Marc Ojanen
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Ojanen Chiou Architets Llp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Jun 2026
53 permits since 2000 (architect on 52 permits, authorized agent-others on 3 permits, engineer on 1 permit): 36 completed, 6 in progress, 5 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 2919 California St | Buck O'neill Builders Inc. | foundation upgrades related to improvements @ 2917 california street, reference for pa# 202506037824Details
foundation upgrades related to improvements @ 2917 california street, reference for pa# 202506037824 | |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | update to ground fl equipment locations. add wet bar at 2nd story dining room. replace windows and siding. add insulation, add shear wall and posts at east wall. clarification to guard at roof hatch/equipment location. siding & windows at east and south locations, not visible from street.Details
update to ground fl equipment locations. add wet bar at 2nd story dining room. replace windows and siding. add insulation, add shear wall and posts at east wall. clarification to guard at roof hatch/equipment location. siding & windows at east and south locations, not visible from street. | $30,000 |
| Dec 23, 2025 | In progress issued Jul 2026 | 751 Clay St | Estrada's Construction Inc | tenant improvement in existing storefront including removal of non structural partioins walls, addition of break area with kitchenette, upgrade existing bathroom to current accessibility standards, replacement of existing lighting fixtures, new finishes throughoutDetails
tenant improvement in existing storefront including removal of non structural partioins walls, addition of break area with kitchenette, upgrade existing bathroom to current accessibility standards, replacement of existing lighting fixtures, new finishes throughout | $50,000 |
| Jun 23, 2025 | In progress issued Jul 2026 | 2917 California St | Buck O'neill Builders Inc. | rear expansion and adu addition at ground floor, 2/f remodel including deck above adu expansion area,Details
rear expansion and adu addition at ground floor, 2/f remodel including deck above adu expansion area, | $500,000 |
| May 28, 2025 | In progress issued Jun 2025 | 34 Roselyn Tr | Blue Wood Construction Inc. | revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs.Details
revision to permit 202408299703 & 202503202658. to add an supplemental railing detail for interior stairs. | |
| Mar 20, 2025 | In progress issued Mar 2025 | 34 Roselyn Tr | Blue Wood Construction Inc. | this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail.Details
this is a revision to pa#2024-0829-9703. replace slab on grade. replace custom deck railing to pre-engineered. change rear window types. change wood partition at stair opening to glass guardrail. | $5,000 |
| Sep 20, 2024 | In progress issued Jan 2025 | 34 Roselyn Tr | Blue Wood Construction Inc. | interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout.Details
interior remodel and rear deck addition, replace all windows (facing front) add bathroom at 2nd floor, enlarge lower front entry doorway, add sliding glass door at rear, upgrade hvac, water heater, electrical and lighting throughout. | $100,000 |
| Mar 12, 2024 | Expired or cancelled expired Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | revision to 202402015072- update structural plans to include add shear wall and posts @ 3rd floor framing plan and add posts and hold downs @ 1st and 2nd floorDetails
revision to 202402015072- update structural plans to include add shear wall and posts @ 3rd floor framing plan and add posts and hold downs @ 1st and 2nd floor | $5,000 |
| Feb 1, 2024 | Expired or cancelled expired Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | revision to pa# 202310128497, demolish damaged portion of side deck, add guardrails as required; remove exterior siding replacment from scope; remove thrid-story bathroom remodel from scope; reduce # of doors/windows to be replaced (title 24 report revised); rebuild second-story (lower) roof @ rear;Details
revision to pa# 202310128497, demolish damaged portion of side deck, add guardrails as required; remove exterior siding replacment from scope; remove thrid-story bathroom remodel from scope; reduce # of doors/windows to be replaced (title 24 report revised); rebuild second-story (lower) roof @ rear; | $20,000 |
| Jan 31, 2024 | Completed final sign-off Dec 2024 | 50 Cerritos Av | Modern Craft Construction | revision to pa# 202101303692: relocate basement egress to exterior stairway. reframe access stairway from first floor to basement; not a required means of egress.Details
