Chia Wang Yeh
- Listed as
- architect, engineer
- Firm
- Chiawang Structural Eng
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Jun 2026
51 permits since 2000 (engineer on 49 permits, architect on 2 permits): 27 completed, 13 in progress, 5 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 2919 California St | Buck O'neill Builders Inc. | foundation upgrades related to improvements @ 2917 california street, reference for pa# 202506037824Details
foundation upgrades related to improvements @ 2917 california street, reference for pa# 202506037824 | |
| Apr 8, 2026 | In progress issued May 2026 | 2101 Mission St | Buildtech West | stair connection 1st and 2nd floors of office suiteDetails
stair connection 1st and 2nd floors of office suite | $30,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 2101 Mission St | Bay Air Systems, Inc | install new mechanical heating & cooling systom for 1st & 2nd fl, ste 100 & 200. fan coils weight 67 lbs, condensing unit 775 lbs. ref arch pa# 202602266554Details
install new mechanical heating & cooling systom for 1st & 2nd fl, ste 100 & 200. fan coils weight 67 lbs, condensing unit 775 lbs. ref arch pa# 202602266554 | $250,000 |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 244 Napoleon St | Bauman Landscape & Construction Inc. | to comply with nov#202536112: partial demolition of structure at the north. new ada bathroom.Details
to comply with nov#202536112: partial demolition of structure at the north. new ada bathroom. | $8,000 |
| Jan 23, 2026 | In progress issued Feb 2026 | 524 Central Av | revision to pa 202404260881 remove structural work @ 3rd fl front unit; front unit layout to remain unchanged. structural work removed was approved under voluntary seismic strengthening, ref (202404260881 and 202111303291)Details
revision to pa 202404260881 remove structural work @ 3rd fl front unit; front unit layout to remain unchanged. structural work removed was approved under voluntary seismic strengthening, ref (202404260881 and 202111303291) | ||
| Jan 12, 2026 | In progress issued May 2026 | 1875 48th Av | Huey Const Mngmt Co Inc - Dba M H Const. | convert(e) rear portion of the lvl 1 into new adu (exclude garage). interior remodel at lvl 2 with interior stair relocation. new rear deck. new heat pump and tankless water heater. new lighting and electrical outlets per plan.Details
convert(e) rear portion of the lvl 1 into new adu (exclude garage). interior remodel at lvl 2 with interior stair relocation. new rear deck. new heat pump and tankless water heater. new lighting and electrical outlets per plan. | $250,000 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | update to ground fl equipment locations. add wet bar at 2nd story dining room. replace windows and siding. add insulation, add shear wall and posts at east wall. clarification to guard at roof hatch/equipment location. siding & windows at east and south locations, not visible from street.Details
update to ground fl equipment locations. add wet bar at 2nd story dining room. replace windows and siding. add insulation, add shear wall and posts at east wall. clarification to guard at roof hatch/equipment location. siding & windows at east and south locations, not visible from street. | $30,000 |
| Oct 29, 2025 | In progress issued Nov 2025 | 2723 Oakdale Av | Edpo Construction Inc | demolition of a portion of an interior wall along with the existing, and pass through window. re-loacation of light switches to existing adjacent wall. installation of stainless steal shelf in existing pony wall and new outlets. electrical permit reference ew2025210270433.Details
demolition of a portion of an interior wall along with the existing, and pass through window. re-loacation of light switches to existing adjacent wall. installation of stainless steal shelf in existing pony wall and new outlets. electrical permit reference ew2025210270433. | $10,000 |
| Oct 28, 2025 | Completed final sign-off Dec 2025 | 929 Darien Wy | Vieira Firm Construction & Design | revision to permit 202408138483. reduced number of windows. relocated furnace and water heater. structural beam added. laundry entrance revised. electrical panel relocated.Details
revision to permit 202408138483. reduced number of windows. relocated furnace and water heater. structural beam added. laundry entrance revised. electrical panel relocated. | |
| Jun 23, 2025 | In progress issued Jul 2026 | 2917 California St | Buck O'neill Builders Inc. | rear expansion and adu addition at ground floor, 2/f remodel including deck above adu expansion area,Details
rear expansion and adu addition at ground floor, 2/f remodel including deck above adu expansion area, | $500,000 |
| May 28, 2025 | In progress issued Jun 2025 | 34 Roselyn Tr | Blue Wood Construction Inc. | revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs.Details
revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs. | |
| Mar 17, 2025 | In progress issued Jul 2025 | 345 31st Av | Kieran Collins Construction | rear deck within buildable area . new sliding doorDetails
rear deck within buildable area . new sliding door | $12,000 |
| Sep 20, 2024 | In progress issued Jan 2025 | 34 Roselyn Tr | Blue Wood Construction Inc. | interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout.Details
interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout. | $100,000 |
| Aug 29, 2024 | Completed final sign-off Mar 2026 | 2750 19th St | Metcon Ti, Inc | t.i. improvements to the (e)bldg. ref#: approved and issued 201712156685 (iii-a, 6 stories, 1 basement) & pa#: 202007150223 (change const type iii-a to i-a) - level 01: add (n) restrooms, janitor & storage closets, conference room, office & break ara (n) partitions, lighting, power and signal & hvacDetails
t.i. improvements to the (e)bldg. ref#: approved and issued 201712156685 (iii-a, 6 stories, 1 basement) & pa#: 202007150223 (change const type iii-a to i-a) - level 01: add (n) restrooms, janitor & storage closets, conference room, office & break ara (n) partitions, lighting, power and signal & hvac | $350,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2025 | 929 Darien Wy | Vieira Firm Construction & Design | remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per planDetails
remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per plan | $250,000 |
| Jul 23, 2024 | In progress issued Jul 2024 | 535 Fell St | revision to pa# 2018-08607-1297 to upgrade reinforce concrete foundation in the front of the property. shoring provided under separate bpa#202308305614.Details
revision to pa# 2018-08607-1297 to upgrade reinforce concrete foundation in the front of the property. shoring provided under separate bpa#202308305614. | ||
| Apr 26, 2024 | In progress issued Apr 2024 | 524 Central Av | change of engineer of record & new engineer design ref pa# 202111303291Details
change of engineer of record & new engineer design ref pa# 202111303291 | ||
| Mar 12, 2024 | Expired or cancelled expired Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | revision to 202402015072- update structural plans to include add shear wall and posts @ 3rd floor framing plan and add posts and hold downs @ 1st and 2nd floorDetails
revision to 202402015072- update structural plans to include add shear wall and posts @ 3rd floor framing plan and add posts and hold downs @ 1st and 2nd floor | $5,000 |
| Feb 1, 2024 | Expired or cancelled expired Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | revision to pa# 202310128497, demolish damaged portion of side deck, add guardrails as required; remove exterior siding replacment from scope; remove thrid-story bathroom remodel from scope; reduce # of doors/windows to be replaced (title 24 report revised); rebuild second-story (lower) roof @ rear;Details
revision to pa# 202310128497, demolish damaged portion of side deck, add guardrails as required; remove exterior siding replacment from scope; remove thrid-story bathroom remodel from scope; reduce # of doors/windows to be replaced (title 24 report revised); rebuild second-story (lower) roof @ rear; | $20,000 |
| Oct 12, 2023 | Completed final sign-off Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visiblDetails
inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visibl | $150,000 |
| Dec 20, 2022 | Completed final sign-off Nov 2023 | 2378 31st Av | Jones Bros Construction & Design Inc | ref pa#2021-0203-3920. re-inforce the e rear wall foundationDetails
ref pa#2021-0203-3920. re-inforce the e rear wall foundation | $10,000 |
| Aug 16, 2022 | Never finaled issued Oct 2022, no final | 476 Pennsylvania Av | Lemus Construction Inc | remodal of (e) 2 units each unit to get 1 new batahroom (e) kitchen to be relocated and remodeled (n) storage rooms in garageDetails
remodal of (e) 2 units each unit to get 1 new batahroom (e) kitchen to be relocated and remodeled (n) storage rooms in garage | $200,000 |
| Mar 15, 2022 | Completed final sign-off Aug 2023 | 440 28th St | revision to approved permit 202105170462 and 201810314602. change floor layout per plans. new catilever deck with stair to upper yard, new wet bar at 1/f bedroom, relocate water heater and floor heating system to garage.Details
revision to approved permit 202105170462 and 201810314602. change floor layout per plans. new catilever deck with stair to upper yard, new wet bar at 1/f bedroom, relocate water heater and floor heating system to garage. | $12,000 | |
| Jan 6, 2022 | Completed final sign-off Apr 2023 | 49 Crestmont Dr | Alex Painting & Construction | interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level.Details
interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level. | $20,000 |
