Back to bathroom remodel contractors
Elisha Mayost
- Based in
- San Rafael
- On San Francisco permits
- Mar 2007 to Mar 2026
- Last 24 months
- 8 permits filed
109 permits since 2000: 95 completed, 6 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 39 completed, 1 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 460 Fillmore St | unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms.Details
unit #3: interior scope only - remodel of (e) kitchen and bathroom. rebuilt kitchen in same location and rebuilt restroom in same location. reconfigured clsoets in primary/guest bedrooms. | $110,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 286 Eureka St | bathroom remodel: new tub, new toilet, new vanity and new tile.Details
bathroom remodel: new tub, new toilet, new vanity and new tile. | $25,000 |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 2 Castenada Av | remodel 3rd bathroom on the 1st fl.Details
remodel 3rd bathroom on the 1st fl. | $12,000 |
| Jan 30, 2023 | Completed final sign-off Jun 2023 | 918 Union St | remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations.Details
remodel (e) kitchen. add sink & exhaust fan in w.c. add light and exhaust fan to (e) bath. raise header in 4 locations. | $58,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2023 | 2 Castenada Av | new bath and bathroom remodel on 3rd flDetails
new bath and bathroom remodel on 3rd fl | $30,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2275 47th Av | house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywallDetails
house has water damage and insurance remove drywall from master nbath, kitchen living rm. laundry, 1/2 bath. restore master bath, kitchen, lr, cabinets and fixtures kitchen and bath, fixtures drywall | $60,000 |
| Feb 21, 2019 | Completed final sign-off Oct 2022 | 235 Laidley St | renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entryDetails
renovations: new and patched wall exterior siding and select window and door replacements. interior alterations include new 1/2 bath at 1st level, upgrade e bath throughout, upgrade kitchen, living rm, refinish stair, addition of 18 sq ft of conditioned space at garage level between garage and entry | $180,000 |
| Apr 19, 2018 | Completed final sign-off Apr 2023 | 59 Potomac St | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim.Details
3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim. | $671,500 |
| Mar 5, 2018 | Completed final sign-off Dec 2018 | 24 Elsie St | relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck.Details
relocate entry door and 1st floor. master bedroom and bathroom addition and remodel. new sliding glass door at 2nd floor with new wood deck. | $75,000 |
| Nov 10, 2017 | Completed final sign-off Mar 2018 | 3912 Folsom St | master bathroom remodel. relocate 2 windows at back wallDetails
master bathroom remodel. relocate 2 windows at back wall | $25,000 |
| Aug 8, 2017 | Completed final sign-off Oct 2017 | 1480 Fulton St | bathroom remodel. new tub, toilet, shower valve, vanity and one ceiling light.Details
bathroom remodel. new tub, toilet, shower valve, vanity and one ceiling light. | $15,000 |
| May 22, 2017 | Expired or cancelled expired Aug 2022 | 20 Elsie St | 250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavationDetails
250 sq ft ground fl addition @ rear of bldg. 120 sq ft 2nd fl addition with deck & 325 sq ft roof deck. includes kitchen remodel & new bathroom @ 1st floor.10 cubic yard excavation | $185,000 |
| Aug 3, 2016 | Completed final sign-off Dec 2023 | 1646 Lyon St | convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft.Details
convert existing ground floor study into master suite and bathroom, remodel kitchen and bath; replace double sink at 2/f with single sink, add new interior stair. no exterior work visible from street. excavation not to exceed 8ft. | $150,000 |
| Jan 20, 2016 | Completed final sign-off Jun 2017 | 262 24th Av | scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec,Details
scope of work includes an interior remodel which includes kitchen and bathrooms, minor costmetic exterior improvements, and new windows & doors throughout. 1st floor - relocate bedrm, and (n) playroom, convert (e) bedrm to office. deferred submittal may include but are not limited to: mech, elec, | $395,729 |
| Aug 14, 2015 | Completed final sign-off Sep 2015 | 507 Moultrie St | removal of dry wall from ceiling in 2 bedroom bathroom and hall. new 2 layer of drywall @ ceiling on rc channel at 2 bedroom bathroom and hallDetails
