David Yadegar
- Listed as
- architect, designer, engineer
- Firm
- David Yadegar, Pe
- Based in
- Berkeley
- On San Francisco permits
- Dec 2011 to Oct 2026
84 permits since 2000 (engineer on 77 permits, architect on 6 permits, designer on 1 permit): 44 completed, 22 in progress, 12 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 17 Ora Wy | interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will.Details
interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will. | $450,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 646 06th Av | Cbs Construction Inc. | interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & subDetails
interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & sub | $350,000 |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 2646 47th Av | single family residential home, built 1944. proposal to extend ground floor into rear yard to add bathroom and expanded existing space. relocate existing bedroom on the second floor over ground floor addition, add a family room and rearrange the existing bedrooms and bathroom.Details
single family residential home, built 1944. proposal to extend ground floor into rear yard to add bathroom and expanded existing space. relocate existing bedroom on the second floor over ground floor addition, add a family room and rearrange the existing bedrooms and bathroom. | $175,000 | |
| Jul 2, 2026 | In progress issued Aug 2026 | 3601 Ortega St | O'reilly Construction | add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area.Details
add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area. | $150,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 442 Liberty St | A M Rocca Inc. | structrual revision to pa# 202508193387, upon field verification, to perform voluntary structural strengthing to foundation and framing according to revised plans. no exterior or interior architectural changes. add additional plywood sheathed wall in garage.Details
structrual revision to pa# 202508193387, upon field verification, to perform voluntary structural strengthing to foundation and framing according to revised plans. no exterior or interior architectural changes. add additional plywood sheathed wall in garage. | $20,000 |
| Apr 14, 2026 | In progress filed Apr 2026, not yet issued | 593 Chenery St | Benjamin Builder | remodel of (e) garage level to crestae "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft.Details
remodel of (e) garage level to crestae "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft. | $175,000 |
| Feb 20, 2026 | In progress issued Jun 2026 | 25 Forest Side Av | Mizen Construction Inc | rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacementDetails
rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacement | $700,000 |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 2139 Green St | Meryl & Miller Llc | unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights.Details
unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights. | $60,000 |
| Jan 6, 2026 | In progress filed Jan 2026, not yet issued | 2323 Greenwich St | rear horizontal expansion @ 1st, 2nd & 3rd flrs. roof modification for increased head height at third floor. interior reconfiguration at all floors. renovation of existing studio outbuilding. exterior:new finishes, windows, and doors at rear of main house and front of studio...Details
rear horizontal expansion @ 1st, 2nd & 3rd flrs. roof modification for increased head height at third floor. interior reconfiguration at all floors. renovation of existing studio outbuilding. exterior:new finishes, windows, and doors at rear of main house and front of studio... | $900,000 | |
| Dec 12, 2025 | In progress filed Dec 2025, not yet issued | 520 Pacheco St | interior remodel of 1st and 2nd floors at rear rooms ncluding wall infills, new doors, and new casework. exterior work includes new deck @ 2nd floorDetails
interior remodel of 1st and 2nd floors at rear rooms ncluding wall infills, new doors, and new casework. exterior work includes new deck @ 2nd floor | $2,500 | |
| Dec 5, 2025 | In progress issued Dec 2025 | 2793 Pine St | Jordan Mendez Construction Inc | remove 3/f balcony and extend office. remodel 3/f bathroom, extend bedroom #301 over bath below. install new heat pump hvac system. no change in use or parking.Details
remove 3/f balcony and extend office. remodel 3/f bathroom, extend bedroom #301 over bath below. install new heat pump hvac system. no change in use or parking. | $90,000 |
| Aug 14, 2025 | Completed final sign-off Sep 2026 | 361 Upper Tr | Sage Construction Services | revision to pa #202201135971 for reduction in scope, project to proceed with placing of windows,doors, nw balcony guardrails, select demo of interior walls less than 25%. enlarged opening of level 01 windows, replace interior stair, spiral stair down to back yard. approx. 90% reduction in app. scpDetails
