Elisha Mayost
- Based in
- San Rafael
- On San Francisco permits
- Mar 2007 to Mar 2026
- Last 24 months
- 8 permits filed
109 permits since 2000: 95 completed, 6 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | In progress issued Jun 2026 | 286 Eureka St | rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire ratedDetails
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire rated | $240,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 286 Eureka St | revision to (e) pa#2025-0603-7801 move the wall in the garage supporting the landing about 6" for extra room.Details
revision to (e) pa#2025-0603-7801 move the wall in the garage supporting the landing about 6" for extra room. | $5,000 |
| Aug 28, 2025 | In progress issued Aug 2025 | 286 Eureka St | demo of existing brick fire place and replace with new insert gas fireplace. fireplace install by energy house.Details
demo of existing brick fire place and replace with new insert gas fireplace. fireplace install by energy house. | $17,000 |
| Jul 30, 2025 | Expired or cancelled suspend Sep 2025 | 286 Eureka St | upgrade (e) front windows to (n) windows within (e) rough opening w/lower sill; (n) window @ rearDetails
upgrade (e) front windows to (n) windows within (e) rough opening w/lower sill; (n) window @ rear | $3,000 |
| Jun 23, 2025 | In progress issued Jun 2025 | 3870 21st St | common area work: replacement of (e) broken slab @ garage w/ new 5" slab. replacement in kind of (e) slab. work not visible from street.Details
common area work: replacement of (e) broken slab @ garage w/ new 5" slab. replacement in kind of (e) slab. work not visible from street. | $12,000 |
| Jun 3, 2025 | In progress issued Jul 2025 | 286 Eureka St | foundation replacement. replace the existing brick foundation with new concrete foundation. replace raised floor framing with concrete slab on grade. revise storage areas. close existing door on the front elevation. all work on the ground floor.Details
foundation replacement. replace the existing brick foundation with new concrete foundation. replace raised floor framing with concrete slab on grade. revise storage areas. close existing door on the front elevation. all work on the ground floor. | $125,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 460 Fillmore St | unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms.Details
unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms. | $110,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 286 Eureka St | bathroom remodel: new tub, new toilet, new vanity and new tile.Details
bathroom remodel: new tub, new toilet, new vanity and new tile. | $25,000 |
| Aug 11, 2023 | Completed final sign-off Feb 2024 | 262 24th Av | replace of wood siding at back of house. new siding to be james hardy siding, new house wrap. new flashing for doors and windows.Details
replace of wood siding at back of house. new siding to be james hardy siding, new house wrap. new flashing for doors and windows. | $18,000 |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 2 Castenada Av | remodel 3rd bathroom on the 1st fl.Details
remodel 3rd bathroom on the 1st fl. | $12,000 |
| Jan 30, 2023 | Completed final sign-off Jun 2023 | 918 Union St | remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations.Details
remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations. | $58,000 |
| Dec 20, 2022 | Never finaled issued Dec 2022, no final | 767 04th Av | emergency permit to address bid nov#202299961 dated 12/6/2022. replace areas of structure @ front of building damaged after car drove into buildingDetails
emergency permit to address bid nov#202299961 dated 12/6/2022. replace areas of structure @ front of building damaged after car drove into building | $15,000 |
| Aug 9, 2022 | Completed final sign-off Aug 2022 | 20 Elsie St | to obtain final inspection for work approved under pa# 2017-0522-7242 and 2019-0913-1568. all work is complete.Details
to obtain final inspection for work approved under pa# 2017-0522-7242 and 2019-0913-1568. all work is complete. | |
| Jun 21, 2022 | Completed final sign-off Sep 2023 | 2 Castenada Av | new bath and bathroom remodel on 3rd flDetails
new bath and bathroom remodel on 3rd fl | $30,000 |
