Back to bathroom remodel contractors
Kieran Collins Construction
- Based in
- Novato
- On San Francisco permits
- May 2017 to Feb 2026
- Last 24 months
- 6 permits filed
35 permits since 2000: 25 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 6 completed, 4 in progress, 1 never finaled. Typically 5 days from filing to permit and 390 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 236 06th Av | unit 236 and 238- remodel 2x bathroom and kitchen like for like in kind no shower pan work or wall removal .Details
unit 236 and 238- remodel 2x bathroom and kitchen like for like in kind no shower pan work or wall removal . | $60,000 |
| May 14, 2025 | Completed final sign-off Mar 2026 | 2717 Pine St | remodel 2 existing bathrooms in kind and reconfigure (e) laundry room, no wall demolition or construction, no change in plumbing fixture count.Details
remodel 2 existing bathrooms in kind and reconfigure (e) laundry room, no wall demolition or construction, no change in plumbing fixture count. | $60,000 |
| Mar 27, 2025 | In progress issued May 2025 | 332 Douglass St | renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garageDetails
renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garage | $520,000 |
| Feb 26, 2025 | In progress issued Apr 2025 | 345 31st Av | new lighting, new garage door. 1st lvl: renovate kitchen and improve half bath to full bath. 2nd lvl: add closet and improve existing full bath.Details
new lighting, new garage door. 1st lvl: renovate kitchen and improve half bath to full bath. 2nd lvl: add closet and improve existing full bath. | $50,000 |
| Jul 25, 2024 | In progress issued Nov 2024 | 811 Clayton St | kitchen renovation with new 1/2 bath on level 1.Details
kitchen renovation with new 1/2 bath on level 1. | $50,000 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 2901 Pine St | limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans.Details
limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans. | $100,000 |
| May 7, 2021 | Completed final sign-off Mar 2022 | 100 San Felipe Av | in kind kitchen remodel. no change to floor plans or walls. in kind bathrooms remodel. no change to floor plans or wallsDetails
in kind kitchen remodel. no change to floor plans or walls. in kind bathrooms remodel. no change to floor plans or walls | $40,000 |
| Feb 6, 2020 | Completed final sign-off May 2021 | 326 Hearst Av | 75 sf addition at gr fl at rear of bldg with remodeled laundry and bath. master bath remodel. hall bath remodel, kitchen remodel, window replacement at front and rearDetails
75 sf addition at gr fl at rear of bldg with remodeled laundry and bath. master bath remodel. hall bath remodel, kitchen remodel, window replacement at front and rear | $135,000 |
| Nov 19, 2019 | Completed final sign-off Aug 2022 | 2531 Larkin St | gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at frontDetails
gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at front | $400,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2022 | 2412 Lake St | 1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stairDetails
1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stair | $80,000 |
| Nov 5, 2019 | Never finaled issued Apr 2021, no final | 855 Junipero Serra Bl | basement: convert (e) space to have 4 bedrooms, a media room, an exercise room, & 2 bathrooms. 1st fl: rmeodel kitchen & bathroom, add a powder room, remodel rear deck. 2nd fl: remodel (e) bathroom, add a playroom & a bathroom.Details
basement: convert (e) space to have 4 bedrooms, a media room, an exercise room, & 2 bathrooms. 1st fl: rmeodel kitchen & bathroom, add a powder room, remodel rear deck. 2nd fl: remodel (e) bathroom, add a playroom & a bathroom. | $200,000 |