Kieran Collins Construction
- Based in
- Novato
- On San Francisco permits
- May 2017 to Feb 2026
- Last 24 months
- 6 permits filed
35 permits since 2000: 25 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 in progress. Typically 54 days from filing to permit and 449 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2025 | In progress issued May 2025 | 332 Douglass St | renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garageDetails
renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garage | $520,000 |
| Jul 14, 2020 | Completed final sign-off Apr 2025 | 80 06th Av | 1/f: convert (e) space to have 2 bedrms, 2 bathrms for unit #1. 2/f unit #1: remodel kitchen, bathrm, add a powder rm, & a laundry rm. add rear deck. 3/f unit #2: remodel bathm, relocate kitchen from 3/f, add a powder rm. 4/f unit #2: remodel bathrm, add a bathrm, remodel main stair, & add elevator.Details
1/f: convert (e) space to have 2 bedrms, 2 bathrms for unit #1. 2/f unit #1: remodel kitchen, bathrm, add a powder rm, & a laundry rm. add rear deck. 3/f unit #2: remodel bathm, relocate kitchen from 3/f, add a powder rm. 4/f unit #2: remodel bathrm, add a bathrm, remodel main stair, & add elevator. | $200,000 |
| Mar 13, 2020 | Completed final sign-off Aug 2022 | 2531 Larkin St | revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flueDetails
revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flue | $100,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2022 | 2412 Lake St | 1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stairDetails
1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stair | $80,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 1901 California St | replacement, like for like, of existing non structural stair on grade between two garages.Details
replacement, like for like, of existing non structural stair on grade between two garages. | $9,500 |
| Nov 29, 2018 | Completed final sign-off Aug 2019 | 2901 Pine St | (n) 480 sf roof deck over (flat roof) with (n) stair connecting 3rd fl. exterior patio, and (n) roof deck. all scope of work in within the buildable are of the lotDetails
(n) 480 sf roof deck over (flat roof) with (n) stair connecting 3rd fl. exterior patio, and (n) roof deck. all scope of work in within the buildable are of the lot | $20,000 |
| Nov 16, 2017 | Completed final sign-off Jan 2018 | 519 Mangels Av | new staircase in rear yard from 2nd floor to grade. remove & replace two windows on the 2nd floor over looking the rear yard. new door to new stairs at the back of house. new window to be u-factor of .32. replacement window max u-factor .40.Details
new staircase in rear yard from 2nd floor to grade. remove & replace two windows on the 2nd floor over looking the rear yard. new door to new stairs at the back of house. new window to be u-factor of .32. replacement window max u-factor .40. | $3,000 |