| Apr 20, 2022 | Completed final sign-off May 2024 | 937 Haight St | revision to pa# 202109027725. revise 2nd fl layout. replace section of (e) foundation. add slab on grade.Details
revision to pa# 202109027725. revise 2nd fl layout. replace section of (e) foundation. add slab on grade. | $38,000 |
| Dec 27, 2021 | Completed final sign-off Jan 2022 | 252 Hermann St | renew expired permit #201808147272 for final inspection.Details
renew expired permit #201808147272 for final inspection. | |
| Oct 15, 2021 | Completed final sign-off Sep 2023 | 101 Crestmont Dr | rev to pa202108035664: correction notice adding drilled piers at rear of property in improve foundation & add sliding support.Details
rev to pa202108035664: correction notice adding drilled piers at rear of property in improve foundation & add sliding support. | $15,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2023 | 1646 Lyon St | rev to pa 2016-0803-4070: upper deck repair/replacement at 2nd fl. due to structural deficiencies and (e) dry rot discovered during construction of work under pa#2016-0803-0470Details
rev to pa 2016-0803-4070: upper deck repair/replacement at 2nd fl. due to structural deficiencies and (e) dry rot discovered during construction of work under pa#2016-0803-0470 | |
| Sep 2, 2021 | Completed final sign-off May 2024 | 937 Haight St | unit 1,2,4: entire interior floor remodel.Details
unit 1,2,4: entire interior floor remodel. | $220,000 |
| Aug 3, 2021 | Completed final sign-off Sep 2023 | 101 Crestmont Dr | structural upgrades add structural braces at rbar unbraced concreted columns. framing upgrades at rear decks.replace (e) entry stairs in-kind.Details
structural upgrades add structural braces at rbar unbraced concreted columns. framing upgrades at rear decks.replace (e) entry stairs in-kind. | $65,000 |
| Jul 20, 2021 | Completed final sign-off Oct 2022 | 235 Laidley St | rev to pa 201902213443 facade no finish changes.Details
rev to pa 201902213443 facade no finish changes. | |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2275 47th Av | house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywallDetails
house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywall | $60,000 |
| Jan 10, 2020 | Completed final sign-off Dec 2023 | 1646 Lyon St | rev to pa# 201608034070; elevation revision to permit set. swithching out proposed doors & windows for different doors and windowsDetails
rev to pa# 201608034070; elevation revision to permit set. swithching out proposed doors & windows for different doors and windows | |
| Nov 26, 2019 | Completed final sign-off Dec 2019 | 138 23rd Av | revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.).Details
revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.). | |
| Sep 13, 2019 | Expired or cancelled expired Aug 2022 | 20 Elsie St | revision to pa 201705227242, structural revision to concrete slabDetails
revision to pa 201705227242, structural revision to concrete slab | |
| Aug 29, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | the proposed revision ("delta 6") to approved permit #2018-0419-6759 reduces the size of the proposed lightwell at the ground floor only. shear wall @ 1st floor shifted from grid 3.2 to 3 and w8x steel beam added aboveDetails
the proposed revision ("delta 6") to approved permit #2018-0419-6759 reduces the size of the proposed lightwell at the ground floor only. shear wall @ 1st floor shifted from grid 3.2 to 3 and w8x steel beam added above | $15,000 |
| Jul 1, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | the proposed revision (delta 7) to approved pa# 201804196759 includes the enclosing of an exterior roof deck at the rear of the structure 3/f. this change will add 87 sq ft to the total conditiioned area of the house.Details
the proposed revision (delta 7) to approved pa# 201804196759 includes the enclosing of an exterior roof deck at the rear of the structure 3/f. this change will add 87 sq ft to the total conditiioned area of the house. | $20,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | revision to pa 201902213443. foundation revisionDetails
revision to pa 201902213443. foundation revision | $5,000 |
| Jun 6, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | revision (delta 6) to 201804196759. new work includes revised foundation detail for portions of wall along south prop line changing approved continous pour to an a-b-c staggered pourDetails
