Chi-Wing Wong
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Collaborate Design Group
- Based in
- Burlingame
- On San Francisco permits
- Oct 2003 to Apr 2025
19 permits since 2000 (architect on 16 permits, authorized agent-others on 2 permits, engineer on 1 permit): 12 completed, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2025 | Completed final sign-off Jul 2025 | 233 Sansome St | Maan Global Development | ground fl: interior demolition of all tenant portitions, finishes, electrical and plumbing. (e) door entry and restroom to remainDetails
ground fl: interior demolition of all tenant portitions, finishes, electrical and plumbing. (e) door entry and restroom to remain | $50,000 |
| Dec 12, 2023 | Completed final sign-off Jan 2024 | 452 Dellbrook Av | Wei Dang Builders Inc. | revision to approved pa#202209202756. to flatten part of the rear yard and construct a new retaining wall less than 4 feet.Details
revision to approved pa#202209202756. to flatten part of the rear yard and construct a new retaining wall less than 4 feet. | $5,000 |
| Mar 28, 2023 | Completed final sign-off Feb 2025 | 5145 Geary Bl | Paragon Management Construction | revision to pa 2020-0930-5602 to relocate service area and revision restroom layout on ground fl; 2nd fl ti to reconfigure food preparing facility & restrooms which is originally same business of the ground fl;Details
revision to pa 2020-0930-5602 to relocate service area and revision restroom layout on ground fl; 2nd fl ti to reconfigure food preparing facility & restrooms which is originally same business of the ground fl; | $90,000 |
| Sep 20, 2022 | Completed final sign-off Jan 2024 | 452 Dellbrook Av | Wei Dang Builders Inc. | construct rear deck connects 2nd floor, convert 1st floor storage into habitable space to include 1 master suite and 1 powder room. complete remodel on 2nd floor. windows at the front to be wood aluminum clad or architectual grade aluminum.Details
construct rear deck connects 2nd floor, convert 1st floor storage into habitable space to include 1 master suite and 1 powder room. complete remodel on 2nd floor. windows at the front to be wood aluminum clad or architectual grade aluminum. | $150,000 |
| Dec 20, 2021 | Completed final sign-off Mar 2022 | 2154 Mission St | Build Tech Construction Inc. | remove (e) pos & foh cabinets & counters; remove (1) hand sink; install (n) pos & foh cabinets & counters; install kick plate on both side entrance door & restroom door; replace door hardware to comply with ada & both entrance door & restroom door; provide level door landing, no steeper than 2% max.Details
remove (e) pos & foh cabinets & counters; remove (1) hand sink; install (n) pos & foh cabinets & counters; install kick plate on both side entrance door & restroom door; replace door hardware to comply with ada & both entrance door & restroom door; provide level door landing, no steeper than 2% max. | $50,000 |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | Dliu Construction | revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left.Details
revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left. | |
| Feb 5, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | Maan Global Development | revision to pa# 202010076118. convert ground floor to 2nd unit allowed by planning zoning.Details
revision to pa# 202010076118. convert ground floor to 2nd unit allowed by planning zoning. | |
| Oct 7, 2020 | Completed final sign-off Mar 2022 | 1554 20th Av | Maan Global Development | add new habitable space at garage level. interior renovation to (e) sfd. convert rear part of 1st flr into habitable space to incl 2 bedrms, 2 baths and a fam rm. reconfigure 2nd flr layout, add 1 bedrm & 1 bath. infill lightwell at north sides. (n) skylights.Details
