Block 1374, lot 026
154 15th Ave
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 2
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 3,912 sq ft
- Lot
- 3,188 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2025 | In progress issued Nov 2025 | 154 15th Av | Edri Construction Inc *See Notes* | grouting in response to pa # 202508193412Details
grouting in response to pa # 202508193412 | $6,000 |
| Feb 25, 2025 | Completed final sign-off Feb 2025 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | revision to pa#202308245116 to remove 4th floor bathroom from scope of work on permit #202308245116.Details
revision to pa#202308245116 to remove 4th floor bathroom from scope of work on permit #202308245116. | |
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr.Details
front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr. | $60,000 |
| May 22, 2023 | Completed final sign-off Mar 2025 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boilerDetails
rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boiler | $100,000 |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 154 15th Av | Cardea Bldg Dba Dimension Design Group | @ front building (interior), install a new direct-vent gas fireplace in the 2nd floor ; living roomDetails
@ front building (interior), install a new direct-vent gas fireplace in the 2nd floor ; living room | $10,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 154 15th Av | Hadley General Contractors Inc | ac addition to (e) forced air heating system @ upper two floors.Details
ac addition to (e) forced air heating system @ upper two floors. | $32,355 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 154 15th Av | C D K Construction Inc | revision to pa 2016-0613-9766 weld support to (e) structural steel i beam per engineer's detailing for support of new postDetails
revision to pa 2016-0613-9766 weld support to (e) structural steel i beam per engineer's detailing for support of new post | |
| Jun 13, 2016 | Completed final sign-off Feb 2017 | 154 15th Av | C D K Construction Inc | remodel baths, relocate ktichen, new lighting fixtures, at rear of house replace two window & door with like kind window, enlarging laundry room int. wall only, repaint int.Details
remodel baths, relocate ktichen, new lighting fixtures, at rear of house replace two window & door with like kind window, enlarging laundry room int. wall only, repaint int. | $609,200 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 154 15th Av | David Edward Conroy | repair dry rot at top of landing on front stairs over all repair less thant 50% in kind.Details
repair dry rot at top of landing on front stairs over all repair less thant 50% in kind. | $3,500 |
| Sep 30, 2008 | Completed final sign-off Jan 2009 | 154 15th Av | Sean T Condry | revision to pa# 2007/07/23/7487 to revise story count per correction notice issued by district building inspector on 099/10/07.Details
revision to pa# 2007/07/23/7487 to revise story count per correction notice issued by district building inspector on 099/10/07. | |
| Jul 23, 2007 | Completed final sign-off Jan 2009 | 154 15th Av | S T C Marin | rev to 200706285444.3/fl-remodel bathrm&walkin closet.2/fl-remodel bathroom&mstr bathrom.replace in-kind 22' of rear exterior wall.1/fl-remodel kitchen&1/2 bath.replace in kind 22' of rear exterior wall.bsmt/garage-remove post&strength beam,chg exercise&guest rm to family rm.remodel bathroom.Details
rev to 200706285444.3/fl-remodel bathrm&walkin closet.2/fl-remodel bathroom&mstr bathrom.replace in-kind 22' of rear exterior wall.1/fl-remodel kitchen&1/2 bath.replace in kind 22' of rear exterior wall.bsmt/garage-remove post&strength beam,chg exercise&guest rm to family rm.remodel bathroom. | $240,000 |
| Jun 28, 2007 | Completed final sign-off Jan 2009 | 154 15th Av | Sean T Condry | repalce existing curb/fundation with niew foundation & new slabDetails
repalce existing curb/fundation with niew foundation & new slab | $40,000 |
| Jun 7, 2007 | Completed final sign-off Jan 2009 | 154 15th Av | remodel (e) kitchen & 2 (e) bathrooms. remove plaster & lathe / drywall @ garage due to water damage. kitchen & bathroom remove to comply with title 24. 50% flourescent lighting by watts in kitchen & bath with flourescent light.Details
remodel (e) kitchen & 2 (e) bathrooms. remove plaster & lathe / drywall @ garage due to water damage. kitchen & bathroom remove to comply with title 24. 50% flourescent lighting by watts in kitchen & bath with flourescent light. | $55,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cardea Bldg Dba Dimension Design Group (4), C D K Construction Inc (2), Sean T Condry (2), David Edward Conroy, Edri Construction Inc *See Notes*, Hadley General Contractors Inc, S T C Marin
- Architects
- Jorge Carbonell (3), Brendan Riley
- Engineers
- Michael Hom (2), Erwin Otoole, Sean Condry
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.