Macrobuild Corporation
- Based in
- Hercules
- On San Francisco permits
- May 2016 to Jun 2023
- Last 24 months
- 0 permits filed
51 permits since 2000: 43 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Jul 2025 | 900 Bay St | rev to pa201902062233: revise previously approved cmu planter on larkin st s/w to composite wood. remove exterior planter at unit 14 on driveway across rear of property.Details
rev to pa201902062233: revise previously approved cmu planter on larkin st s/w to composite wood. remove exterior planter at unit 14 on driveway across rear of property. | |
| Oct 24, 2022 | Never finaled issued Oct 2022, no final | 295 Yerba Buena Av | renew permit#'s: 2017-0922-9352: 2017-1120-4444: and 2018-0216-1611- all work is completeDetails
renew permit#'s: 2017-0922-9352: 2017-1120-4444: and 2018-0216-1611- all work is complete | |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 3225 Gough St | rev to pa# 2021-0504-9730: reduction of scope of work. remove bathroom remodel from unit 3223 gough st.Details
rev to pa# 2021-0504-9730: reduction of scope of work. remove bathroom remodel from unit 3223 gough st. | |
| May 13, 2022 | Completed final sign-off Sep 2022 | 2059 Larkin St | kitchen change cabinets install new countertop update electrical for kitchen appliances new tile flooringDetails
kitchen change cabinets install new countertop update electrical for kitchen appliances new tile flooring | $15,000 |
| Nov 1, 2021 | Completed final sign-off Nov 2021 | 874 Pacific Av | repair of less than 50% of stiars of like kind materials no plan required.Details
repair of less than 50% of stiars of like kind materials no plan required. | $7,000 |
| Oct 27, 2021 | Completed final sign-off Dec 2022 | 1306 Montgomery St | replace 1 window at rearDetails
replace 1 window at rear | $5,000 |
| Sep 27, 2021 | Completed final sign-off Dec 2022 | 1306 Montgomery St | unit# 3: remove internal stairs. new kitchen install in unit 3. kitchen remodel in unit #5 restore original units location, square footages and total count at 5.Details
unit# 3: remove internal stairs. new kitchen install in unit 3. kitchen remodel in unit #5 restore original units location, square footages and total count at 5. | $25,000 |
| Sep 15, 2021 | Completed final sign-off Sep 2021 | 3240 Geary Bl | to obtain a final inspection for work approved under pa#200811196955. all work is complete.Details
to obtain a final inspection for work approved under pa#200811196955. all work is complete. | |
| Aug 19, 2021 | Completed final sign-off Dec 2024 | 3223 Gough St | revision to 202106102138. add 1 (n) window @ bathroom @ 3rd floor. add a closet @ sunroom @ 3rd floor.Details
revision to 202106102138. add 1 (n) window @ bathroom @ 3rd floor. add a closet @ sunroom @ 3rd floor. | $3,000 |
| Jul 30, 2021 | Completed final sign-off Feb 2022 | 35 Casa Wy | unit 301- remodel kitchen. install cabinets, update the kitchen plumbing and electrical. bathroom replace toilet, vanity mirror med cabinet. remodel in-kind. comply w/ cec 150.0 (k)3 & 150.0 (k)5.Details
unit 301- remodel kitchen. install cabinets, update the kitchen plumbing and electrical. bathroom replace toilet, vanity mirror med cabinet. remodel in-kind. comply w/ cec 150.0 (k)3 & 150.0 (k)5. | $20,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2023 | 140 Broadmoor Dr | revision to app#202103166687. 1) relocate new powder room to different location in 1st floor. 2) remodel extg bath in 1st foor. 3)change framing plan to reflect extg framing conditions.Details
revision to app#202103166687. 1) relocate new powder room to different location in 1st floor. 2) remodel extg bath in 1st foor. 3)change framing plan to reflect extg framing conditions. | $15,000 |
