Kevin Zeller
- Listed as
- architect, authorized agent-others, designer
- Firm
- Zero Ten Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Jan 2026
31 permits since 2000 (architect on 29 permits, authorized agent-others on 1 permit, designer on 1 permit): 23 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2026 | In progress issued Mar 2026 | 3124 Clay St | Jetton Construction | add 2 new wood windows to match (e) style at rear elevation. replace (e) door at the rear of thr property that leads to deck. replace non compliant guard rail at deck in kind with compliant rail. bathroom remodel. no work visible from street, in public right of way or change in use or occupancy.Details
add 2 new wood windows to match (e) style at rear elevation. replace (e) door at the rear of thr property that leads to deck. replace non compliant guard rail at deck in kind with compliant rail. bathroom remodel. no work visible from street, in public right of way or change in use or occupancy. | $75,000 |
| Aug 14, 2025 | Completed final sign-off Sep 2026 | 361 Upper Tr | Sage Construction Services | revision to pa #202201135971 for reduction in scope, project to proceed with placing of windows,doors, nw balcony guardrails, select demo of interior walls less than 25%. enlarged opening of level 01 windows, replace interior stair, spiral stair down to back yard. approx. 90% reduction in app. scpDetails
revision to pa #202201135971 for reduction in scope, project to proceed with placing of windows,doors, nw balcony guardrails, select demo of interior walls less than 25%. enlarged opening of level 01 windows, replace interior stair, spiral stair down to back yard. approx. 90% reduction in app. scp | |
| Sep 12, 2024 | Completed final sign-off Sep 2024 | 3330 Steiner St | Cookline Construction Inc | revision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system.Details
revision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system. | |
| Sep 9, 2024 | Completed final sign-off Jan 2025 | 2135 Lombard St | deferred submittal of mep & title 24 only, ref pa# 2023-1026-9556, no change in architectural from previously issued p/a.Details
deferred submittal of mep & title 24 only, ref pa# 2023-1026-9556, no change in architectural from previously issued p/a. | ||
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 3330 Steiner St | Cookline Construction Inc | ti for restaurant to include interior partion , replacing kithcen equipment and associated mep. fire protection under sepearte permit. no exterior/facade workDetails
ti for restaurant to include interior partion , replacing kithcen equipment and associated mep. fire protection under sepearte permit. no exterior/facade work | $218,000 |
| Nov 8, 2023 | Completed final sign-off Jan 2025 | 2125 Lombard St | creating communicating opening between 2125 lombard and 2135 lombard st.Details
creating communicating opening between 2125 lombard and 2135 lombard st. | $12,000 | |
| Oct 26, 2023 | Completed final sign-off Jan 2025 | 2135 Lombard St | Mountain Top Construction Llc | change of use and interior ti of an (e) office at 2135 lombard st. (n) 1 story use change to bar w/ no changes to 2rd & 3rd story office uses. scope includes connecting w/ 2125 lombard with communicating opening. relocating shear walls and (n) egress components. mech, fire, ele & plum deferred.Details
change of use and interior ti of an (e) office at 2135 lombard st. (n) 1 story use change to bar w/ no changes to 2rd & 3rd story office uses. scope includes connecting w/ 2125 lombard with communicating opening. relocating shear walls and (n) egress components. mech, fire, ele & plum deferred. | $142,000 |
| May 5, 2023 | Completed final sign-off Jul 2023 | 388 Urbano Dr | Darc Ventures Inc Dba Spl Construction S | add 1 new bathroom in garage serving the family room.Details
add 1 new bathroom in garage serving the family room. | $50,000 |
| Mar 29, 2022 | Never finaled issued Apr 2022, no final | 494 Seacliff Av | Buildergirl Design And Construction | revision to pa 2020-1007-6049 to replace (e) water damaged front landing w/(n) landing & entry stairDetails
revision to pa 2020-1007-6049 to replace (e) water damaged front landing w/(n) landing & entry stair | $5,000 |
| Feb 18, 2022 | Completed final sign-off Feb 2023 | 401 Columbus Av | Eric F Anderson Incorporated | complete interior tenant improvement of an (e) restaurant incl. interior construction of walls, ceiling, millwork, electrical, plumbing and mechanical. deferred: fire alarm, fire sprinkler, steel shop drawings and kitchena fire suppresion system.Details