| Nov 3, 2021 | Expired or cancelled withdrawn Mar 2022 | 1011 Bryant St | C C I Commercial Construction & Improv | t.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows.Details
t.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows. | $965,000 |
| Oct 20, 2021 | Expired or cancelled cancelled Jan 2026 | 1574 09th Av | 1/f: existing living room expansion. existing laundry and storage renovation. new radiant heat with new combo water heater.Details
1/f: existing living room expansion. existing laundry and storage renovation. new radiant heat with new combo water heater. | $40,000 | |
| Oct 15, 2021 | Completed final sign-off Apr 2023 | 50 Lucerne St | Build Ur Dream Builders Inc | unit 6: renovate (e) bathrooms (2) & kitchen, shft laundry closet wall over, demo internal wall and relocate to right. built out closet.Details
unit 6: renovate (e) bathrooms (2) & kitchen, shft laundry closet wall over, demo internal wall and relocate to right. built out closet. | $95,000 |
| Sep 22, 2021 | Completed final sign-off Oct 2022 | 620 Duncan St | new spa & modified (e) deck. new ipe deck & steps with guardrail. new fire table with retaining wall & build in bench.Details
new spa & modified (e) deck. new ipe deck & steps with guardrail. new fire table with retaining wall & build in bench. | $150,000 | |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | Dliu Construction | revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left.Details
revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left. | |
| Jul 2, 2021 | Completed final sign-off Nov 2021 | 2225 15th St | repair part of footing damaged by water in common area of the condo. section of bldg with damage will be supported with adjustable posts. damaged footing will be removed, studs shortened 1 foot at base and sill plate replaced. new reinforced concrete footing will be installed at sameDetails
repair part of footing damaged by water in common area of the condo. section of bldg with damage will be supported with adjustable posts. damaged footing will be removed, studs shortened 1 foot at base and sill plate replaced. new reinforced concrete footing will be installed at same | $42,000 | |
| Feb 13, 2021 | Never finaled filed Feb 2021, never issued | 364 Valley St | build a new entrance on the basement level.build a new staircase from the new garage to the new entrance door and internal extension. addition one more floor as a recreation room on the top of the building,addition 4'-6" at the back of the building. remodel kitchen, bathrooms and living room.Details
build a new entrance on the basement level.build a new staircase from the new garage to the new entrance door and internal extension. addition one more floor as a recreation room on the top of the building,addition 4'-6" at the back of the building. remodel kitchen, bathrooms and living room. | $400,000 | |
| Feb 5, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | Maan Global Development | revision to pa# 202010076118. convert ground floor to 2nd unit allowed by planning zoning.Details
revision to pa# 202010076118. convert ground floor to 2nd unit allowed by planning zoning. | |
| Dec 30, 2020 | Never finaled issued Mar 2021, no final | 2745 Rivera St | 2/f kitchen remodel ( 135sf). remove 2 columns & girders in garage.Details
2/f kitchen remodel ( 135sf). remove 2 columns & girders in garage. | $50,000 | |
| Dec 14, 2020 | Expired or cancelled cancelled Jan 2026 | 478 Arch St | Evergreen Construction Company | remove tile and damaged fence between 478 arch st & 425 garfield st. install retaining concrete wall at property line of 478 arch st adjacent to 425 garfield st. install new fence of 5'6" on top of new retaining wall.Details
remove tile and damaged fence between 478 arch st & 425 garfield st. install retaining concrete wall at property line of 478 arch st adjacent to 425 garfield st. install new fence of 5'6" on top of new retaining wall. | $15,000 |
| Aug 24, 2020 | Completed final sign-off Aug 2021 | 3212 Broderick St | Buck O'neill Builders Inc. | convert 1st floor garage/mechanical room into living space. new electrical outlets & lighting. water damage, non-structural repair @ upper level.Details
convert 1st floor garage/mechanical room into living space. new electrical outlets & lighting. water damage, non-structural repair @ upper level. | $80,000 |
| Jul 1, 2020 | Completed final sign-off Dec 2020 | 555 De Haro St | Constructive Solutions Inc. | 2nd fl - change of use (pdr to lab) ti remodel of (e) 12,378 sf of interior space for lab, demonstration space, offices, conference rooms, shower and (e) toiletDetails
2nd fl - change of use (pdr to lab) ti remodel of (e) 12,378 sf of interior space for lab, demonstration space, offices, conference rooms, shower and (e) toilet | $1,200,000 |