removal of dry wall from ceiling in 2 bedroom bathroom and hall. new 2 layer of drywall @ ceiling on rc channel at 2 bedroom bathroom and hall | $10,000 |
| Jul 14, 2015 | Completed final sign-off Jan 2016 | 2114 Divisadero St | kitchen remodel, 1/2 bath remodel, new master bath, new laundry.Details
kitchen remodel, 1/2 bath remodel, new master bath, new laundry. | $85,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 1951 Turk St | 390 sq ft new conditioned space in basement level. new 1/2 bath, replace exterior concrete stairsDetails
390 sq ft new conditioned space in basement level. new 1/2 bath, replace exterior concrete stairs | $180,000 |
| Aug 7, 2014 | Completed final sign-off Jul 2015 | 100 Garcia Av | revision to app#201405125466. removal of proposed half bath at entry, changes in bar area wall and structural changes.Details
revision to app#201405125466. removal of proposed half bath at entry, changes in bar area wall and structural changes. | |
| May 12, 2014 | Completed final sign-off Nov 2014 | 100 Garcia Av | renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylightsDetails
renovation of kitchen. new island and lighting, master bathroom and closet, playroom, bathroom, opening of stair walls new lighting at lower floor, new laundry room, bar area. replace window at upper floor. remove window at master bedrm closet. add 3 new skylights | $75,000 |
| May 8, 2014 | Completed final sign-off Sep 2014 | 307 Chattanooga St | interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage.Details
interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage. | $75,000 |
| Mar 26, 2014 | Completed final sign-off Jun 2014 | 3324 Octavia St | replace tub with shower, new tile, new sink and toilet. run 20amp for the bathroom.Details
replace tub with shower, new tile, new sink and toilet. run 20amp for the bathroom. | $10,000 |
| Feb 4, 2014 | Completed final sign-off Mar 2014 | 4077 23rd St | removal of finish drywalls from ceiling in the apartment except the bathroom. new 2 layers of 5/8" type x dry wall on rc channel of insulationDetails
removal of finish drywalls from ceiling in the apartment except the bathroom. new 2 layers of 5/8" type x dry wall on rc channel of insulation | $15,000 |
| Jan 28, 2014 | Completed final sign-off May 2014 | 2864 Sacramento St | bathroom remodel new tub, new shower pan, new tile; compliance with ord 155-13 not requiredDetails
bathroom remodel new tub, new shower pan, new tile; compliance with ord 155-13 not required | $12,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2014 | 3324 Octavia St | unit 1 - kitchen and bathroom remodel. update of electricalDetails
unit 1 - kitchen and bathroom remodel. update of electrical | $30,000 |
| Aug 26, 2013 | Completed final sign-off Nov 2013 | 2856 Scott St | apt 3: bathroom remodel, remove tile toilet vanity, replace in same location. new tile, new toilet, new shower pan. new light, no structural work.Details
apt 3: bathroom remodel, remove tile toilet vanity, replace in same location. new tile, new toilet, new shower pan. new light, no structural work. | $11,000 |
| Jun 14, 2013 | Completed final sign-off Dec 2013 | 1524 Mason St | install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop.Details
install new fire place. install new bath tub and new toilet and new sink. (bathroom remodel). install new skylight. replace kitchen countertop. | $20,000 |
| Apr 18, 2013 | Completed final sign-off Sep 2013 | 3563 Sacramento St | removal of drywall, new drywall with insulation, new circulating pump running extra duct for bathroom. no change for (e) furnace, new lights in closet.Details
removal of drywall, new drywall with insulation, new circulating pump running extra duct for bathroom. no change for (e) furnace, new lights in closet. | $14,000 |
| Mar 28, 2012 | Completed final sign-off Jul 2012 | 25 Lucerne St | unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rmDetails
unit #2-replace e kitchen cabinetry and consturction of new kitchen island. at 2nd fl enlarge e master bathroom and replacement of all plumbing fixtures. new lighting at master bath and dining rm | $25,000 |
| Aug 15, 2011 | Completed final sign-off Dec 2011 | 50 Lansing St | unit #805:remodel of 2 bathrooms. new lighting in bedroom, new closet.Details
unit #805:remodel of 2 bathrooms. new lighting in bedroom, new closet. | $12,000 |
| May 6, 2011 | Completed final sign-off Jan 2012 | 68 Macondray Ln | bath remodel and tankless water heater, new kitchen cabinetsDetails
bath remodel and tankless water heater, new kitchen cabinets | $8,000 |
