May 31, 2022 | Completed final sign-off Nov 2023 | 745 Victoria St | Level 8 Construction Inc | work at 2nd fl: remove wall between kitchen & dining. remodel kitchen. remodel powder room. replace 2 windows on sideyard.Details
work at 2nd fl: remove wall between kitchen & dining. remodel kitchen. remodel powder room. replace 2 windows on sideyard. | $35,000 |
| May 31, 2022 | Never finaled issued Jun 2022, no final | 815 Douglass St | C N A Construction | at 1st fl, replace (e) furnace & water heater with new radiant heating. (e) attic furnace for 2nd fl to remain. new laundry at 2nd fl.Details
at 1st fl, replace (e) furnace & water heater with new radiant heating. (e) attic furnace for 2nd fl to remain. new laundry at 2nd fl. | $20,000 |
| Jan 27, 2022 | Completed final sign-off Aug 2022 | 4167 17th St | American Builders | unit 4167 only: remodel kitchen. new cabinets, counters, appliances, relocate sink. remodel bath.Details
unit 4167 only: remodel kitchen. new cabinets, counters, appliances, relocate sink. remodel bath. | $20,000 |
| Jan 27, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | Citidev Inc. | 1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts.Details
1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts. | $55,000 |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 622 Spruce St | Michael De Jong Construction | at 2nd flr, add 2 new skylightsDetails
at 2nd flr, add 2 new skylights | $2,500 |
| Nov 9, 2021 | Expired or cancelled withdrawn Jan 2024 | 1554 Fulton St | revision to pa 2021-0819-6739 add 3 dormers @ roof; new mezzanine @ 3rd fl; den & bath; new interior spiral stairs to mezzanineDetails
revision to pa 2021-0819-6739 add 3 dormers @ roof; new mezzanine @ 3rd fl; den & bath; new interior spiral stairs to mezzanine | $40,000 | |
| Nov 9, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | Michael De Jong Construction | revision to app#202109037743; 1)excavation and nw retaining walls at crawl space at rear of bldg. (approx. 15 cu yd) 2)relocate proposed water heater to crawl space. 3)remove and replace floor framing at 2nd fl. sunroom (approx. 100 sq ft)Details
revision to app#202109037743; 1)excavation and nw retaining walls at crawl space at rear of bldg. (approx. 15 cu yd) 2)relocate proposed water heater to crawl space. 3)remove and replace floor framing at 2nd fl. sunroom (approx. 100 sq ft) | $5,000 |
| Sep 29, 2021 | Completed final sign-off Apr 2022 | 483 30th St | Precision General Contruction | revision to 2021 0201 3705: repair of front bay windows, framing, dryrot repair. reduce building for new lightwell @ 3rd flr. replace proposed furnace with new heat-pumpDetails
revision to 2021 0201 3705: repair of front bay windows, framing, dryrot repair. reduce building for new lightwell @ 3rd flr. replace proposed furnace with new heat-pump | |
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | Michael De Jong Construction | at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit.Details
at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit. | $70,000 |
| Aug 19, 2021 | Completed final sign-off Nov 2022 | 885 Duncan St | 1st fl - convert (e) garage & storage space into den, bedrm, bath & laundry; relocate garage door; replace interior stairs; 2nd fl - remodel kitchen & bath; replae and add (n) windows throughout; replace stucco @ front facade w/ipe; replace cementitious siding at rear w/hardie siding; (n) heat-pump;Details
1st fl - convert (e) garage & storage space into den, bedrm, bath & laundry; relocate garage door; replace interior stairs; 2nd fl - remodel kitchen & bath; replae and add (n) windows throughout; replace stucco @ front facade w/ipe; replace cementitious siding at rear w/hardie siding; (n) heat-pump; | $100,000 | |
| Aug 19, 2021 | Completed final sign-off Dec 2023 | 1554 Fulton St | Deep Elm Construction Llc | foundation replacement and excavate to increase ceiling height; estimated excavation 222 cubic yards. 2nd floor remodel, 3rd floor remodel. new hydronic heating. repair rear stair (lower portion); second means of egress. rogelio.baeza@sfgov.orgDetails
foundation replacement and excavate to increase ceiling height; estimated excavation 222 cubic yards. 2nd floor remodel, 3rd floor remodel. new hydronic heating. repair rear stair (lower portion); second means of egress. rogelio.baeza@sfgov.org | $145,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2023 | 140 Broadmoor Dr | Macrobuild Corporation | revision to app#202103166687. 1) relocate new powder room to different location in 1st floor. 2) remodel extg bath in 1st foor. 3)change framing plan to reflect extg framing conditions.Details
revision to app#202103166687. 1) relocate new powder room to different location in 1st floor. 2) remodel extg bath in 1st foor. 3)change framing plan to reflect extg framing conditions. | $15,000 |