complete interior tenant improvement of an (e) restaurant incl. interior construction of walls, ceiling, millwork, electrical, plumbing and mechanical. deferred: fire alarm, fire sprinkler, steel shop drawings and kitchena fire suppresion system. | $148,000 |
| Jan 13, 2022 | Completed final sign-off Sep 2026 | 361 Upper Tr | Sage Construction Services, Jeff King And Company Inc | demo: remove rear wall,roof,levl 1 floor/balcony/stair,select demo of interior walls(less than 25%)remove levels 2 and 3 balconies.garage and party walls to remain. floor framing at levels 2, 3, and loft to remain. replace entry stair 1st fl,new deck, stair,and deck/hot tub at grade, new smallerDetails
demo: remove rear wall,roof,levl 1 floor/balcony/stair,select demo of interior walls(less than 25%)remove levels 2 and 3 balconies.garage and party walls to remain. floor framing at levels 2, 3, and loft to remain. replace entry stair 1st fl,new deck, stair,and deck/hot tub at grade, new smaller | $750,000 |
| Jul 20, 2021 | Completed final sign-off Oct 2022 | 235 Laidley St | Elisha Mayost | rev to pa 201902213443 facade no finish changes.Details
rev to pa 201902213443 facade no finish changes. | |
| Jul 8, 2021 | Completed final sign-off Mar 2026 | 3738 20th St | Maib Construction Company Inc | (n) decks off rear wall at 1st, 2nd & 3rd flrs. rebuild (e) exit stair from 3rd flr to rear yard. (n) site work for lower lvl infill, modifications & (n) finishes for (n) decks, (n) trash enclosure at front of house. 63 sq ft of (n) unconditioned infill on lower lvl under (e) 2nd flr.Details
(n) decks off rear wall at 1st, 2nd & 3rd flrs. rebuild (e) exit stair from 3rd flr to rear yard. (n) site work for lower lvl infill, modifications & (n) finishes for (n) decks, (n) trash enclosure at front of house. 63 sq ft of (n) unconditioned infill on lower lvl under (e) 2nd flr. | $100,000 |
| May 17, 2021 | Never finaled issued Oct 2022, no final | 1116 Balboa St | excavation/lowering of crawlspace slab to create basement level- vertical addition of 195 sqft of basement space. replacement of kitchen and new interior stair down to basement. rebuild existing rear deck and half bathroom.Details
excavation/lowering of crawlspace slab to create basement level- vertical addition of 195 sqft of basement space. replacement of kitchen and new interior stair down to basement. rebuild existing rear deck and half bathroom. | $325,000 | |
| Oct 7, 2020 | Never finaled issued Sep 2021, no final | 494 Seacliff Av | Buildergirl Design And Construction | residential interior alteration in an existing wood framed single family residence. replace all windows and exterior doors in kind, with no changes to (e) window configuration, operation and rough openings.Details
residential interior alteration in an existing wood framed single family residence. replace all windows and exterior doors in kind, with no changes to (e) window configuration, operation and rough openings. | $650,000 |
| Oct 6, 2020 | Expired or cancelled withdrawn Dec 2020 | 361 Upper Tr | full structural upgrade, demo & rebuild of rear (west) wall, roof, and levels 1 & 2 floor framing, new windows, new exterior finishes, replac balconies in kind, new radiant floor heating, (n) interior finishes ththroughout.no new additional conditioned square footage is prosed. (n) sprinkler deferDetails
full structural upgrade, demo & rebuild of rear (west) wall, roof, and levels 1 & 2 floor framing, new windows, new exterior finishes, replac balconies in kind, new radiant floor heating, (n) interior finishes ththroughout.no new additional conditioned square footage is prosed. (n) sprinkler defer | $600,000 | |
| Nov 26, 2019 | Completed final sign-off Dec 2019 | 138 23rd Av | Elisha Mayost | revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.).Details
revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.). | |
| Feb 21, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | Elisha Mayost | renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entryDetails
renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entry | $180,000 |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 1035 Market St | San Francisco Commercial Builders Inc | (n) non-load bearing, non-rated walls, doors & low partitions as specified (n) finishes (n) mechanical & electrical workDetails
(n) non-load bearing, non-rated walls, doors & low partitions as specified (n) finishes (n) mechanical & electrical work | $560,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | Trinity Building Co Llc | interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of wayDetails
interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of way | $100,000 |