revision (delta 6) to 201804196759. new work includes revised foundation detail for portions of wall along south prop line changing approved continous pour to an a-b-c staggered pour | $2,500 |
| Feb 21, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entryDetails
renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entry | $180,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2019 | 126 Museum Wy | revision to 201705187051 revise drainage details. replace (e) posts for constructability purposesDetails
revision to 201705187051 revise drainage details. replace (e) posts for constructability purposes | |
| Apr 19, 2018 | Completed final sign-off Apr 2023 | 59 Potomac St | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim.Details
3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim. | $671,500 |
| Mar 5, 2018 | Completed final sign-off Dec 2018 | 24 Elsie St | relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck.Details
relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck. | $75,000 |
| Nov 10, 2017 | Completed final sign-off Mar 2018 | 3912 Folsom St | master bathroom remodel. relocate 2 windows at back wallDetails
master bathroom remodel. relocate 2 windows at back wall | $25,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2019 | 138 23rd Av | residential alteration & addition including voluntary seismic upgradesDetails
residential alteration & addition including voluntary seismic upgrades | $100,000 |
| Aug 8, 2017 | Completed final sign-off Oct 2017 | 1480 Fulton St | bathroom remodel. new tub, toilet, shower valve, vanity and one ceiling light.Details
bathroom remodel. new tub, toilet, shower valve, vanity and one ceiling light. | $15,000 |
| May 22, 2017 | Expired or cancelled expired Aug 2022 | 20 Elsie St | 250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavationDetails
250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavation | $185,000 |
| Aug 3, 2016 | Completed final sign-off Dec 2023 | 1646 Lyon St | convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft.Details
convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft. | $150,000 |
| Apr 6, 2016 | Completed final sign-off Jun 2017 | 262 24th Av | revision to app#201601207430 - scope of work for this revision is to remove extg unconnected sprinkler system.Details
revision to app#201601207430 - scope of work for this revision is to remove extg unconnected sprinkler system. | |
| Mar 10, 2016 | Completed final sign-off Jun 2017 | 262 24th Av | scope of work includes replacement of wood (e) windows at front facade in kind. garage door & new awning. enlarge (e) wood windows at front facade in kind.Details
scope of work includes replacement of wood (e) windows at front facade in kind. garage door & new awning. enlarge (e) wood windows at front facade in kind. | $1,000 |
| Jan 20, 2016 | Completed final sign-off Jun 2017 | 262 24th Av | scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec,Details
scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec, | $395,729 |
| Oct 29, 2015 | Completed final sign-off Dec 2015 | 1328 Greenwich St | dry rot repair - replace 8 stairs in kind, less than 50% - front exterior entry stairs.Details
dry rot repair - replace 8 stairs in kind, less than 50% - front exterior entry stairs. | $10,000 |
| Sep 16, 2015 | Completed final sign-off Jun 2016 | 1951 Turk St | revision to pa#201506179149 for underpinning of west wall foundation.Details
revision to pa#201506179149 for underpinning of west wall foundation. | |
| Aug 14, 2015 | Completed final sign-off Sep 2015 | 507 Moultrie St | removal of dry wall from ceiling in 2 bedroom bathroom and hall. new 2 layer of drywall @ ceiling on rc channel at 2 bedroom bathroom and hallDetails
removal of dry wall from ceiling in 2 bedroom bathroom and hall. new 2 layer of drywall @ ceiling on rc channel at 2 bedroom bathroom and hall | $10,000 |
| Jul 14, 2015 | Completed final sign-off Jan 2016 | 2114 Divisadero St | kitchen remodel, 1/2 bath remodel, new master bath, new laundry.Details
kitchen remodel, 1/2 bath remodel, new master bath, new laundry. | $85,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 1951 Turk St | 390 sq ft new conditioned space in basement level. new 1/2 bath, replace exterior concrete stairsDetails