| Jul 12, 2021 | Completed final sign-off Aug 2021 | 2055 Larkin St | to comply with nov #202179775 dated 7/9/21. repair of dryrot of back stairs consists of few planks, riser, steps & stringer comprised of approx 25% of the repairs to be done of the entire stairway. repair in kind.Details
to comply with nov #202179775 dated 7/9/21. repair of dryrot of back stairs consists of few planks, riser, steps & stringer comprised of approx 25% of the repairs to be done of the entire stairway. repair in kind. | $8,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 3240 Geary Bl | change of use from retail sales to restaurant service alchohol. no work under this permit application.Details
change of use from retail sales to restaurant service alchohol. no work under this permit application. | |
| Jun 10, 2021 | Expired or cancelled expired Dec 2024 | 3223 Gough St | 2/f: remodel 1 bathroom, 1 powder room, merge the (e) dining room with sun room. 3/f: reomodel 1 bathroom & 1 bedroomDetails
2/f: remodel 1 bathroom, 1 powder room, merge the (e) dining room with sun room. 3/f: reomodel 1 bathroom & 1 bedroom | $38,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 334 Noe St | to comply with nov202176061: laundry room, update plumbing, install sink, washer/dryer. electrical gfci outlets, hot/cold water line.provide fresh air inlet cover on s/w.Details
to comply with nov202176061: laundry room, update plumbing, install sink, washer/dryer. electrical gfci outlets, hot/cold water line.provide fresh air inlet cover on s/w. | $7,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 3233 Broderick St | replace vanity in the bathroom. install exhaust vent, separate the common area lights & install new meter.Details
replace vanity in the bathroom. install exhaust vent, separate the common area lights & install new meter. | $6,000 |
| May 4, 2021 | Completed final sign-off Oct 2022 | 3223 Gough St | bathroom remodel in units #3223 # #3225. new shower pan, update electrical and plumbing, new vents, new toilets and vanityDetails
bathroom remodel in units #3223 # #3225. new shower pan, update electrical and plumbing, new vents, new toilets and vanity | $30,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2023 | 140 Broadmoor Dr | 1)at 1st floor: kitchen remodel. 2) at 1st floor: new half bath. 3)remove bay window at north side yard. 4)new window at side yard. 5)remodel 2nd level bathroom.Details
1)at 1st floor: kitchen remodel. 2) at 1st floor: new half bath. 3)remove bay window at north side yard. 4)new window at side yard. 5)remodel 2nd level bathroom. | $45,000 |
| Mar 2, 2021 | Completed final sign-off Dec 2021 | 1044 Judah St | unit 3 - replace kitchen cabinets; new sink & countertop; upgrade electrical for kitchen appliances; bathroom remodel keep bathtub & replae shower walls & plumbing fixtures; new washer & dryer (hook-up) (no moving wals)Details
unit 3 - replace kitchen cabinets; new sink & countertop; upgrade electrical for kitchen appliances; bathroom remodel keep bathtub & replae shower walls & plumbing fixtures; new washer & dryer (hook-up) (no moving wals) | $20,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2021 | 1825 Pine St | (unit #2) to comply with nov# 202171732. replaced kitchen cabinets in kind & shower walls in the bathroom.Details
(unit #2) to comply with nov# 202171732. replaced kitchen cabinets in kind & shower walls in the bathroom. | $10,000 |
| Dec 28, 2020 | Completed final sign-off Nov 2021 | 1108 Pine St | 3 units: insall (n) kitchen cabinets in all units, update electrical & plmbing. new panel box; new common meter for common areas; homerun of electrical from meter. power up the elecrical de to fire.Details
3 units: insall (n) kitchen cabinets in all units, update electrical & plmbing. new panel box; new common meter for common areas; homerun of electrical from meter. power up the elecrical de to fire. | $40,000 |
