Block 0077, lot 036
451 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 2
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 3,345 sq ft
- Lot
- 2,247 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | In progress issued Nov 2026 | 451 Lombard St | Pristine Builders Group | 1)legalize non-conforming addition at the rear of the top floor 418 sqft. 2) legalize underpermitted work at 2nd fl. interior walls removed and bath removed. all work at upper unit 451 lombard st.Details
1)legalize non-conforming addition at the rear of the top floor 418 sqft. 2) legalize underpermitted work at 2nd fl. interior walls removed and bath removed. all work at upper unit 451 lombard st. | $50,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 451 Lombard St | Xmag Construction | to comply with inspection report cc 8761 to tighten post at entry way common areaDetails
to comply with inspection report cc 8761 to tighten post at entry way common area | $150 |
| May 5, 2026 | In progress issued May 2026 | 451 Lombard St | Xmag Construction | two bathrooms remodel, retile bath, replace gfci, replace shower valves, to comply with inspection report cc 8761, electrical and plumbing updates as needed.Details
two bathrooms remodel, retile bath, replace gfci, replace shower valves, to comply with inspection report cc 8761, electrical and plumbing updates as needed. | $37,500 |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 451 Lombard St | comply violation 201724204. guardrail will be raised from current 39" to 42" by add wood cross approx 48" length. beam will be attached to ¿ walls and supports w/ wood screws. opening in supports will have 2x2 vert guards install to floor & guard rail w/ wood screes & space w/ 4" spacing per cbc1015Details
comply violation 201724204. guardrail will be raised from current 39" to 42" by add wood cross approx 48" length. beam will be attached to ¿ walls and supports w/ wood screws. opening in supports will have 2x2 vert guards install to floor & guard rail w/ wood screes & space w/ 4" spacing per cbc1015 | $300 | |
| Apr 13, 2017 | Never finaled issued Apr 2017, no final | 453 Lombard St | street space | ||
| Dec 6, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | Trinity Building Co Llc | voluntary seismic upgrade. revisions to permit #2016-0616-0083Details
voluntary seismic upgrade. revisions to permit #2016-0616-0083 | $52,000 |
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 453 Lombard St | street space | ||
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | Trinity Building Co Llc | interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of wayDetails
interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of way | $100,000 |
| Mar 14, 2005 | Never finaled issued Mar 2005, no final | 451 Lombard St | street space | ||
| Sep 22, 2004 | Completed final sign-off Jun 2005 | 451 Lombard St | remodel kitchen, new recessed cans in foyer, new doors in foyerDetails
remodel kitchen, new recessed cans in foyer, new doors in foyer | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Trinity Building Co Llc (2), Xmag Construction (2), Pristine Builders Group
- Architects
- Jorge Carbonell, Kevin Zeller
- Engineers
- Michael Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.