Kieran Collins Construction
- Based in
- Novato
- On San Francisco permits
- May 2017 to Feb 2026
- Last 24 months
- 6 permits filed
35 permits since 2000: 25 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 236 06th Av | unit 236 and 238- remodel 2x bathroom and kitchen like for like in kind no shower pan work or wall removal .Details
unit 236 and 238- remodel 2x bathroom and kitchen like for like in kind no shower pan work or wall removal . | $60,000 |
| May 14, 2025 | Completed final sign-off Mar 2026 | 2717 Pine St | remodel 2 existing bathrooms in kind and reconfigure (e) laundry room, no wall demolition or construction, no change in plumbing fixture count.Details
remodel 2 existing bathrooms in kind and reconfigure (e) laundry room, no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Apr 17, 2025 | Completed final sign-off Jul 2025 | 332 Douglass St | patch existing concrete in garage; fix cracks with grout.Details
patch existing concrete in garage; fix cracks with grout. | $2,500 |
| Mar 27, 2025 | In progress issued May 2025 | 332 Douglass St | renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garageDetails
renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garage | $520,000 |
| Mar 17, 2025 | In progress issued Jul 2025 | 345 31st Av | rear deck within buildable area . new sliding doorDetails
rear deck within buildable area . new sliding door | $12,000 |
| Feb 26, 2025 | In progress issued Apr 2025 | 345 31st Av | new lighting, new garage door. 1st lvl: renovate kitchen and improve half bath to full bath. 2nd lvl: add closet and improve existing full bath.Details
new lighting, new garage door. 1st lvl: renovate kitchen and improve half bath to full bath. 2nd lvl: add closet and improve existing full bath. | $50,000 |
| Jul 25, 2024 | In progress issued Nov 2024 | 811 Clayton St | kitchen renovation with new 1/2 bath on level 1.Details
kitchen renovation with new 1/2 bath on level 1. | $50,000 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 2901 Pine St | limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans.Details
limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans. | $100,000 |
| Jun 29, 2022 | Expired or cancelled expired Sep 2024 | 855 Junipero Serra Bl | replace in kind stucco entire bldgDetails
replace in kind stucco entire bldg | $25,000 |
| Apr 13, 2022 | Expired or cancelled expired Sep 2024 | 855 Junipero Serra Bl | replace in kind window with wood clad windows facing the street. to comply with complaint #202289625. u factor < 0.30Details
replace in kind window with wood clad windows facing the street. to comply with complaint #202289625. u factor < 0.30 | $10,000 |
| May 7, 2021 | Completed final sign-off Mar 2022 | 100 San Felipe Av | in kind kitchen remodel. no change to floor plans or walls. in kind bathrooms remodel. no change to floor plans or wallsDetails
in kind kitchen remodel. no change to floor plans or walls. in kind bathrooms remodel. no change to floor plans or walls | $40,000 |
| Mar 5, 2021 | Completed final sign-off Feb 2022 | 2412 Lake St | replace siding in kind front facade resue (e) trim windows will be replace with marvin wood clad to match (e) function & style.Details
replace siding in kind front facade resue (e) trim windows will be replace with marvin wood clad to match (e) function & style. | $6,000 |
| Jan 11, 2021 | Completed final sign-off May 2021 | 326 Hearst Av | revision to pa 202002063680. omit kitchen renovation from scope of work including skylight and wall removal.Details
revision to pa 202002063680. omit kitchen renovation from scope of work including skylight and wall removal. | |
| Aug 28, 2020 | Completed final sign-off Oct 2021 | 647 Alvarado St | legalize (e) basement level and include it in the total house area. the (e) basement level is used as an office. the project does not propose any new construction.Details
legalize (e) basement level and include it in the total house area. the (e) basement level is used as an office. the project does not propose any new construction. | |
| Jul 14, 2020 | Completed final sign-off Apr 2025 | 80 06th Av | 1/f: convert (e) space to have 2 bedrms, 2 bathrms for unit #1. 2/f unit #1: remodel kitchen, bathrm, add a powder rm, & a laundry rm. add rear deck. 3/f unit #2: remodel bathm, relocate kitchen from 3/f, add a powder rm. 4/f unit #2: remodel bathrm, add a bathrm, remodel main stair, & add elevator.Details
1/f: convert (e) space to have 2 bedrms, 2 bathrms for unit #1. 2/f unit #1: remodel kitchen, bathrm, add a powder rm, & a laundry rm. add rear deck. 3/f unit #2: remodel bathm, relocate kitchen from 3/f, add a powder rm. 4/f unit #2: remodel bathrm, add a bathrm, remodel main stair, & add elevator. | $200,000 |
| Mar 13, 2020 | Completed final sign-off Aug 2022 | 2531 Larkin St | revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flueDetails
revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flue | $100,000 |
| Feb 6, 2020 | Completed final sign-off May 2021 | 326 Hearst Av | 75 sf addition at gr fl at rear of bldg with remodeled laundry and bath. master bath remodel. hall bath remodel, kitchen remodel, window replacement at front and rearDetails
75 sf addition at gr fl at rear of bldg with remodeled laundry and bath. master bath remodel. hall bath remodel, kitchen remodel, window replacement at front and rear | $135,000 |
| Nov 19, 2019 | Completed final sign-off Aug 2022 | 2531 Larkin St | gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at frontDetails
gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at front | $400,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2022 | 2412 Lake St | 1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stairDetails
1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stair | $80,000 |