| Nov 4, 2020 | Completed final sign-off Aug 2024 | 1044 Judah St | mandatory soft-story retrofit to comply w/ 2016 sfebc chapter 4d and ab-107. new a.d.u's under separate permitDetails
mandatory soft-story retrofit to comply w/ 2016 sfebc chapter 4d and ab-107. new a.d.u's under separate permit | $35,000 |
| Oct 26, 2020 | Completed final sign-off Mar 2021 | 423 Spruce St | kithcen cabinet insall: new flooring update electrical panel. update plumbing, change electrical panel box update electrical for kitchen appliances, install new kitchen recess lightsDetails
kithcen cabinet insall: new flooring update electrical panel. update plumbing, change electrical panel box update electrical for kitchen appliances, install new kitchen recess lights | $20,000 |
| Aug 14, 2020 | Completed final sign-off Oct 2020 | 1219 47th Av | kitchen and bathroom remodel, relocate electrical panel. no change in kitchen and bath plumbing for this studio apt on 2nd flr. no change in walls and opennings layout.Details
kitchen and bathroom remodel, relocate electrical panel. no change in kitchen and bath plumbing for this studio apt on 2nd flr. no change in walls and opennings layout. | $8,000 |
| Jun 11, 2020 | Completed final sign-off Aug 2024 | 1044 Judah St | at existing parking garages at first floor, replace parking with four new accessory dwelling units (adus) per ordinance no. 162-16. separate building permit for related seismic soft-story retrofit (ssr).Details
at existing parking garages at first floor, replace parking with four new accessory dwelling units (adus) per ordinance no. 162-16. separate building permit for related seismic soft-story retrofit (ssr). | $200,000 |
| Mar 10, 2020 | Completed final sign-off Sep 2020 | 3425 Scott St | to comply with nov 201908051 4th fl (n) roof deck. exclusive to unit 5, roof deckDetails
to comply with nov 201908051 4th fl (n) roof deck. exclusive to unit 5, roof deck | $20,000 |
| Jan 30, 2020 | Completed final sign-off Feb 2020 | 1360 Green St | unit 11: recommencement & completion of work approved under pa 201412224244Details
unit 11: recommencement & completion of work approved under pa 201412224244 | $15,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2021 | 3436 Clay St | to remodel (e) kitchen and bathroom, add washer/dryer (direct vent), remove non-structural wall to extend closet and bedroomsDetails
to remodel (e) kitchen and bathroom, add washer/dryer (direct vent), remove non-structural wall to extend closet and bedrooms | $2,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2020 | 3130 Webster St | unit 1: replace cabinets in kitchen (5'x7'), bathroom (4'x4') remodel, new countertop, new built-in shower pan, new vanity, no changes in plumbing positions in kitchen/bathromDetails
unit 1: replace cabinets in kitchen (5'x7'), bathroom (4'x4') remodel, new countertop, new built-in shower pan, new vanity, no changes in plumbing positions in kitchen/bathrom | $18,000 |
| Nov 20, 2019 | Completed final sign-off Jan 2020 | 3425 Divisadero St | bathroom (5'x8') remodel, new shower accessories & replace tile flooring, whoer wall tiles & new vanity, alteration of walls.Details
bathroom (5'x8') remodel, new shower accessories & replace tile flooring, whoer wall tiles & new vanity, alteration of walls. | $10,000 |
| Nov 4, 2019 | Completed final sign-off Dec 2019 | 62 Oakwood St | apt a: kitchen & bathroom remodel, install new cabinets, update (e) electrical & same plumbing locations. maher n/a.Details
apt a: kitchen & bathroom remodel, install new cabinets, update (e) electrical & same plumbing locations. maher n/a. | $12,000 |