revision to pa# 202101303692: relocate basement egress to exterior stairway. reframe access stairway from first floor to basement; not a required means of egress. | |
| Oct 12, 2023 | Completed final sign-off Apr 2026 | 2917 California St | Buck O'neill Builders Inc. | inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visiblDetails
inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visibl | $150,000 |
| Apr 13, 2023 | Expired or cancelled expired Dec 2024 | 50 Cerritos Av | Modern Craft Construction | rev to pa#202101303692: change new and replacement windows from wood to alumiunm-clad wood.Details
rev to pa#202101303692: change new and replacement windows from wood to alumiunm-clad wood. | |
| Aug 30, 2022 | Never finaled filed Aug 2022, never issued | 787 27th St | horizontal expansion and vertical addition. full interior remodel. full seismic upgrade per sfebc 403.13. adu at basement to be permitted separately.Details
horizontal expansion and vertical addition. full interior remodel. full seismic upgrade per sfebc 403.13. adu at basement to be permitted separately. | $500,000 | |
| Feb 2, 2022 | Completed final sign-off Sep 2022 | 857 Fillmore St | revision to pa# 202109218857. at rear bedroom interior, remove (e) lath & plaster from walls. upgrade electrical, add insulation, install plywood at exterior wall framing & gwb sheathing throughout.Details
revision to pa# 202109218857. at rear bedroom interior, remove (e) lath & plaster from walls. upgrade electrical, add insulation, install plywood at exterior wall framing & gwb sheathing throughout. | $7,500 | |
| Jan 6, 2022 | Completed final sign-off Apr 2023 | 49 Crestmont Dr | Alex Painting & Construction | interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level.Details
interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level. | $20,000 |
| Dec 10, 2021 | Completed final sign-off Sep 2022 | 857 Fillmore St | relocate and enlarge attick hatch, add fold down attic access ladder with insulated door. work lights and electrical outlets.Details
relocate and enlarge attick hatch, add fold down attic access ladder with insulated door. work lights and electrical outlets. | $3,000 | |
| Feb 18, 2021 | Completed final sign-off Sep 2021 | 478 10th Av | replace (e) kitchen cabienets. remodel 2 bathrooms. replace bathroom window. combine 2 bathrooms.Details
replace (e) kitchen cabienets. remodel 2 bathrooms. replace bathroom window. combine 2 bathrooms. | $70,000 | |
| Jan 30, 2021 | Completed final sign-off Dec 2024 | 50 Cerritos Av | Modern Craft Construction | basement: excavation & expansion of habitable space; 1st fl: interior cosmetic improvements; 2nd fl: rear addition, interior reconfig; limited window replacement/reconfig related to interiors scope; repairs to front entry stairway replacement of basement stairway @ side yard; mep under sep permitDetails
basement: excavation & expansion of habitable space; 1st fl: interior cosmetic improvements; 2nd fl: rear addition, interior reconfig; limited window replacement/reconfig related to interiors scope; repairs to front entry stairway replacement of basement stairway @ side yard; mep under sep permit | $300,000 |
| Dec 11, 2020 | Completed final sign-off May 2021 | 480 10th Av | replace kitchen cabs. combine 1/2 bath into 1 full bath on upper level. remodel 1 bath on upper level. add bathroom on lower level. add doors to rear yard, and rear yard deck max 30 inches above grade. replace windows per plans.Details
replace kitchen cabs. combine 1/2 bath into 1 full bath on upper level. remodel 1 bath on upper level. add bathroom on lower level. add doors to rear yard, and rear yard deck max 30 inches above grade. replace windows per plans. | $20,000 | |
| Nov 26, 2019 | Completed final sign-off Jan 2021 | 95 Cerritos Av | Balla Construction And Design | rev to pa# 201803022768; reconfigure/remodel 3rd fl. bathroom, add laundry closet and bedroom closet, remove washer/dryer from 1st fl. remove laundry chute from all 3 levels, reconfigure 2nd fl. hallway and 3rd fl. closets, enlare attic access, replace attic skylightDetails
rev to pa# 201803022768; reconfigure/remodel 3rd fl. bathroom, add laundry closet and bedroom closet, remove washer/dryer from 1st fl. remove laundry chute from all 3 levels, reconfigure 2nd fl. hallway and 3rd fl. closets, enlare attic access, replace attic skylight | $15,000 |
| Aug 13, 2019 | Completed final sign-off Jan 2021 | 95 Cerritos Av | Balla Construction And Design | revision to pa 2018-0302-2768 replace bathroom window on 2nd floor; replace windows on 3rd fl, no change in window sizesDetails
