Elisha Mayost
- Based in
- San Rafael
- On San Francisco permits
- Mar 2007 to Mar 2026
- Last 24 months
- 8 permits filed
109 permits since 2000: 95 completed, 6 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 7 completed, 1 in progress. Typically 44 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | In progress issued Jun 2026 | 286 Eureka St | rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire ratedDetails
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire rated | $240,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2023 | 1646 Lyon St | rev to pa 2016-0803-4070: upper deck repair/replacement at 2nd fl. due to structural deficiencies and (e) dry rot discovered during construction of work under pa#2016-0803-0470Details
rev to pa 2016-0803-4070: upper deck repair/replacement at 2nd fl. due to structural deficiencies and (e) dry rot discovered during construction of work under pa#2016-0803-0470 | |
| Aug 3, 2021 | Completed final sign-off Sep 2023 | 101 Crestmont Dr | structural upgrades add structural braces at rbar unbraced concreted columns. framing upgrades at rear decks.replace (e) entry stairs in-kind.Details
structural upgrades add structural braces at rbar unbraced concreted columns. framing upgrades at rear decks.replace (e) entry stairs in-kind. | $65,000 |
| Nov 26, 2019 | Completed final sign-off Dec 2019 | 138 23rd Av | revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.).Details
revision to pa#2017-0913-7875: removal of existing unpermitted terrace from 2nd floor (rear). new rear yard deck (less than 30" a.f.f.). | |
| Mar 5, 2018 | Completed final sign-off Dec 2018 | 24 Elsie St | relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck.Details
relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck. | $75,000 |
| Dec 8, 2009 | Completed final sign-off Aug 2010 | 26 Yukon St | remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facadeDetails
remodel of two existing dwelling units; kitchen & bedrooms;new spiral stair to 1st floor; new decks @ rear; new stair to new roof deck; new facade material & new windows @front facade | $107,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2010 | 1953 Turk St | new interior stair, new finishes and skylights at attic, new stair to new deck @ roof.Details
new interior stair, new finishes and skylights at attic, new stair to new deck @ roof. | $40,000 |
| May 1, 2008 | Completed final sign-off Jul 2008 | 56 Majestic Av | construct a new deck and stair at the rear of bldg at 2nd level. (n) door to replace window in rear of building second floorDetails
construct a new deck and stair at the rear of bldg at 2nd level. (n) door to replace window in rear of building second floor | $4,000 |