| Nov 5, 2019 | Never finaled issued Apr 2021, no final | 855 Junipero Serra Bl | basement: convert (e) space to have 4 bedrooms, a media room, an exercise room, & 2 bathrooms. 1st fl: rmeodel kitchen & bathroom, add a powder room, remodel rear deck. 2nd fl: remodel (e) bathroom, add a playroom & a bathroom.Details
basement: convert (e) space to have 4 bedrooms, a media room, an exercise room, & 2 bathrooms. 1st fl: rmeodel kitchen & bathroom, add a powder room, remodel rear deck. 2nd fl: remodel (e) bathroom, add a playroom & a bathroom. | $200,000 |
| Nov 1, 2019 | Completed final sign-off Nov 2019 | 2474 38th Av | replace in-kind, aluminum windows w/ vinyl in the rear and wood clad in the front. install hardie plank siding in the rear of the buildingDetails
replace in-kind, aluminum windows w/ vinyl in the rear and wood clad in the front. install hardie plank siding in the rear of the building | $11,000 |
| Oct 28, 2019 | Completed final sign-off Sep 2020 | 811 Clayton St | deck replacement project(rear yard)Details
deck replacement project(rear yard) | $18,000 |
| Aug 9, 2019 | Completed final sign-off Feb 2020 | 730 Howard St | at (e) storage space for "samovar tea lounge", provide enclosure and install (n) interior partitions per health department requestDetails
at (e) storage space for "samovar tea lounge", provide enclosure and install (n) interior partitions per health department request | $7,000 |
| Aug 5, 2019 | Completed final sign-off Dec 2019 | 2146 Mission St | mechanical plans for 201902273963Details
mechanical plans for 201902273963 | $15,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 1901 California St | replacement, like for like, of existing non structural stair on grade between two garages.Details
replacement, like for like, of existing non structural stair on grade between two garages. | $9,500 |
| Apr 1, 2019 | Never finaled issued Feb 2023, no final | 993 Mission St | expansion of (e) restaurant annex adjacent fire damaged retail space. ti - are to include 3 new single accomodation toilet rooms. no expansion of conditioned floor area maher naDetails
expansion of (e) restaurant annex adjacent fire damaged retail space. ti - are to include 3 new single accomodation toilet rooms. no expansion of conditioned floor area maher na | $180,000 |
| Feb 27, 2019 | Completed final sign-off Dec 2019 | 2146 Mission St | interior remodel to (e) retail establishment, 2 new ada compliant restrooms, add power actuator to front entry to meet ada compliance per mandatory disability acces programDetails
interior remodel to (e) retail establishment, 2 new ada compliant restrooms, add power actuator to front entry to meet ada compliance per mandatory disability acces program | $49,000 |
| Nov 29, 2018 | Completed final sign-off Aug 2019 | 2901 Pine St | (n) 480 sf roof deck over (flat roof) with (n) stair connecting 3rd fl. exterior patio, and (n) roof deck. all scope of work in within the buildable are of the lotDetails
(n) 480 sf roof deck over (flat roof) with (n) stair connecting 3rd fl. exterior patio, and (n) roof deck. all scope of work in within the buildable are of the lot | $20,000 |
| Jun 20, 2018 | Completed final sign-off Sep 2018 | 865 Faxon Av | replacement in kind of failing unreinforced retaining wall in garageDetails
replacement in kind of failing unreinforced retaining wall in garage | $40,000 |
| Apr 5, 2018 | Completed final sign-off Nov 2023 | 2847 Folsom St | construct (2)(n) adu's at (e) garage space. ordinance 162-17Details
construct (2)(n) adu's at (e) garage space. ordinance 162-17 | $100,000 |
| Apr 4, 2018 | Completed final sign-off Mar 2023 | 2847 Folsom St | to comply with sf soft story program: install new steel frame at garage area, install new plywood over (e) studwall, install mew holddown, install new footing for steel frame & new shearwallsDetails
to comply with sf soft story program: install new steel frame at garage area, install new plywood over (e) studwall, install mew holddown, install new footing for steel frame & new shearwalls | $50,000 |
| Nov 16, 2017 | Completed final sign-off Jan 2018 | 519 Mangels Av | new staircase in rear yard from 2nd floor to grade. remove & replace two windows on the 2nd floor over looking the rear yard. new door to new stairs at the back of house. new window to be u-factor of .32. replacement window max u-factor .40.Details
new staircase in rear yard from 2nd floor to grade. remove & replace two windows on the 2nd floor over looking the rear yard. new door to new stairs at the back of house. new window to be u-factor of .32. replacement window max u-factor .40. | $3,000 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 519 Mangels Av | replace 2 single pane aluminum windows with wood double pane. replace existing aluminum siding wiht 1x 8 wood siding and 1x4 wood trim. u-factor =0.32Details
replace 2 single pane aluminum windows with wood double pane. replace existing aluminum siding wiht 1x 8 wood siding and 1x4 wood trim. u-factor =0.32 | $12,000 |
| Nov 9, 2017 | Completed final sign-off Jan 2018 | 519 Mangels Av | remodel kitchen, move sink , relocate interior door.Details
remodel kitchen, move sink , relocate interior door. | $33,000 |
| May 11, 2017 | Completed final sign-off Dec 2018 | 993 Mission St | expansion of (e) bar/night club at 101 6th st to convert an (e)pawn shop. change of use to restaurant under 50 occupants. will include interior demo & construction, ada upgrades. work includes ground flr. dining/kit & kit/stor @ basement. 993 mission st as separate address forDetails
expansion of (e) bar/night club at 101 6th st to convert an (e)pawn shop. change of use to restaurant under 50 occupants. will include interior demo & construction, ada upgrades. work includes ground flr. dining/kit & kit/stor @ basement. 993 mission st as separate address for | $75,000 |