| Jan 27, 2020 | Expired or cancelled expired Mar 2025 | 347 Panorama Dr | rev to pa# 201904087354; install deck to the back yard and less than 10 ft terrace deck to the deck extensionDetails
rev to pa# 201904087354; install deck to the back yard and less than 10 ft terrace deck to the deck extension | $8,000 | |
| Jun 18, 2019 | Completed final sign-off Jul 2022 | 118 Buena Vista Tr | C K Construction | add elevator & vestibule at rear covered deck, from ground floor to 3rd floor. remove rear exterior stair from 2nd to rear yard. add roof/trellis above rear patio.Details
add elevator & vestibule at rear covered deck, from ground floor to 3rd floor. remove rear exterior stair from 2nd to rear yard. add roof/trellis above rear patio. | $90,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 175 Rolph St | Wah Wong Construction Inc | voluntary structural strengthening at rear bldgDetails
voluntary structural strengthening at rear bldg | $10,000 |
| Feb 21, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | Elisha Mayost | renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entryDetails
renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entry | $180,000 |
| Jun 19, 2018 | Completed final sign-off Jan 2019 | 324 Lakeview Av | Eco Village Costruction | convert & remoedl ground fl storage room into (n) bedroom. add a (n) full bath at same level. add (n) wood deck.Details
convert & remoedl ground fl storage room into (n) bedroom. add a (n) full bath at same level. add (n) wood deck. | $79,000 |
| Feb 27, 2018 | Completed final sign-off Oct 2018 | 372 Vallejo St | to comply with nov #201829311 & 201719341, items 4 & 5. existing roof deck - repair/replace rail system. replace deck cover with redwood over existing deck framing. replace in-kind.Details
to comply with nov #201829311 & 201719341, items 4 & 5. existing roof deck - repair/replace rail system. replace deck cover with redwood over existing deck framing. replace in-kind. | $2,500 | |
| Dec 22, 2017 | Completed final sign-off Jul 2019 | 2746 Folsom St | unit a , 1st floor: revision to pa #201711174239: - move interior door location, replace portion of conc. slab, add windows @ south light court, add depressed slab at rear of unit.Details
unit a , 1st floor: revision to pa #201711174239: - move interior door location, replace portion of conc. slab, add windows @ south light court, add depressed slab at rear of unit. | $6,000 | |
| Oct 24, 2017 | Completed final sign-off Nov 2024 | 76 14th St | Polytec Construction Company Inc | renovate the interior of an (e) ground floor garage & storage space to owner operated wholesale bagel manafacturing facility. no retail, sale, services or public access. ** maher: n/a **Details
renovate the interior of an (e) ground floor garage & storage space to owner operated wholesale bagel manafacturing facility. no retail, sale, services or public access. ** maher: n/a ** | $150,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2018 | 3035 20th Av | Lopez Quality Construction | remodel one bedroom: alter window openings, new window, new insulation, new drywall, new electrical. not visible front street.Details
remodel one bedroom: alter window openings, new window, new insulation, new drywall, new electrical. not visible front street. | $12,000 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 50 California St | Skyline Construction | structural work for movable partition at multi purpose room ref 201706078690 maher not reqDetails
structural work for movable partition at multi purpose room ref 201706078690 maher not req | |
| Nov 29, 2016 | Never finaled issued Nov 2016, no final | 3487 17th St | Top Construction | installation of i-beam revision to pa 2016-0420-5251Details
installation of i-beam revision to pa 2016-0420-5251 | $2,000 |
| Nov 1, 2016 | Completed final sign-off Apr 2017 | 833 Sunnydale Av | Bay C T Construction Inc. | convert rear basement workshop to bedrooms with bathrooms.Details
convert rear basement workshop to bedrooms with bathrooms. | $50,000 |
| Feb 1, 2016 | Completed final sign-off Aug 2016 | 527 Lincoln Wy | per correction notice issue dated 1-27-16 by m. chan - revision to pa #201509187376 & 201512285989 - new rear deck with spiral stair.Details
per correction notice issue dated 1-27-16 by m. chan - revision to pa #201509187376 & 201512285989 - new rear deck with spiral stair. | $10,000 | |
| Sep 18, 2015 | Completed final sign-off Aug 2016 | 527 Lincoln Wy | garage expansion. bathroom addition, kitchen/bath/bedroom remodel. add spiral stair at the rear studio.Details
garage expansion. bathroom addition, kitchen/bath/bedroom remodel. add spiral stair at the rear studio. | $110,000 | |
| Sep 18, 2015 | Completed final sign-off Aug 2016 | 527 Lincoln Wy | exploratory demolition approximately 100 sq ft.Details
exploratory demolition approximately 100 sq ft. | $5,000 |