add new habitable space at garage level. interior renovation to (e) sfd. convert rear part of 1st flr into habitable space to incl 2 bedrms, 2 baths and a fam rm. reconfigure 2nd flr layout, add 1 bedrm & 1 bath. infill lightwell at north sides. (n) skylights. | $80,000 |
| Sep 30, 2020 | Completed final sign-off Feb 2025 | 5145 Geary Bl | t.i. to (e) restaurant on g/f: relocate restroom and upgrade to comply ada.install new door on geary bl to comply with abe due to (e) condition non-compliant. lighting & electrical to remain unchanged. maher n/a.Details
t.i. to (e) restaurant on g/f: relocate restroom and upgrade to comply ada.install new door on geary bl to comply with abe due to (e) condition non-compliant. lighting & electrical to remain unchanged. maher n/a. | $50,000 | |
| Aug 22, 2017 | Never finaled issued Mar 2019, no final | 343 Rivera St | Zhao Wei Lu Construction Co., Polytec Construction Company Inc | unit legalization ordinance 43-14. legalize in law apartment on ground floor as per ordinance 43-14.Details
unit legalization ordinance 43-14. legalize in law apartment on ground floor as per ordinance 43-14. | $10,000 |
| Aug 16, 2016 | Completed final sign-off Jan 2020 | 1723 09th Av | Giants Construction | horizontal expansion . interior reovation. add a master bedroom & 1 bathroom. a total of 798 sf for both floors.Details
horizontal expansion . interior reovation. add a master bedroom & 1 bathroom. a total of 798 sf for both floors. | $150,000 |
| Feb 12, 2016 | Never finaled issued Dec 2016, no final | 400 Bay St | Thompson Builders Corp | to erect 4 stories of 13 dwelling units, with roof deckDetails
to erect 4 stories of 13 dwelling units, with roof deck | $3,500,000 |
| Dec 18, 2015 | Never finaled filed Dec 2015, never issued | 400 Bay St | to demolish 1 story restaurant building. ** maher: n/a **Details
to demolish 1 story restaurant building. ** maher: n/a ** | $15,000 | |
| Apr 6, 2015 | Expired or cancelled cancelled Nov 2024 | 423 28th St | per sf ordinance no# 43-14. legalize ground floor in-law apartment. install fire sprinklers to ground floor level. new in-law apartment has 1 new bedroom, 1 new bathroom & 1 new kitchen.Details
per sf ordinance no# 43-14. legalize ground floor in-law apartment. install fire sprinklers to ground floor level. new in-law apartment has 1 new bedroom, 1 new bathroom & 1 new kitchen. | $15,000 | |
| Mar 2, 2015 | Expired or cancelled cancelled Apr 2021 | 868 Duncan St | legalize 1st floor unit as per ordinace 43-14.Details
legalize 1st floor unit as per ordinace 43-14. | $700 | |
| May 7, 2013 | Expired or cancelled withdrawn Jul 2015 | 865 Rhode Island St | inteiror renovation, adding 5 dormers, converting garage, adding 2 bedrooms & 2 bathrooms on 3rd level, adding playroom, bedroom, restroom, powder room, laundry room on 1st floor, infill lightwell, add roof access w/guardrail.Details
inteiror renovation, adding 5 dormers, converting garage, adding 2 bedrooms & 2 bathrooms on 3rd level, adding playroom, bedroom, restroom, powder room, laundry room on 1st floor, infill lightwell, add roof access w/guardrail. | $150,000 | |
| Apr 25, 2013 | Completed final sign-off Oct 2013 | 953 Indiana St | E.A.Davidovits &Co.,Inc. | revision to appl #201301258751-s2: 1 hour fire substitution sprinkler per table 601 footnoted, sfbc 2010 in lieu of 1 hour fire-resistance construction.Details
revision to appl #201301258751-s2: 1 hour fire substitution sprinkler per table 601 footnoted, sfbc 2010 in lieu of 1 hour fire-resistance construction. | |
| Jun 3, 2004 | Expired or cancelled cancelled Feb 2010 | 1274 22nd Av | horiz. & vert.addition for a 2nd dwelling unit w/a 2nd off-street parking space to an (e) single famDetails
horiz. & vert.addition for a 2nd dwelling unit w/a 2nd off-street parking space to an (e) single fam | $200,000 | |
| Oct 14, 2003 | Completed final sign-off Dec 2003 | 191 Robinhood Dr | addition of work room in first floorDetails
addition of work room in first floor | $23,000 |