| Jun 29, 2021 | Completed final sign-off Mar 2022 | 3933 Clay St | Plath & Company Inc | rev to pa 202103126481: replace w/h on 1/f, new heat pump; opening between pantry & kitchen on 2/f; 4/f: remove walls & add a new beam @ family room, remove walls and add beam @ office. 4th fl office relocate walls (n) framing under (e) roofDetails
rev to pa 202103126481: replace w/h on 1/f, new heat pump; opening between pantry & kitchen on 2/f; 4/f: remove walls & add a new beam @ family room, remove walls and add beam @ office. 4th fl office relocate walls (n) framing under (e) roof | $20,000 |
| Jun 8, 2021 | Completed final sign-off Dec 2021 | 109 Douglass St | Crestlake Inc | replacement in kind of egress stairs at sideyard.Details
replacement in kind of egress stairs at sideyard. | $15,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2023 | 140 Broadmoor Dr | Macrobuild Corporation | 1)at 1st floor: kitchen remodel. 2) at 1st floor: new half bath. 3)remove bay window at north side yard. 4)new window at side yard. 5)remodel 2nd level bathroom.Details
1)at 1st floor: kitchen remodel. 2) at 1st floor: new half bath. 3)remove bay window at north side yard. 4)new window at side yard. 5)remodel 2nd level bathroom. | $45,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 483 30th St | Precision General Contruction, Kirk G Construction | revision to pa 201808026244. reduce horizontal addition at 1st, 2nd, 3rd floors. eliminate one proposed bath at 3rd floor. eliminate excavation greater than 5 feet deep.Details
revision to pa 201808026244. reduce horizontal addition at 1st, 2nd, 3rd floors. eliminate one proposed bath at 3rd floor. eliminate excavation greater than 5 feet deep. | |
| Feb 1, 2021 | Expired or cancelled cancelled Jan 2026 | 1796 Union St | (unit 2806 octavia st) to comply with accessible business entry program at commercial space at 1st fl. provide auto door opener with vertical actuators. secure floormat. relocate address number from entry door kickplate.Details
(unit 2806 octavia st) to comply with accessible business entry program at commercial space at 1st fl. provide auto door opener with vertical actuators. secure floormat. relocate address number from entry door kickplate. | $4,000 | |
| Jan 8, 2021 | Never finaled filed Jan 2021, never issued | 2640 Greenwich St | adding six units, (4) units on lower level basement & (2) units on upper level basement per ordinance 162-16.Details
adding six units, (4) units on lower level basement & (2) units on upper level basement per ordinance 162-16. | $390,000 | |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 1446 32nd Av | Sunset Builders Llc. | 1/f: convert (e) garage & storage space into 2 bedrooms, 2 bathrooms,media rm & laundry. new interior stairs. 2/f: infill lightwell against adj blank wall; 2/f: remodel bathroom, replace & relocate furnace & water heater.Details
1/f: convert (e) garage & storage space into 2 bedrooms, 2 bathrooms,media rm & laundry. new interior stairs. 2/f: infill lightwell against adj blank wall; 2/f: remodel bathroom, replace & relocate furnace & water heater. | $90,000 |
| Nov 4, 2020 | Completed final sign-off Aug 2024 | 1044 Judah St | Macrobuild Corporation | mandatory soft-story retrofit to comply w/ 2016 sfebc chapter 4d and ab-107. new a.d.u's under separate permitDetails
mandatory soft-story retrofit to comply w/ 2016 sfebc chapter 4d and ab-107. new a.d.u's under separate permit | $35,000 |
| Oct 13, 2020 | Never finaled filed Oct 2020, never issued | 330 Chattanooga St | per s.f. ordinance #162-16: at 1st floor, convert two existing garage spaces into one new accessory dwelling unit (a.d.u.) with one bedroom and one bath.Details
per s.f. ordinance #162-16: at 1st floor, convert two existing garage spaces into one new accessory dwelling unit (a.d.u.) with one bedroom and one bath. | $70,000 | |
| Oct 8, 2020 | Never finaled issued Nov 2020, no final | 330 Clement St | Precision General Contruction | provide auto door opener w/ vertical actuators at commercial space to comly w/ accessible business entrance program per sf ordinance 51-16.Details
provide auto door opener w/ vertical actuators at commercial space to comly w/ accessible business entrance program per sf ordinance 51-16. | $4,000 |
| Oct 7, 2020 | Never finaled issued Dec 2020, no final | 3145 Geary Bl | Precision General Contruction | per sf ord. 51-16, to comply with accessible business entrance program. at commercial space at 1st flr. provide auto door opener with vertical actuators. provide n 10 inch high kick plateat entry door.Details
per sf ord. 51-16, to comply with accessible business entrance program. at commercial space at 1st flr. provide auto door opener with vertical actuators. provide n 10 inch high kick plateat entry door. | $4,000 |