revision to pa #202201135971 for reduction in scope, project to proceed with placing of windows,doors, nw balcony guardrails, select demo of interior walls less than 25%. enlarged opening of level 01 windows, replace interior stair, spiral stair down to back yard. approx. 90% reduction in app. scp | |
| Jul 23, 2025 | Completed final sign-off Aug 2026 | 2503 Broadway | Jeff King And Company Inc | open up wall from existing kitchen to dining room. add sink to laundry room.Details
open up wall from existing kitchen to dining room. add sink to laundry room. | $60,000 |
| Mar 11, 2025 | Expired or cancelled expired Jul 2026 | 3881 Washington St | Drake Construction | remove wall between dining & kitchen. replace windows in family & kitchen. relocate partitions for new bath location. replace (e) direct vent fireplace. all work to be performed within (e) footprintDetails
remove wall between dining & kitchen. replace windows in family & kitchen. relocate partitions for new bath location. replace (e) direct vent fireplace. all work to be performed within (e) footprint | $50,000 |
| Feb 7, 2025 | In progress issued Feb 2025 | 30 Presidio Tr | Ggd Inc. | voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly.Details
voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly. | $20,000 |
| Dec 31, 2024 | In progress issued Jan 2025 | 309 Warren Dr | Custom 6 Builders | kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room.Details
kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room. | $275,000 |
| Dec 9, 2024 | In progress issued Jan 2025 | 121 Moffitt St | comply with nov # 202182450. construct fire walls on left & right side of deck. reinforce front glass railing. extend small portion of front deck at rear of the bldg. rev to pa# 2022-0517-4454Details
comply with nov # 202182450. construct fire walls on left & right side of deck. reinforce front glass railing. extend small portion of front deck at rear of the bldg. rev to pa# 2022-0517-4454 | $10,000 | |
| Jul 10, 2024 | In progress issued Jul 2024 | 133 07th Av | Madden Construction | remodel existing kitchen & bathroom. new stairs to garage and open interior wallsDetails
remodel existing kitchen & bathroom. new stairs to garage and open interior walls | $150,000 |
| Jun 12, 2024 | In progress issued Jul 2024 | 379 Eureka St | Martin Tynan & Son Construction | ***priority ab-004 revision to pa# 202112174661: field revision is for design steel piles in concrete & lagging as temporary shoring of neighbors dirt grade in backyard.field conditions require increasing the retained heights up to 8'-0" max @ rear of bldg along grideline 2, grideline d & exteriorDetails
***priority ab-004 revision to pa# 202112174661: field revision is for design steel piles in concrete & lagging as temporary shoring of neighbors dirt grade in backyard.field conditions require increasing the retained heights up to 8'-0" max @ rear of bldg along grideline 2, grideline d & exterior | |
| May 3, 2024 | In progress issued Oct 2025 | 502 Jefferson St | Rossi Builders Inc. | install new exterior sauna room at existing deck (at grade)Details
install new exterior sauna room at existing deck (at grade) | $40,000 |
| Apr 8, 2024 | In progress issued Mar 2025 | 30 Presidio Tr | Ggd Inc. | excavate existing crawl spaces withink existing bldg basement garage to match existing garage floor level. new foundation and structural framing as reqiuired. no change to the conditioned spaces or exterior of the residence. mech, elect and plumb under sep permit.Details
excavate existing crawl spaces withink existing bldg basement garage to match existing garage floor level. new foundation and structural framing as reqiuired. no change to the conditioned spaces or exterior of the residence. mech, elect and plumb under sep permit. | $40,000 |
| Jan 11, 2024 | In progress issued Jan 2024 | 235 Tocoloma Av | interior remodel: kitchen, bathrooms, move stairs, convert family room to bedroom, new hvac; exterior: replace rear courtyard windows & doors, replace rear door w/larger slider, replace rear stairs and deck.Details
interior remodel: kitchen, bathrooms, move stairs, convert family room to bedroom, new hvac; exterior: replace rear courtyard windows & doors, replace rear door w/larger slider, replace rear stairs and deck. | $200,000 | |
| Dec 21, 2023 | Expired or cancelled expired Apr 2026 | 2511 Octavia St | foundation upgrade and seismic strengthening at crawlspace. complete encapsulation of (e) brick foundation with concrete foundation. (n) interior shear walls in crawlspace.Details
foundation upgrade and seismic strengthening at crawlspace. complete encapsulation of (e) brick foundation with concrete foundation. (n) interior shear walls in crawlspace. | $50,000 | |
| Nov 17, 2023 | Completed final sign-off Jul 2025 | 3550 Baker St | Golden State Designs | replace (e) sloped roof above entry with (n) 30.5sf roof deck. add (n) exterior door at bedroom for roof deck access. no expansion of building envelope or increase in conditioned floor area.Details