390 sq ft new conditioned space in basement level. new 1/2 bath, replace exterior concrete stairs | $180,000 |
| Oct 31, 2014 | Completed final sign-off Nov 2014 | 100 Garcia Av | to obtain final inspection for work approved under pa# 200606093636.Details
to obtain final inspection for work approved under pa# 200606093636. | $45,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2015 | 1501 06th Av | interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms.Details
interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms. | $50,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 2856 Scott St | # 3 - replace kitchen cabinet new countertop, new lighting are all "led" @ kitchen, elec update, kitchen remodle throughout. n/a maher ordinanceDetails
# 3 - replace kitchen cabinet new countertop, new lighting are all "led" @ kitchen, elec update, kitchen remodle throughout. n/a maher ordinance | $15,000 |
| Aug 7, 2014 | Completed final sign-off Jul 2015 | 100 Garcia Av | revision to app#201405125466. removal of proposed half bath at entry, changes in bar area wall and structural changes.Details
revision to app#201405125466. removal of proposed half bath at entry, changes in bar area wall and structural changes. | |
| Jul 23, 2014 | Completed final sign-off Nov 2014 | 3537 Pierce St | demo existing drywall (sheetrock only), install of insulation and resilent channels. install two layers of 5/8" type x gypsum board and four (fluorescent) recessed lights on ceiling. all work will be located inside the bedroom @ rear of bldg. no existing wall relocation. n/a to ordinance #155-13Details
demo existing drywall (sheetrock only), install of insulation and resilent channels. install two layers of 5/8" type x gypsum board and four (fluorescent) recessed lights on ceiling. all work will be located inside the bedroom @ rear of bldg. no existing wall relocation. n/a to ordinance #155-13 | $10,000 |
| May 12, 2014 | Completed final sign-off Nov 2014 | 100 Garcia Av | renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylightsDetails
renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylights | $75,000 |
| May 8, 2014 | Completed final sign-off Sep 2014 | 307 Chattanooga St | interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage.Details
interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage. | $75,000 |
| Mar 26, 2014 | Completed final sign-off Jun 2014 | 3324 Octavia St | replace tub with shower, new tile, new sink and toilet. run 20amp for the bathroom.Details
replace tub with shower, new tile, new sink and toilet. run 20amp for the bathroom. | $10,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 3732 Sacramento St | renovation of the extg kitchen on 2nd floor, replacement of french doors and windows at breakfast/family room area at rear of house , and reconfiguring 2nd floor powder room.Details
renovation of the extg kitchen on 2nd floor, replacement of french doors and windows at breakfast/family room area at rear of house , and reconfiguring 2nd floor powder room. | $15,000 |
| Feb 4, 2014 | Completed final sign-off Mar 2014 | 4077 23rd St | removal of finish drywalls from ceiling in the apartment except the bathroom. new 2 layers of 5/8" type x dry wall on rc channel of insulationDetails
removal of finish drywalls from ceiling in the apartment except the bathroom. new 2 layers of 5/8" type x dry wall on rc channel of insulation | $15,000 |
| Feb 4, 2014 | Completed final sign-off May 2014 | 1480 Fulton St | kitchen remodel -new cabinet, new counter top and paint.Details
kitchen remodel -new cabinet, new counter top and paint. | $18,000 |
| Jan 28, 2014 | Completed final sign-off May 2014 | 2864 Sacramento St | bathroom remodel new tub, new shower pan, new tile; compliance with ord 155-13 not requiredDetails
bathroom remodel new tub, new shower pan, new tile; compliance with ord 155-13 not required | $12,000 |
| Jan 28, 2014 | Completed final sign-off Feb 2014 | 1895 Pacific Av | removal of finish from ceiling; install new drywall and layer on r.c. chanel 5/8" ty pg" in bedroom and hallwayDetails
removal of finish from ceiling; install new drywall and layer on r.c. chanel 5/8" ty pg" in bedroom and hallway | $7,000 |