| Oct 6, 2020 | Never finaled filed Oct 2020, never issued | 4105 California St | 1st floor: convert existing garage space & existing storage into one new accessory dwelling unit per ordinance 162-16 with two bedrooms.lightwell infill along east property line, less than 10 feet above grade.Details
1st floor: convert existing garage space & existing storage into one new accessory dwelling unit per ordinance 162-16 with two bedrooms.lightwell infill along east property line, less than 10 feet above grade. | $80,000 | |
| Sep 30, 2020 | Completed final sign-off Oct 2022 | 4105 California St | Schwed Construction | comply with notice of violation #2019-913311: mandatory soft story retrofit to comply with 2016 sfebc chapter 40 and 107Details
comply with notice of violation #2019-913311: mandatory soft story retrofit to comply with 2016 sfebc chapter 40 and 107 | $50,000 |
| Sep 21, 2020 | Expired or cancelled cancelled Nov 2024 | 806 Potrero Av | convert (e) storage space @ 1st fl into (n) habitable space w/2 (n) bathrs & 2 (n) bedrooms. replace (e) foundations. 2nd fl: relocate kitchen, remodel 1 bath, 2 bedrooms. replace doors & windows throughout.Details
convert (e) storage space @ 1st fl into (n) habitable space w/2 (n) bathrs & 2 (n) bedrooms. replace (e) foundations. 2nd fl: relocate kitchen, remodel 1 bath, 2 bedrooms. replace doors & windows throughout. | $200,000 | |
| Sep 19, 2020 | Completed final sign-off Nov 2021 | 3535 Fillmore St | Cpb Construction Corporation | apt 304: 4/f: relocate kitchen, convert (e) kitchen to (n) bedroom, rmeodel (e) bathroom, conver (e) closet to (n) bathroom, (n) laundry. no exterior work.Details
apt 304: 4/f: relocate kitchen, convert (e) kitchen to (n) bedroom, rmeodel (e) bathroom, conver (e) closet to (n) bathroom, (n) laundry. no exterior work. | $45,000 |
| Sep 16, 2020 | Never finaled filed Sep 2020, never issued | 156 Fairmount St | work only at front building. no work at rear building (single family dwelling)1- per s.f. ordinance #162-16: at 1st floor, convert existing storage space into one new accessory dwelling unit, 2- a.d.u. includes infill under habitable space, infill less than 10 ft. above grade.Details
work only at front building. no work at rear building (single family dwelling)1- per s.f. ordinance #162-16: at 1st floor, convert existing storage space into one new accessory dwelling unit, 2- a.d.u. includes infill under habitable space, infill less than 10 ft. above grade. | $80,000 | |
| Sep 15, 2020 | Completed final sign-off Feb 2021 | 3376 Clay St | Plath & Company Inc | 1st fl remodel - remodel media rm & closet, remove & add walls. 1st fl replace 2 (e) double hung windows with 1 new fixed window. not visible from street. 4th fl master bath remodel and laundry room.Details
1st fl remodel - remodel media rm & closet, remove & add walls. 1st fl replace 2 (e) double hung windows with 1 new fixed window. not visible from street. 4th fl master bath remodel and laundry room. | $15,000 |
| Aug 31, 2020 | Completed final sign-off Feb 2023 | 2294 Filbert St | Ryan Construction | mandatory soft story retrofit to comply w/ 2016 sfebc chapter 4d & ab-107. *only for residential portion of building.Details
mandatory soft story retrofit to comply w/ 2016 sfebc chapter 4d & ab-107. *only for residential portion of building. | $55,500 |
| Aug 31, 2020 | Completed final sign-off Feb 2024 | 3100 Steiner St | Ryan Construction | mandatory soft story retrofit to comply with 2016 sfebc chapter 4d & ab-107. *only for commerical portion of building.Details
mandatory soft story retrofit to comply with 2016 sfebc chapter 4d & ab-107. *only for commerical portion of building. | $19,500 |
| Jun 11, 2020 | Completed final sign-off Aug 2024 | 1044 Judah St | Macrobuild Corporation | at existing parking garages at first floor, replace parking with four new accessory dwelling units (adus) per ordinance no. 162-16. separate building permit for related seismic soft-story retrofit (ssr).Details
at existing parking garages at first floor, replace parking with four new accessory dwelling units (adus) per ordinance no. 162-16. separate building permit for related seismic soft-story retrofit (ssr). | $200,000 |
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 446 05th Av | administrative permit to correct housing record: 8 dwelling units on 446 5th ave, north building in the lot. no work to be performedDetails
administrative permit to correct housing record: 8 dwelling units on 446 5th ave, north building in the lot. no work to be performed | ||
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 450 05th Av | administrative permit to correct houseing record. 17 dwelling units 450 5th ave. the south building in the lot. no work to be performedDetails
administrative permit to correct houseing record. 17 dwelling units 450 5th ave. the south building in the lot. no work to be performed |