replace (e) sloped roof above entry with (n) 30.5sf roof deck. add (n) exterior door at bedroom for roof deck access. no expansion of building envelope or increase in conditioned floor area. | $2,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | Cook Construction | 3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027Details
3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027 | $48,950 |
| Nov 6, 2023 | In progress issued Apr 2024 | 593 Chenery St | Benjamin Builder | full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window.Details
full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window. | $225,000 |
| Nov 3, 2023 | Completed final sign-off Jun 2024 | 549 19th Av | Duane Ernst Construction | interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell windowDetails
interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell window | $128,483 |
| Sep 27, 2023 | Completed final sign-off Mar 2024 | 182 Hartford St | Mascheroni Construction | new fence @ rear to replace (e) alone south property line. new lowered seating area w/ gas fire pit. install drip irrigation & low voltage landscape light. soil amendent, new planting, & mulchingDetails
new fence @ rear to replace (e) alone south property line. new lowered seating area w/ gas fire pit. install drip irrigation & low voltage landscape light. soil amendent, new planting, & mulching | $50,000 |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 1418 Ingalls St | Restoration Workshop Ltd | interior remodel of 1/f and bathroom remodel of 2/f. voluntary foundation strengthening, replace garage slab & voluntary plywood shear wall strengthening. add bathroom and bedroom at 1/fDetails
interior remodel of 1/f and bathroom remodel of 2/f. voluntary foundation strengthening, replace garage slab & voluntary plywood shear wall strengthening. add bathroom and bedroom at 1/f | $185,000 |
| Jun 29, 2023 | Completed final sign-off Sep 2023 | 134 Aptos Av | Perez Construction Llc. | seismic strengthing involving plywood shear walls, expoxied anchor bolts and holdowns in (e) garage & crawl space.Details
seismic strengthing involving plywood shear walls, expoxied anchor bolts and holdowns in (e) garage & crawl space. | $20,000 |
| May 2, 2023 | In progress issued Apr 2024 | 150 09th St | D.F.P.F Corp Dba Fine Line Construction | mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units.Details
mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units. | $9,000,000 |
| Feb 7, 2023 | Completed final sign-off Jun 2023 | 190 Albion St | Steelcore Builders Inc | remove and replace wood beams with steel beams in the garage. special inspections and tests are required as per building code sec 1701.Details
remove and replace wood beams with steel beams in the garage. special inspections and tests are required as per building code sec 1701. | $22,000 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 144 Clipper St | Christopher Gate Construction Inc | revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & libraryDetails
revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & library | $1,500 |
| Oct 20, 2022 | Completed final sign-off Oct 2023 | 48 Navajo Av | Mizen Construction Inc | kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level.Details
kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level. | $148,000 |
| Oct 11, 2022 | In progress issued Feb 2024 | 502 Jefferson St | Rossi Builders Inc. | exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupolaDetails
exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola | $1,252,000 |
| Sep 23, 2022 | Never finaled filed Sep 2022, never issued | 3282 22nd St | project is "warm shell" improvements to (e) vacant ground floor commercial tenant space. work inclludes interior demo, construction of a mezzanine, new mechanical system, lighting, replacement of entry storefront system and upgrade of restroom for ada accessibilityDetails
project is "warm shell" improvements to (e) vacant ground floor commercial tenant space. work inclludes interior demo, construction of a mezzanine, new mechanical system, lighting, replacement of entry storefront system and upgrade of restroom for ada accessibility | $195,000 | |
| Sep 7, 2022 | Completed final sign-off Jun 2023 | 542 Valley St | Reeb Design & Build Inc | revision to pa# 2022-0412-2005. revised structural drawings.Details
revision to pa# 2022-0412-2005. revised structural drawings. | $2,000 |
| Jul 29, 2022 | Completed final sign-off Mar 2023 | 1436 Cole St | Madden Construction | remodel primary bathroom and walk in closet.Details
remodel primary bathroom and walk in closet. | $50,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | Urbnbuild Inc | 19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.Details
19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred. | $350,000 |
| Apr 28, 2022 | Completed final sign-off Aug 2022 | 174 Ellis St | Bright Power Inc Dba Bright Coastal | construction of a steel frame attached to roof parapet and column, to support 2 heat pump water heaters (895 lb each)Details