| Aug 26, 2019 | Completed final sign-off Mar 2022 | 3434 Scott St | remodel kitchen and bathroom, laundry room, replace furnance replace water heater install recess lights and gas water lines. (remodel kitchen, 1 bath, 1 laundry in each unit.Details
remodel kitchen and bathroom, laundry room, replace furnance replace water heater install recess lights and gas water lines. (remodel kitchen, 1 bath, 1 laundry in each unit. | $25,000 |
| Jul 31, 2019 | Completed final sign-off Feb 2022 | 3434 Scott St | 2nd and 3rd fl : relocate and remodel e kitchen, new powder rm, add bedrm/guest rm, add 1 full bath, relocate renew furnace,wtr htr. replace e window in kind side of rear building. remove struc roof at gr flDetails
2nd and 3rd fl : relocate and remodel e kitchen, new powder rm, add bedrm/guest rm, add 1 full bath, relocate renew furnace,wtr htr. replace e window in kind side of rear building. remove struc roof at gr fl | $150,000 |
| Jul 10, 2019 | Completed final sign-off Mar 2020 | 2616 Octavia St | remodel approx 96 sq ft kitchen, remnodel hall bath approx 15 sq ft, reces lights & moved panel box out of closet space.Details
remodel approx 96 sq ft kitchen, remnodel hall bath approx 15 sq ft, reces lights & moved panel box out of closet space. | $25,000 |
| Feb 6, 2019 | Expired or cancelled expired Jul 2025 | 900 Bay St | convert 3 garage spaces into 2 adu units, 1 (2) bedroom adu @ 2nd level & 1 studio adu @ 1st level. provide new tandem car parking space & bike parking per ordinance# 162-16.Details
convert 3 garage spaces into 2 adu units, 1 (2) bedroom adu @ 2nd level & 1 studio adu @ 1st level. provide new tandem car parking space & bike parking per ordinance# 162-16. | $185,000 |
| Oct 5, 2018 | Completed final sign-off Mar 2019 | 2121 Laguna St | remodel kitchen & change tiles in the bathroom. rerglazed bath tub, change bathroom vanity, replace kitchen cabinets.Details
remodel kitchen & change tiles in the bathroom. rerglazed bath tub, change bathroom vanity, replace kitchen cabinets. | $25,000 |
| Oct 1, 2018 | Completed final sign-off Mar 2019 | 3434 Scott St | close door between kitchen & utlity room, open door from hall to utility room, new kitchen cabinets, demo (e) bath, relocate bath vanity, install new shower pan & retileDetails
close door between kitchen & utlity room, open door from hall to utility room, new kitchen cabinets, demo (e) bath, relocate bath vanity, install new shower pan & retile | $9,500 |
| May 16, 2018 | Completed final sign-off Oct 2019 | 3425 Scott St | unit #5: revision to 201605197856. interior remodel. unit #3 kitchen remodel. unit #2 only structural work.Details
unit #5: revision to 201605197856. interior remodel. unit #3 kitchen remodel. unit #2 only structural work. | $20,000 |
| Mar 28, 2018 | Completed final sign-off Aug 2018 | 3425 Divisadero St | bathroom remodel, install recess lighting, shower pan & plumbing fixtures. maher na.Details
bathroom remodel, install recess lighting, shower pan & plumbing fixtures. maher na. | $30,000 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 3330 Scott St | to comply with physical inspection report #cc-7930. maher n/aDetails
to comply with physical inspection report #cc-7930. maher n/a | $20,000 |
| Feb 16, 2018 | Never finaled issued Feb 2018, no final | 295 Yerba Buena Av | revision to pa 2017-0922-9352, layout revision of non-structural wall @ ground floorDetails
revision to pa 2017-0922-9352, layout revision of non-structural wall @ ground floor | |
| Dec 15, 2017 | Completed final sign-off Jun 2019 | 3316 Scott St | add 1 bath on gr fl unit, convert e full bath to half bath. revision to pa# 201608266145Details
add 1 bath on gr fl unit, convert e full bath to half bath. revision to pa# 201608266145 | $10,000 |
