8 permits since 2000 (engineer on 8 permits): 3 completed, 4 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 679 Mcallister St | interior remodel & alteration. remodel (e) restroom 5'x10' at 1st fl. add new stairs to (e) mezzanine. reduce (e) mezzanine floor thickness. add storage room at mezzanine.Details
interior remodel & alteration. remodel (e) restroom 5'x10' at 1st fl. add new stairs to (e) mezzanine. reduce (e) mezzanine floor thickness. add storage room at mezzanine. | $68,000 | |
| Jun 27, 2025 | In progress issued Nov 2025 | 600 Ortega St | Barron Construction Inc. | revision to pa# 202304276609, ref planning 2024-007542prj, add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height.Details
revision to pa# 202304276609, ref planning 2024-007542prj, add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height. | $1,000 |
| Dec 23, 2024 | Completed final sign-off Oct 2025 | 2022 Polk St | Nimble Construction Services Llc | (n) tenant improvement for new exercise studio in vacant space (1st time tenant cfc required)Details
(n) tenant improvement for new exercise studio in vacant space (1st time tenant cfc required) | $20,000 |
| Oct 24, 2024 | In progress filed Oct 2024, not yet issued | 3271 Jackson St | work in common area - revision to pa 202406245135 and 202407116292 per inspector's required revised plans to reflect change in planter wall construction and increased number of footings and chanes to framing membersDetails
work in common area - revision to pa 202406245135 and 202407116292 per inspector's required revised plans to reflect change in planter wall construction and increased number of footings and chanes to framing members | ||
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 3525 Lawton St | Sf Town Builders Inc | new 3rd floor and small horizontal addition at 2nd floor.Details
new 3rd floor and small horizontal addition at 2nd floor. | $185,000 |
| May 23, 2023 | Completed final sign-off Sep 2023 | 411 Teresita Bl | Mcguinness Mccann Group | structural revision to 202208059991. no arch scope. clarifications of framing, connections, repair cracked post, add hucq at post to beam connections, add new post to existing post at crawl spaceDetails
structural revision to 202208059991. no arch scope. clarifications of framing, connections, repair cracked post, add hucq at post to beam connections, add new post to existing post at crawl space | $5,000 |
| Apr 27, 2023 | In progress issued Aug 2024 | 600 Ortega St | Barron Construction Inc. | erect a 3-story, type vb, single family dwelling.Details
erect a 3-story, type vb, single family dwelling. | $800,000 |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 1104 Treat Av | Jimenez Construction Sf Inc | remodel (e) office and add bathroomDetails
remodel (e) office and add bathroom | $50,000 |