revision to pa 2018-0302-2768 replace bathroom window on 2nd floor; replace windows on 3rd fl, no change in window sizes | $5,000 |
| Jun 19, 2019 | Completed final sign-off Mar 2020 | 704 Broderick St | revision to permit #201710050468. lower unit: remove wall between kitchen & laundry room. upper unit: at main level: remodel kitchen, bathroom & half bath. at upper level: add bathroom, reconfigure closets, replace (e) insulation and drywall.Details
revision to permit #201710050468. lower unit: remove wall between kitchen & laundry room. upper unit: at main level: remodel kitchen, bathroom & half bath. at upper level: add bathroom, reconfigure closets, replace (e) insulation and drywall. | $50,000 | |
| May 14, 2019 | Completed final sign-off Oct 2019 | 2155 Balboa St | Peak General Contractors Inc | apartment remodel - reconfigure interior non-load bearing partitions, remodel kitchen & bath, replace furnace & water heater; add washer & dryerDetails
apartment remodel - reconfigure interior non-load bearing partitions, remodel kitchen & bath, replace furnace & water heater; add washer & dryer | $49,000 |
| Aug 31, 2018 | Never finaled issued Dec 2018, no final | 325 Fillmore St | add dwelling units to ground & 4th fl. nov# 199815922 at location of unauthorized units. ground floor: add 2 bedroom, 2 baths dwlg unit, add rear deck and new windows. 4th floor:convert extg living space to dwelling unit, remove sunroom enclosures. 2nd & 3rd floor: upgrade stair enclosed to 1 hourDetails
add dwelling units to ground & 4th fl. nov# 199815922 at location of unauthorized units. ground floor: add 2 bedroom, 2 baths dwlg unit, add rear deck and new windows. 4th floor:convert extg living space to dwelling unit, remove sunroom enclosures. 2nd & 3rd floor: upgrade stair enclosed to 1 hour | $80,000 | |
| Aug 23, 2018 | Completed final sign-off Mar 2020 | 212 Steiner St | Peak General Contractors Inc | reconstruct garage & decks @ rear yard.Details
reconstruct garage & decks @ rear yard. | $30,000 |
| Jul 27, 2018 | Completed final sign-off Sep 2018 | 192 23rd Av | change use of living room to bedroom. no construction work.Details
change use of living room to bedroom. no construction work. | ||
| Jul 20, 2018 | Expired or cancelled cancelled Feb 2025 | 121 Ward St | comply nov 201711251, new windows installed throughout & 2 story addition with deck on both levels. add 1/2 bath.Details
comply nov 201711251, new windows installed throughout & 2 story addition with deck on both levels. add 1/2 bath. | $35,000 | |
| Jul 19, 2018 | Completed final sign-off Jul 2019 | 3107 Sacramento St | Reveal Partners | tenant improvemnet: change of use from office to classroom. remove non-load bearing partition, new paint and carpet throughout, new threshold + power door opener @ entryDetails
tenant improvemnet: change of use from office to classroom. remove non-load bearing partition, new paint and carpet throughout, new threshold + power door opener @ entry | $12,900 |
| Jun 7, 2018 | Never finaled issued Nov 2021, no final | 535 Fell St | Alvarado Structural Steel, Chen Zhang, Singh Construction | interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a)Details
interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a) | $300,000 |
| Mar 2, 2018 | Never finaled issued Jun 2019, no final | 95 Cerritos Av | Balla Construction And Design | voluntary seimsic upgrade. garage, storage & kitchen renovation. replace garage doors. replace 3 sets of windows w/n the same openings. all windows to be framed with true divides (if applicable) & bathroom remodel.Details
voluntary seimsic upgrade. garage, storage & kitchen renovation. replace garage doors. replace 3 sets of windows w/n the same openings. all windows to be framed with true divides (if applicable) & bathroom remodel. | $100,000 |
| Feb 6, 2018 | Completed final sign-off May 2018 | 3621 26th St | apt #2: add french door to extg bedroom at lower level, add rated door between bedroom and utility room.Details
apt #2: add french door to extg bedroom at lower level, add rated door between bedroom and utility room. | $3,000 | |
| Jan 9, 2018 | Completed final sign-off Sep 2019 | 439 43rd Av | 439 43rd - remodel kitchen, replace windows @ front elevation; 441 43rd av - remodel kitchen & bathroom, replace windows @ front elevationDetails
439 43rd - remodel kitchen, replace windows @ front elevation; 441 43rd av - remodel kitchen & bathroom, replace windows @ front elevation | $30,000 | |