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 295 Yerba Buena Av | revision to app#201709229352 extg foundation to support 8" ground floor excavation for new slab and new interior foundation with plywood sheathed wall at media room.Details
revision to app#201709229352 extg foundation to support 8" ground floor excavation for new slab and new interior foundation with plywood sheathed wall at media room. | $8,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 920 Cayuga Av | to comply with nov#201796331, to remove non-permitted addition & stair on g/f & 2/f. to legalize 2 full bathroom and 1 bedroom on g/fDetails
to comply with nov#201796331, to remove non-permitted addition & stair on g/f & 2/f. to legalize 2 full bathroom and 1 bedroom on g/f | $60,000 |
| Sep 22, 2017 | Never finaled issued Oct 2017, no final | 295 Yerba Buena Av | add 1 bedroom, 1 office, utility room, 2 full bathrooms, media room and family room; relocate (e) furnace & tankless water heater. repair portion of (e) foundation at e-s side of the building. to retrofit a beam on the ground floorDetails
add 1 bedroom, 1 office, utility room, 2 full bathrooms, media room and family room; relocate (e) furnace & tankless water heater. repair portion of (e) foundation at e-s side of the building. to retrofit a beam on the ground floor | $50,000 |
| Apr 24, 2017 | Completed final sign-off Mar 2018 | 415 07th Av | to legalize ground floor unit per ordinance 43-14, to add studio unit consited of kitchen area, dinning and sleepint area. sprinkler deferred, if required.Details
to legalize ground floor unit per ordinance 43-14, to add studio unit consited of kitchen area, dinning and sleepint area. sprinkler deferred, if required. | $30,000 |
| Mar 21, 2017 | Expired or cancelled expired May 2020 | 1557 Lombard St | revision to pa 2016-1103-1867 - structural scope reduced, lightwell infill, title 24 & relocated master bath.Details
revision to pa 2016-1103-1867 - structural scope reduced, lightwell infill, title 24 & relocated master bath. | |
| Jan 25, 2017 | Completed final sign-off Jun 2019 | 3318 Scott St | remodel e 2nd and 3rd fl. 2 kitchens 2, 1/2 baths and replace gas fireplace. install new efficacy led ceiling lights in both units. n/a maherDetails
remodel e 2nd and 3rd fl. 2 kitchens 2, 1/2 baths and replace gas fireplace. install new efficacy led ceiling lights in both units. n/a maher | $50,000 |
| Sep 2, 2016 | Completed final sign-off Oct 2019 | 3425 Scott St | compliance with mandatory seismic retrofit program per sfbc ch 34b: 2012 iebc appendix a-4; maher n/aDetails
compliance with mandatory seismic retrofit program per sfbc ch 34b: 2012 iebc appendix a-4; maher n/a | $60,000 |
| Aug 26, 2016 | Completed final sign-off May 2019 | 3318 Scott St | horizontal addition to rear yard, 15'x8'-4", replace all windows in kind(street facing window to be match w/ el wood trim), add post to guardrail on roof, legalize 3rd unit on ground floor. maher n/a.Details
horizontal addition to rear yard, 15'x8'-4", replace all windows in kind(street facing window to be match w/ el wood trim), add post to guardrail on roof, legalize 3rd unit on ground floor. maher n/a. | $175,000 |
| May 19, 2016 | Completed final sign-off Oct 2019 | 3425 Scott St | interior remodel of units 2,3 and 5 - each includes the relocation of kitchen. units 2 & 3 addition of mechanical room, laundry room & single bedroom.windows facing light well in the (n) bedroom of units 2 & 3 are to be replaced w/ double pane vinyl windows. all windows in unit 5 able to be replacedDetails
interior remodel of units 2,3 and 5 - each includes the relocation of kitchen. units 2 & 3 addition of mechanical room, laundry room & single bedroom.windows facing light well in the (n) bedroom of units 2 & 3 are to be replaced w/ double pane vinyl windows. all windows in unit 5 able to be replaced | $75,000 |