Ha Koo
- Listed as
- architect
- Firm
- Koo Architect
- On San Francisco permits
- Aug 2024 to Oct 2025
2 permits since 2000 (architect on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2025 | Completed final sign-off Dec 2025 | 929 Darien Wy | Vieira Firm Construction & Design | revision to permit 202408138483. reduced number of windows. relocated furnace and water heater. structural beam added. laundry entrance revised. electrical panel relocated.Details
revision to permit 202408138483. reduced number of windows. relocated furnace and water heater. structural beam added. laundry entrance revised. electrical panel relocated. | |
| Aug 13, 2024 | Completed final sign-off Dec 2025 | 929 Darien Wy | Vieira Firm Construction & Design | remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per planDetails
remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per plan | $250,000 |