| Dec 22, 2017 | Completed final sign-off Jul 2019 | 2746 Folsom St | unit a , 1st floor: revision to pa #201711174239: - move interior door location, replace portion of conc. slab, add windows @ south light court, add depressed slab at rear of unit.Details
unit a , 1st floor: revision to pa #201711174239: - move interior door location, replace portion of conc. slab, add windows @ south light court, add depressed slab at rear of unit. | $6,000 | |
| Oct 5, 2017 | Completed final sign-off Mar 2020 | 704 Broderick St | 704a broderick: remodel of (e) bathroom & addtion of a (n) bathroom at lower unit. (covert (e) closet into bathroom).Details
704a broderick: remodel of (e) bathroom & addtion of a (n) bathroom at lower unit. (covert (e) closet into bathroom). | $10,000 | |
| Aug 2, 2017 | Completed final sign-off Nov 2018 | 84 Harriet St | clarify type of lumber required for stair reconstruction rev to pa 2017-0221-9748Details
clarify type of lumber required for stair reconstruction rev to pa 2017-0221-9748 | ||
| Aug 2, 2017 | Completed final sign-off Nov 2018 | 84 Harriet St | relocate (e) electrical panel and meters to new niche in exterior wall. rev to pa 2016-0108-6638/r1Details
relocate (e) electrical panel and meters to new niche in exterior wall. rev to pa 2016-0108-6638/r1 | $3,000 | |
| Mar 29, 2017 | Completed final sign-off Jul 2019 | 1238 47th Av | P J Hegarty Construction | revision to permit #2015-10-22-0567 s-1. reconfigure roof deck elements add heater support posts, replace skylight and guardrails in-kindDetails
revision to permit #2015-10-22-0567 s-1. reconfigure roof deck elements add heater support posts, replace skylight and guardrails in-kind | |
| Feb 21, 2017 | Completed final sign-off Nov 2018 | 84 Harriet St | revision to pa #2016-0908-7148 - replace (e) wood rear existin stairway in kind. n/a ordinance #155-13Details
revision to pa #2016-0908-7148 - replace (e) wood rear existin stairway in kind. n/a ordinance #155-13 | $9,000 | |
| Dec 5, 2016 | Completed final sign-off Oct 2017 | 149 Masonic Av | N K Building Construction Group Inc. | interior remodel gr fl: remove elevator, reconfig storage area and add bathroom, remove columns. 2nd fl remove elevator, kitchen & bath remodel, add 1.5 baths. replace windows skylights.3rd fl remodel kitchen and bath add 1.5 baths, replace windows and skylightsDetails
interior remodel gr fl: remove elevator, reconfig storage area and add bathroom, remove columns. 2nd fl remove elevator, kitchen & bath remodel, add 1.5 baths. replace windows skylights.3rd fl remodel kitchen and bath add 1.5 baths, replace windows and skylights | $100,000 |
| Jun 7, 2016 | Completed final sign-off Aug 2017 | 142 Sanchez St | remodel of kitchen and 2 baths, removal of masonry chimney, reconfiguration of interior partitions,addition of skylights; maher n/aDetails
remodel of kitchen and 2 baths, removal of masonry chimney, reconfiguration of interior partitions,addition of skylights; maher n/a | $50,000 | |
| Jan 8, 2016 | Completed final sign-off Nov 2018 | 84 Harriet St | legalize ground floor dwelling unit per ord43-14;relocate entry door,add interior stair &landing,add nfpa-13 sprinkler system &1-hr rated floor/ceiling constr @ground flr,remodel kitchen & bathrm,infill/reconfigure openings along south&north courts,add openings to sw corner;sprinkers per nfpa 13 andDetails
legalize ground floor dwelling unit per ord43-14;relocate entry door,add interior stair &landing,add nfpa-13 sprinkler system &1-hr rated floor/ceiling constr @ground flr,remodel kitchen & bathrm,infill/reconfigure openings along south&north courts,add openings to sw corner;sprinkers per nfpa 13 and | $30,000 | |
| Oct 22, 2015 | Completed final sign-off Jul 2019 | 1238 47th Av | create penthouse stair enclosure, add privacy screening at roof deck + hot tub w/wind screen + fireplace, add rear balcony @ 1st level,sliding door + folding door @ rear, add canopies @ ground, 1st +2nd flr front entry/ deck. infill guardrails @frontDetails
create penthouse stair enclosure, add privacy screening at roof deck + hot tub w/wind screen + fireplace, add rear balcony @ 1st level,sliding door + folding door @ rear, add canopies @ ground, 1st +2nd flr front entry/ deck. infill guardrails @front | $50,000 | |
| Jul 28, 2015 | Completed final sign-off Feb 2016 | 197 Lower Tr | Houseworks Enterprises Inc. | revision to pa#201506189306, interior remodel, reconfigure interior walls, add closets, replace fixtures, alter window openings (infill 1 window & dcrease size of 3), replace furnace.Details