| Jan 14, 2014 | Completed final sign-off Feb 2014 | 3537 Pierce St | removal of finishes (drywalls) from walls and ceilig in master bedroom, new 2 layers of 5/8" typ x drywalls on rc chanell in walls and ceiling, new insulationDetails
removal of finishes (drywalls) from walls and ceilig in master bedroom, new 2 layers of 5/8" typ x drywalls on rc chanell in walls and ceiling, new insulation | $12,000 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 2039 Sacramento St | removal of finish drywalls from ceiling in kitchen living room, dining room and hallway. install new gypsm 2 layer of 5/8" type x on r-c chanell, putting insulation.Details
removal of finish drywalls from ceiling in kitchen living room, dining room and hallway. install new gypsm 2 layer of 5/8" type x on r-c chanell, putting insulation. | $15,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2014 | 3324 Octavia St | unit 1 - kitchen and bathroom remodel. update of electricalDetails
unit 1 - kitchen and bathroom remodel. update of electrical | $30,000 |
| Aug 26, 2013 | Completed final sign-off Nov 2013 | 2856 Scott St | apt 3: bathroom remodel, remove tile toilet vanity, replace in same location. new tile, new toilet, new shower pan. new light, no structural work.Details
apt 3: bathroom remodel, remove tile toilet vanity, replace in same location. new tile, new toilet, new shower pan. new light, no structural work. | $11,000 |
| Aug 6, 2013 | Completed final sign-off Aug 2013 | 201 03rd St | work in suite 1200: putting a new layer of drywall on top of (e) 2 walls. finish walls and paint.Details
work in suite 1200: putting a new layer of drywall on top of (e) 2 walls. finish walls and paint. | $5,000 |
| Jul 17, 2013 | Completed final sign-off Aug 2013 | 4475 24th St | demolish existing stairs and landing and replace with new one.some foundation landing work, three steps with 3 landings. for common area.Details
demolish existing stairs and landing and replace with new one.some foundation landing work, three steps with 3 landings. for common area. | $10,000 |
| Jun 14, 2013 | Completed final sign-off Dec 2013 | 1524 Mason St | install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop.Details
install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop. | $20,000 |
| Apr 18, 2013 | Completed final sign-off Sep 2013 | 3563 Sacramento St | removal of drywall, new drywall with insulation, new circulating pump running extra duct for bathroom. no change for (e) furnace, new lights in closet.Details
removal of drywall, new drywall with insulation, new circulating pump running extra duct for bathroom. no change for (e) furnace, new lights in closet. | $14,000 |
| Apr 11, 2013 | Completed final sign-off May 2013 | 690 Chestnut St | work in unit #101: kitchen remodel. removal of old cabinet installed new cabinet. new countertop, new light. replace in kind.Details
work in unit #101: kitchen remodel. removal of old cabinet installed new cabinet. new countertop, new light. replace in kind. | $14,000 |
| Mar 21, 2013 | Completed final sign-off May 2013 | 820 Urbano Dr | kitchen remodel, new cabinet and electrical upgrade.Details
kitchen remodel, new cabinet and electrical upgrade. | $13,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2013 | 1730 Broderick St | kitchen remodel - removal of cabinet, new gas line, new cabinet. electrical update of kitchen.Details
kitchen remodel - removal of cabinet, new gas line, new cabinet. electrical update of kitchen. | $12,000 |
| Dec 5, 2012 | Completed final sign-off Jan 2013 | 1730 Broderick St | unit #12 - 1 kitchen remodel - bew cabinet, electrical update, plumbing update, lighting to comply wityh cec 150(k)Details
unit #12 - 1 kitchen remodel - bew cabinet, electrical update, plumbing update, lighting to comply wityh cec 150(k) | $10,000 |
| Nov 26, 2012 | Completed final sign-off Dec 2012 | 129 Collingwood St | removal of ceiling finish sound proof the ceiling& install new 2 layer of 5/8" type x on ceiling @ hallway & one bedroom in kind (n) insulation dennem.Details
removal of ceiling finish sound proof the ceiling& install new 2 layer of 5/8" type x on ceiling @ hallway & one bedroom in kind (n) insulation dennem. | $8,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 3870 21st St | kitchen remodel, removal of wall, electrical and plumbing work, new kitchen cabinet.Details
