Back to kitchen remodel contractors
Elisha Mayost
- Based in
- San Rafael
- On San Francisco permits
- Mar 2007 to Mar 2026
- Last 24 months
- 8 permits filed
109 permits since 2000: 95 completed, 6 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 31 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | In progress issued Jun 2026 | 286 Eureka St | rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire ratedDetails
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire rated | $240,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 460 Fillmore St | unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms.Details
unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms. | $110,000 |
| Jan 30, 2023 | Completed final sign-off Jun 2023 | 918 Union St | remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations.Details
remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations. | $58,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2275 47th Av | house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywallDetails
house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywall | $60,000 |
| Feb 21, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entryDetails
renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entry | $180,000 |
| Apr 19, 2018 | Completed final sign-off Apr 2023 | 59 Potomac St | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim.Details
3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim. | $671,500 |
| May 22, 2017 | Expired or cancelled expired Aug 2022 | 20 Elsie St | 250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavationDetails
250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavation | $185,000 |
| Aug 3, 2016 | Completed final sign-off Dec 2023 | 1646 Lyon St | convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft.Details
convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft. | $150,000 |
| Jan 20, 2016 | Completed final sign-off Jun 2017 | 262 24th Av | scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec,Details
scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec, | $395,729 |
| Jul 14, 2015 | Completed final sign-off Jan 2016 | 2114 Divisadero St | kitchen remodel, 1/2 bath remodel, new master bath, new laundry.Details
kitchen remodel, 1/2 bath remodel, new master bath, new laundry. | $85,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2015 | 1501 06th Av | interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms.Details
interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms. | $50,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 2856 Scott St | # 3 - replace kitchen cabinet new countertop, new lighting are all "led" @ kitchen, elec update, kitchen remodle throughout. n/a maher ordinanceDetails
# 3 - replace kitchen cabinet new countertop, new lighting are all "led" @ kitchen, elec update, kitchen remodle throughout. n/a maher ordinance | $15,000 |
| May 12, 2014 | Completed final sign-off Nov 2014 | 100 Garcia Av | renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylightsDetails
renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylights | $75,000 |
| May 8, 2014 | Completed final sign-off Sep 2014 | 307 Chattanooga St | interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage.Details
interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage. | $75,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 3732 Sacramento St | renovation of the extg kitchen on 2nd floor, replacement of french doors and windows at breakfast/family room area at rear of house , and reconfiguring 2nd floor powder room.Details
renovation of the extg kitchen on 2nd floor, replacement of french doors and windows at breakfast/family room area at rear of house , and reconfiguring 2nd floor powder room. | $15,000 |
| Feb 4, 2014 | Completed final sign-off May 2014 | 1480 Fulton St | kitchen remodel -new cabinet, new counter top and paint.Details
kitchen remodel -new cabinet, new counter top and paint. | $18,000 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 2039 Sacramento St | removal of finish drywalls from ceiling in kitchen living room, dining room and hallway. install new gypsm 2 layer of 5/8" type x on r-c chanell, putting insulation.Details
removal of finish drywalls from ceiling in kitchen living room, dining room and hallway. install new gypsm 2 layer of 5/8" type x on r-c chanell, putting insulation. | $15,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2014 | 3324 Octavia St | unit 1 - kitchen and bathroom remodel. update of electricalDetails
unit 1 - kitchen and bathroom remodel. update of electrical | $30,000 |
| Jun 14, 2013 | Completed final sign-off Dec 2013 | 1524 Mason St | install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop.Details
install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop. | $20,000 |
| Apr 11, 2013 | Completed final sign-off May 2013 | 690 Chestnut St | work in unit #101: kitchen remodel. removal of old cabinet installed new cabinet. new countertop, new light. replace in kind.Details