| Dec 30, 2015 | Never finaled issued Jan 2016, no final | 388 Urbano Dr | Trinity Building Co Llc | interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed.Details
interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed. | $40,000 |
| Aug 24, 2015 | Expired or cancelled cancelled Mar 2017 | 71 Stevenson St | R 3 Builders Inc. | interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permitDetails
interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permit | $30,000 |
| Jul 20, 2015 | Completed final sign-off Oct 2015 | 252 05th St | San Francisco Commercial Builders Inc | change of occupancy from m to b occupancy - fire time tenant improvement for a retail space at ground floor shopping center. landlord is provided shell space intended for a retail. new work includes interior lighitng, mech, plumbing & electrical work. ref pa #201106017202.Details
change of occupancy from m to b occupancy - fire time tenant improvement for a retail space at ground floor shopping center. landlord is provided shell space intended for a retail. new work includes interior lighitng, mech, plumbing & electrical work. ref pa #201106017202. | $185,000 |
| Jun 3, 2015 | Completed final sign-off Oct 2015 | 2112 23rd St | Huff Construction Company Inc | renovation kitchen & bathroom @ 2nd floor & other parts of living areas per plan.Details
renovation kitchen & bathroom @ 2nd floor & other parts of living areas per plan. | $40,000 |
| Jun 2, 2015 | Completed final sign-off Oct 2015 | 2112 23rd St | Huff Construction Company Inc | new skylights and window replacement of all street facing with double hung wood windows & stucco, repair to match existingDetails
new skylights and window replacement of all street facing with double hung wood windows & stucco, repair to match existing | $8,000 |
| Oct 22, 2014 | Completed final sign-off Apr 2016 | 790 Valencia St | Ewsf Inc. | administrative purpose only. no work under this permit. all work don under pa# 2014/08/11/3533. for planning department purpose only to clarify use for public notice as limited restaurant & not formula retail.Details
administrative purpose only. no work under this permit. all work don under pa# 2014/08/11/3533. for planning department purpose only to clarify use for public notice as limited restaurant & not formula retail. | |
| Jun 27, 2014 | Never finaled issued Aug 2014, no final | 678 Geary St | Alsterlind Construction Inc. | change of use from retail to wine bar with retail sales. interior t.i.: g/f- wine bar & retail sales. basement- storage. new bar, back bar, seating & retail display, new finishes as indicated. new bar equipment, new mep for t.i., new basement storage. n/a ordinance #155-13.Details
change of use from retail to wine bar with retail sales. interior t.i.: g/f- wine bar & retail sales. basement- storage. new bar, back bar, seating & retail display, new finishes as indicated. new bar equipment, new mep for t.i., new basement storage. n/a ordinance #155-13. | $300,000 |
| Jul 29, 2013 | Completed final sign-off Jan 2014 | 660 Market St | Terra Nova Industries | suite #650-interior t.i-new sandwich shop at grd fl on (e) bldg including new commercial kitchen, seating & retail areas, interior lighting, plumbing & electrical work. a new accessible restrooms. no changes to (e) tenant footprint, area or height are proposed as part of the scopeDetails
suite #650-interior t.i-new sandwich shop at grd fl on (e) bldg including new commercial kitchen, seating & retail areas, interior lighting, plumbing & electrical work. a new accessible restrooms. no changes to (e) tenant footprint, area or height are proposed as part of the scope | $244,500 |
| Mar 13, 2013 | Completed final sign-off May 2013 | 3725 Buchanan St | Cody Vermette Group Inc | 4th floor:interior improvement in an extg office bldg to enlarge extg breakroom and remodel an extg toilet room to apply comply with current ada requirements.Details
4th floor:interior improvement in an extg office bldg to enlarge extg breakroom and remodel an extg toilet room to apply comply with current ada requirements. | $24,400 |
| Mar 13, 2013 | Completed final sign-off Aug 2013 | 3725 Buchanan St | Cody Vermette Group Inc | 2nd fl unit #204:interior demolition and renovation of selected walls, ceiling, millwork and electrical system.Details
2nd fl unit #204:interior demolition and renovation of selected walls, ceiling, millwork and electrical system. | $19,800 |
| Nov 16, 2012 | Completed final sign-off Oct 2013 | 3228 Sacramento St | Alsterlind Construction Inc. | ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2Details
ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2 | $625,000 |