| Mar 14, 2011 | Completed final sign-off May 2011 | 3732 Sacramento St | bathroom remodel & adding of dryer and washer all work on 2nd floor, high efficacy lighting or occupancy sensor; dryer exhaust on sidewall terminate 3 min from pl and bldg openings, length limitation 14' maxDetails
bathroom remodel & adding of dryer and washer all work on 2nd floor, high efficacy lighting or occupancy sensor; dryer exhaust on sidewall terminate 3 min from pl and bldg openings, length limitation 14' max | $15,000 |
| Oct 28, 2010 | Completed final sign-off Mar 2011 | 922 Union St | revision to appl #201006164600: reduction in scope - omit bathroom addition, omit wall removal & therefore structural work, add shower at existing bath.Details
revision to appl #201006164600: reduction in scope - omit bathroom addition, omit wall removal & therefore structural work, add shower at existing bath. | |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 42 Winfield St | bathroom remodel. removal of shower, new bathtub instead, tile of tub area and floor. replace existing outlets with gfi and occupancy sensor switch.Details
bathroom remodel. removal of shower, new bathtub instead, tile of tub area and floor. replace existing outlets with gfi and occupancy sensor switch. | $5,000 |
| Jan 19, 2010 | Completed final sign-off Aug 2010 | 26 Yukon St | change 1st floor living room to master bedroom suite, construct new master bathroom & walk-in closet at 1st floor, master bedroom suite (garage level)Details
change 1st floor living room to master bedroom suite, construct new master bathroom & walk-in closet at 1st floor, master bedroom suite (garage level) | $4,200 |
| Sep 22, 2009 | Completed final sign-off Nov 2009 | 240 Liberty St | kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom.Details
kitchen & bathroom remodel. no moving ro adding walls. new cabinets, bathrub and shower valve. min. 50% kitchen lights in h.e. lights. h.e. or. o.s. in bathroom. | $14,000 |
| Aug 19, 2009 | Completed final sign-off Sep 2009 | 68 San Gabriel Av | bathroom remodel, new shawer valve, new tile walls and floor, new water heater in same loction (garage) raise 18" and provide sciesmic strap.Details
bathroom remodel, new shawer valve, new tile walls and floor, new water heater in same loction (garage) raise 18" and provide sciesmic strap. | $10,000 |
| Apr 17, 2009 | Completed final sign-off Jul 2009 | 135 Buchanan St | legalize use of garagae level storage and bathroom space. provide necessary separations as required by sfbc 406.1.4.(all work to comply & satisfy 3r-5322 report). mitigation of damaged mortar joints at fire places in units 135 & 137. comply w/kitchen range duct requirement at unit 137.Details
legalize use of garagae level storage and bathroom space. provide necessary separations as required by sfbc 406.1.4.(all work to comply & satisfy 3r-5322 report). mitigation of damaged mortar joints at fire places in units 135 & 137. comply w/kitchen range duct requirement at unit 137. | $9,000 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 235 Dorland St | kitchen remodel. remove two non bearing walls. add laundry area. retile bathroom (no structural work)Details
kitchen remodel. remove two non bearing walls. add laundry area. retile bathroom (no structural work) | $10,000 |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 237 Dorland St | 1 - remodel kitchen, demo wall & install header & posts, 2- retile bath, replace fixtures, install recessed lights, 3- install small sink and recessed lights in toilet room, 4 - install recessed lights in hallway & small study bedroom.all new lights to be fluorescent.Details
1 - remodel kitchen, demo wall & install header & posts, 2- retile bath, replace fixtures, install recessed lights, 3- install small sink and recessed lights in toilet room, 4 - install recessed lights in hallway & small study bedroom.all new lights to be fluorescent. | $15,000 |
| May 30, 2007 | Completed final sign-off Aug 2007 | 42 Winfield St | convert existing closet to powder room, bathroom, replace front window and add rear window @ side bay for new bathroom.Details
convert existing closet to powder room, bathroom, replace front window and add rear window @ side bay for new bathroom. | $4,000 |
| Mar 7, 2007 | Completed final sign-off May 2007 | 540 Fell St | remodel (e) bathroom within (e) space. replace tub, toilet, sink, fixtures: floor finishes. second floor. work in unit 542 onlyDetails
remodel (e) bathroom within (e) space. replace tub, toilet, sink, fixtures: floor finishes. second floor. work in unit 542 only | $6,000 |