revision to pa#201506189306, interior remodel, reconfigure interior walls, add closets, replace fixtures, alter window openings (infill 1 window & dcrease size of 3), replace furnace. | $10,000 |
| May 1, 2015 | Completed final sign-off Apr 2016 | 98 Broderick St | revision to pa#201410098548- reconfigure interior walls, add bathroom to 991 haight street.Details
revision to pa#201410098548- reconfigure interior walls, add bathroom to 991 haight street. | $10,000 | |
| Oct 9, 2014 | Completed final sign-off Apr 2016 | 98 Broderick St | remodel 3 of 4 units. structural work in 4th unit and basement. remodel 3 ktichens, remodel 3 baths, add 1 1/2 baths, reconfigure interior partitions, 2 new furnaces and 3 new water heaters. no change to exteriorDetails
remodel 3 of 4 units. structural work in 4th unit and basement. remodel 3 ktichens, remodel 3 baths, add 1 1/2 baths, reconfigure interior partitions, 2 new furnaces and 3 new water heaters. no change to exterior | $75,000 | |
| Jun 20, 2014 | Completed final sign-off Mar 2016 | 98 Broderick St | add 3 skylights to roof as revision to pa# 201403100325Details
add 3 skylights to roof as revision to pa# 201403100325 | $1,500 | |
| Mar 10, 2014 | Completed final sign-off Apr 2016 | 98 Broderick St | #4- repair front and side stairways(less than 50%) per nov #200919421 items 1 and 3. guardrail at front and landing at side stairs. new attic access hatch with drop down ladder. infill extg hatch. add skylight in roof between extg rafters. not to be used for storage. jjc. sffdDetails
#4- repair front and side stairways(less than 50%) per nov #200919421 items 1 and 3. guardrail at front and landing at side stairs. new attic access hatch with drop down ladder. infill extg hatch. add skylight in roof between extg rafters. not to be used for storage. jjc. sffd | $5,000 | |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 537 Jersey St | convert ground floor garage space into recreation room, enclose utility room, add 1/2 bathroom, add laundry sink, relocate (e) washer & dryer, add window & door @ ext walls, add 1-hr fire wall between garage & habitable space.Details
convert ground floor garage space into recreation room, enclose utility room, add 1/2 bathroom, add laundry sink, relocate (e) washer & dryer, add window & door @ ext walls, add 1-hr fire wall between garage & habitable space. | $20,000 | |
| Oct 26, 2011 | Expired or cancelled cancelled Sep 2026 | 4788 Mission St | Itu Construction | add a deli counter to an existing retail grocery facility including associates improvements to meet the enviromental health requirements; new storefront enclosure, upgrades to existing bathroom, flooring, wall finishes, food prep area plus mechanical ventilation and lighting.Details
add a deli counter to an existing retail grocery facility including associates improvements to meet the enviromental health requirements; new storefront enclosure, upgrades to existing bathroom, flooring, wall finishes, food prep area plus mechanical ventilation and lighting. | $20,000 |
| Aug 30, 2010 | Completed final sign-off Jul 2014 | 352 Richland Av | reconfigure front entry porch, bedroom & living room at ground floor into enclosed mudroom, enlarged foyer & 2 bedrooms. enlarge kitchen & dining area, convert attic into habitable space, add conecting stair to attic & basement.Details
reconfigure front entry porch, bedroom & living room at ground floor into enclosed mudroom, enlarged foyer & 2 bedrooms. enlarge kitchen & dining area, convert attic into habitable space, add conecting stair to attic & basement. | $100,000 | |
| Jan 27, 2009 | Completed final sign-off May 2009 | 39 Topeka Av | Iturralde Construction Co | legalize 3 existing rooms & one bathroom in garage space, includes addition of building to comply w/ nov 200884522. electrical/plumbing on separate permit.Details
legalize 3 existing rooms & one bathroom in garage space, includes addition of building to comply w/ nov 200884522. electrical/plumbing on separate permit. | $7,000 |
| Dec 10, 2007 | Expired or cancelled expired Sep 2010 | 442 Lyon St | addition of a wood rear deck. extension totalling 88 sf plus access stair. bid-200717116.Details
addition of a wood rear deck. extension totalling 88 sf plus access stair. bid-200717116. | $5,000 | |
| Aug 21, 2007 | Completed final sign-off Feb 2008 | 1910 Golden Gate Av | Peak General Contractors Inc | replacement in kind windows (wood) and siding(wood); add decorative and architectural details to front facade of the building.Details
replacement in kind windows (wood) and siding(wood); add decorative and architectural details to front facade of the building. | $10,000 |