kitchen remodel, removal of wall, electrical and plumbing work, new kitchen cabinet. | $16,000 |
| Sep 11, 2012 | Completed final sign-off Sep 2012 | 144 Buena Vista Tr | removal of dry wall from ceiling, new insulation and 2 layor of 5/8" type "x" on r-c chanel.Details
removal of dry wall from ceiling, new insulation and 2 layor of 5/8" type "x" on r-c chanel. | $10,000 |
| Mar 28, 2012 | Completed final sign-off Jul 2012 | 25 Lucerne St | unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rmDetails
unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rm | $25,000 |
| Mar 19, 2012 | Completed final sign-off May 2012 | 1128 Pine St | kitchen remodel new cabinet update electrical relocate stove, no structural workDetails
kitchen remodel new cabinet update electrical relocate stove, no structural work | $12,000 |
| Feb 7, 2012 | Completed final sign-off Sep 2014 | 68 Macondray Ln | unit #3: to obtain final inspection for work approved under pa 200910058302; all work is completeDetails
unit #3: to obtain final inspection for work approved under pa 200910058302; all work is complete | |
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 68 Macondray Ln | unit #2: to obtain final inspection for work approved under pa 200807106434; all work is completeDetails
unit #2: to obtain final inspection for work approved under pa 200807106434; all work is complete | |
| Feb 7, 2012 | Completed final sign-off Feb 2012 | 68 Macondray Ln | unit #1: to obtain final inspection for work approved under pa 200809262794; all work is completeDetails
unit #1: to obtain final inspection for work approved under pa 200809262794; all work is complete | |
| Aug 15, 2011 | Completed final sign-off Dec 2011 | 50 Lansing St | unit #805:remodel of 2 bathrooms. new lighting in bedroom, new closet.Details
unit #805:remodel of 2 bathrooms. new lighting in bedroom, new closet. | $12,000 |
| Jul 1, 2011 | Completed final sign-off Nov 2011 | 1132 Pine St | work on top unit only - new partition, door, electrical work, furnace replacement.Details
work on top unit only - new partition, door, electrical work, furnace replacement. | $20,000 |
| Jul 1, 2011 | Completed final sign-off Jul 2011 | 542 Fell St | replace 2 windows with in kind, visible from street.Details
replace 2 windows with in kind, visible from street. | $3,000 |
| Jun 24, 2011 | Completed final sign-off Jan 2012 | 44 Macondray Ln | remove portion of non structural wall. appliance relocation. no new light. no change to window & doors.Details
remove portion of non structural wall. appliance relocation. no new light. no change to window & doors. | $2,500 |
| Jun 24, 2011 | Completed final sign-off Feb 2012 | 68 Macondray Ln | rev to pa# 201006214922 issued. remove all walls ceiling finish in unit #3, replace w/ new insulation and gypsum; change orig scope of work to in-fill only 1 window instead of 2. repl 3 existing windows with new.Details
rev to pa# 201006214922 issued. remove all walls ceiling finish in unit #3, replace w/ new insulation and gypsum; change orig scope of work to in-fill only 1 window instead of 2. repl 3 existing windows with new. | $18,000 |
| May 25, 2011 | Completed final sign-off Sep 2011 | 25 Lucerne St | relocate existing interior exit door. install non-rated non-load bearing partition. tnstall new swinging door. relocate existing power outlet and light switch/dimmer. install new light switch/ dimmer. install new power outlet & new light fixture.Details
relocate existing interior exit door. install non-rated non-load bearing partition. tnstall new swinging door. relocate existing power outlet and light switch/dimmer. install new light switch/ dimmer. install new power outlet & new light fixture. | $7,000 |
| May 6, 2011 | Completed final sign-off Jan 2012 | 68 Macondray Ln | bath remodel and tankless water heater, new kitchen cabinetsDetails
bath remodel and tankless water heater, new kitchen cabinets | $8,000 |
| Mar 14, 2011 | Completed final sign-off May 2011 | 3732 Sacramento St | bathroom remodel & adding of dryer and washer all work on 2nd floor, high efficacy lighting or occupancy sensor; dryer exhaust on sidewall terminate 3 min from pl and bldg openings, length limitation 14' maxDetails