work in unit #101: kitchen remodel. removal of old cabinet installed new cabinet. new countertop, new light. replace in kind. | $14,000 |
| Mar 21, 2013 | Completed final sign-off May 2013 | 820 Urbano Dr | kitchen remodel, new cabinet and electrical upgrade.Details
kitchen remodel, new cabinet and electrical upgrade. | $13,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2013 | 1730 Broderick St | kitchen remodel - removal of cabinet, new gas line, new cabinet. electrical update of kitchen.Details
kitchen remodel - removal of cabinet, new gas line, new cabinet. electrical update of kitchen. | $12,000 |
| Dec 5, 2012 | Completed final sign-off Jan 2013 | 1730 Broderick St | unit #12 - 1 kitchen remodel - bew cabinet, electrical update, plumbing update, lighting to comply wityh cec 150(k)Details
unit #12 - 1 kitchen remodel - bew cabinet, electrical update, plumbing update, lighting to comply wityh cec 150(k) | $10,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 3870 21st St | kitchen remodel, removal of wall, electrical and plumbing work, new kitchen cabinet.Details
kitchen remodel, removal of wall, electrical and plumbing work, new kitchen cabinet. | $16,000 |
| Mar 28, 2012 | Completed final sign-off Jul 2012 | 25 Lucerne St | unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rmDetails
unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rm | $25,000 |
| Mar 19, 2012 | Completed final sign-off May 2012 | 1128 Pine St | kitchen remodel new cabinet update electrical relocate stove, no structural workDetails
kitchen remodel new cabinet update electrical relocate stove, no structural work | $12,000 |
| May 6, 2011 | Completed final sign-off Jan 2012 | 68 Macondray Ln | bath remodel and tankless water heater, new kitchen cabinetsDetails
bath remodel and tankless water heater, new kitchen cabinets | $8,000 |
| Dec 8, 2009 | Completed final sign-off Aug 2010 | 26 Yukon St | remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facadeDetails
remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facade | $107,000 |
| Sep 22, 2009 | Completed final sign-off Nov 2009 | 240 Liberty St | kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom.Details
kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom. | $14,000 |
| Apr 17, 2009 | Completed final sign-off Jul 2009 | 135 Buchanan St | legalize use of garagae level storage and bathroom space. provide necessary separations as required by sfbc 406.1.4.(all work to comply & satisfy 3r-5322 report). mitigation of damaged mortar joints at fire places in units 135 & 137. comply w/kitchen range duct requirement at unit 137.Details
legalize use of garagae level storage and bathroom space. provide necessary separations as required by sfbc 406.1.4.(all work to comply & satisfy 3r-5322 report). mitigation of damaged mortar joints at fire places in units 135 & 137. comply w/kitchen range duct requirement at unit 137. | $9,000 |
| Jan 20, 2009 | Completed final sign-off Feb 2009 | 250 Ney St | remodel existing kitchen new lights & new ice maker. ne counter top. new appliances, new cabinet. min 50% of kitchen lighting wattage shall be of fluorescent lights.Details
remodel existing kitchen new lights & new ice maker. ne counter top. new appliances, new cabinet. min 50% of kitchen lighting wattage shall be of fluorescent lights. | $10,600 |
| Oct 7, 2008 | Completed final sign-off Nov 2008 | 408 Waller St | demolition of existing cabinets & pantry, finish walls with new sheetrock, installation of new cabinets, counter, sink, dishwasher, hood with exterior vent, gas range, fridge, paint interior walls, install 6 recessed lights in ceiling. no wall removal. min 50% of kitchen lighting watts must be inDetails
demolition of existing cabinets & pantry, finish walls with new sheetrock, installation of new cabinets, counter, sink, dishwasher, hood with exterior vent, gas range, fridge, paint interior walls, install 6 recessed lights in ceiling. no wall removal. min 50% of kitchen lighting watts must be in | $36,700 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 235 Dorland St | kitchen remodel. remove two non bearing walls. add laundry area. retile bathroom (no structural work)Details
kitchen remodel. remove two non bearing walls. add laundry area. retile bathroom (no structural work) | $10,000 |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 237 Dorland St | 1 - remodel kitchen, demo wall & install header & posts, 2- retile bath, replace fixtures, install recessed lights, 3- install small sink and recessed lights in toilet room, 4 - install recessed lights in hallway & small study bedroom.all new lights to be fluorescent.Details
1 - remodel kitchen, demo wall & install header & posts, 2- retile bath, replace fixtures, install recessed lights, 3- install small sink and recessed lights in toilet room, 4 - install recessed lights in hallway & small study bedroom.all new lights to be fluorescent. | $15,000 |