bathroom remodel & adding of dryer and washer all work on 2nd floor, high efficacy lighting or occupancy sensor; dryer exhaust on sidewall terminate 3 min from pl and bldg openings, length limitation 14' max | $15,000 |
| Nov 16, 2010 | Expired or cancelled expired Aug 2012 | 922 Union St | new 500 sq ft rooftop deck w/ access 2 gates for emergency access and egress (sffd).Details
new 500 sq ft rooftop deck w/ access 2 gates for emergency access and egress (sffd). | $10,000 |
| Oct 28, 2010 | Completed final sign-off Mar 2011 | 922 Union St | revision to appl #201006164600: reduction in scope - omit bathroom addition, omit wall removal & therefore structural work, add shower at existing bath.Details
revision to appl #201006164600: reduction in scope - omit bathroom addition, omit wall removal & therefore structural work, add shower at existing bath. | |
| Sep 15, 2010 | Expired or cancelled withdrawn Dec 2010 | 1953 Turk St | revision to pa# 2009/07/14/2608. move (e) skylight to comply with property line requirement. add 1 addition skylight over stair addition. widen new exterior door to 3 feet. expand addition for new door. expand stair penthouse 3'.Details
revision to pa# 2009/07/14/2608. move (e) skylight to comply with property line requirement. add 1 addition skylight over stair addition. widen new exterior door to 3 feet. expand addition for new door. expand stair penthouse 3'. | $200 |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 42 Winfield St | bathroom remodel. removal of shower, new bathtub instead, tile of tub area and floor. replace existing outlets with gfi and occupancy sensor switch.Details
bathroom remodel. removal of shower, new bathtub instead, tile of tub area and floor. replace existing outlets with gfi and occupancy sensor switch. | $5,000 |
| Jun 21, 2010 | Completed final sign-off Feb 2012 | 68 Macondray Ln | construct (n) front entry & (n) front door. unit count verrification p.a. #200910058302 must be completed prior to final this permit.Details
construct (n) front entry & (n) front door. unit count verrification p.a. #200910058302 must be completed prior to final this permit. | $4,000 |
| Apr 26, 2010 | Completed final sign-off Jul 2010 | 349 Urbano Dr | removal of bathtub, shower, tile. new shower,tile. add 2 lights and 1 outlet.Details
removal of bathtub, shower, tile. new shower,tile. add 2 lights and 1 outlet. | $5,000 |
| Jan 19, 2010 | Completed final sign-off Aug 2010 | 26 Yukon St | change 1st floor living room to master bedroom suite, construct new master bathroom & walk-in closet at 1st floor, master bedroom suite (garage level)Details
change 1st floor living room to master bedroom suite, construct new master bathroom & walk-in closet at 1st floor, master bedroom suite (garage level) | $4,200 |
| Dec 8, 2009 | Completed final sign-off Aug 2010 | 26 Yukon St | remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facadeDetails
remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facade | $107,000 |
| Sep 22, 2009 | Completed final sign-off Nov 2009 | 240 Liberty St | kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom.Details
kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom. | $14,000 |
| Aug 19, 2009 | Completed final sign-off Sep 2009 | 68 San Gabriel Av | bathroom remodel, new shawer valve, new tile walls and floor, new water heater in same loction (garage) raise 18" and provide sciesmic strap.Details
bathroom remodel, new shawer valve, new tile walls and floor, new water heater in same loction (garage) raise 18" and provide sciesmic strap. | $10,000 |
| Aug 13, 2009 | Completed final sign-off Aug 2009 | 1230 21st Av | repair back stair less than 49% and front stucco repair.Details
repair back stair less than 49% and front stucco repair. | $2,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2010 | 1953 Turk St | new interior stair, new finishes and skylights at attic, new stair to new deck @ roof.Details
new interior stair, new finishes and skylights at attic, new stair to new deck @ roof. | $40,000 |
| Jun 3, 2009 | Completed final sign-off Aug 2009 | 27 Latona St | replace existing stairs per inspector request. report # cc-5497. bldg record a/p 273059.Details
replace existing stairs per inspector request. report # cc-5497. bldg record a/p 273059. | $2,000 |