construction of a steel frame attached to roof parapet and column, to support 2 heat pump water heaters (895 lb each) | $5,350 |
| Apr 27, 2022 | Completed final sign-off Jan 2023 | 2111 40th Av | 5/8" diameter anchor bolts, x 10" embedment at 4'-o"oc with epoxy voluntary seismic retrofit per plan. this permit is for work to be performed in general conformance with the ca existing bldg code (cebe) appendix cahpter #3. sfbc ab 108Details
5/8" diameter anchor bolts, x 10" embedment at 4'-o"oc with epoxy voluntary seismic retrofit per plan. this permit is for work to be performed in general conformance with the ca existing bldg code (cebe) appendix cahpter #3. sfbc ab 108 | $3,500 | |
| Apr 12, 2022 | Completed final sign-off Jun 2023 | 542 Valley St | Reeb Design & Build Inc | rev to pa# 2021-0525-1032: addition of rear retaining walls, new deck revision, and a new fire rated windowDetails
rev to pa# 2021-0525-1032: addition of rear retaining walls, new deck revision, and a new fire rated window | $50,000 |
| Apr 5, 2022 | Completed final sign-off Sep 2022 | 180 Turk St | Pacific Weathershield | installing a platform and roofing it in while installing sleepers for equipment on the roof. infill existing skylight opening. roof at rear, not visible from public right of way.Details
installing a platform and roofing it in while installing sleepers for equipment on the roof. infill existing skylight opening. roof at rear, not visible from public right of way. | $13,734 |
| Jan 21, 2022 | Completed final sign-off Apr 2023 | 1056 Sanchez St | Z Construction Company Inc | soft story seismic upgrade in support of adu pending permit 202106293469.Details
soft story seismic upgrade in support of adu pending permit 202106293469. | $25,000 |
| Jan 18, 2022 | Completed final sign-off Sep 2026 | 30 Presidio Tr | Ggd Inc. | addition of (1) new roof dormer, enlarge(1) e roof dormer, modif. of a ceiling below an e roof dormer, addition of a new roof access from the e attic, renov. of (2) e bathrms, e attic stair & water damaged interior finishes. addition of a new portable spa in rear yard. mech, elec, plumb. as req.Details
addition of (1) new roof dormer, enlarge(1) e roof dormer, modif. of a ceiling below an e roof dormer, addition of a new roof access from the e attic, renov. of (2) e bathrms, e attic stair & water damaged interior finishes. addition of a new portable spa in rear yard. mech, elec, plumb. as req. | $500,000 |
| Dec 17, 2021 | In progress issued Dec 2023 | 379 Eureka St | Martin Tynan & Son Construction, Concannon Construction Inc | ***priority ab-004 *** 3-story rear horizontal addition maintaining 45% rear yard set back. maintain 3 bedrooms and add 2.25 baths, remodel.Details
***priority ab-004 *** 3-story rear horizontal addition maintaining 45% rear yard set back. maintain 3 bedrooms and add 2.25 baths, remodel. | $450,000 |
| Oct 5, 2021 | Never finaled issued Dec 2021, no final | 560 Valencia St | interior t.i for cannabis retail with consumption area. cannabis retail approved with recorded nsr, permit #2020-006575 cua. no change in bldg area. no facade or storefront, entry or sidewalk work. it includes new mech, accessible restrms, int. partitions and finishes, equip, lighting,mep,(n) a2Details
interior t.i for cannabis retail with consumption area. cannabis retail approved with recorded nsr, permit #2020-006575 cua. no change in bldg area. no facade or storefront, entry or sidewalk work. it includes new mech, accessible restrms, int. partitions and finishes, equip, lighting,mep,(n) a2 | $450,000 | |
| Sep 8, 2021 | Completed final sign-off Feb 2023 | 36 Parnassus Av | Blair Burke General Contractors Inc | interior renovation to 2 story 2 unit residence. work only 1st/2nd fl to include new stair between 1st and 2nd fl. no exterior or facade work. no work in prow. no change useDetails
interior renovation to 2 story 2 unit residence. work only 1st/2nd fl to include new stair between 1st and 2nd fl. no exterior or facade work. no work in prow. no change use | $365,000 |
| Jul 12, 2021 | Completed final sign-off Sep 2023 | 4033 Judah St | Concore Development Group | unit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight.Details
unit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight. | $85,000 |
| May 25, 2021 | Completed final sign-off Jun 2023 | 542 Valley St | Reeb Design & Build Inc | renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure belowDetails
renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure below | $100,000 |
| Mar 4, 2021 | Completed final sign-off May 2022 | 139 Townsend St | Fisher Development Inc | 4th fl: t.i. of an (e) office space. new walls. new partition. new finishes. mechanical and electrical work.Details
4th fl: t.i. of an (e) office space. new walls. new partition. new finishes. mechanical and electrical work. | $800,000 |
| Mar 13, 2020 | Never finaled issued Dec 2021, no final | 2336 Castro St | horizontal addition. interior renovation w/ addition of (2)bedrooms & (1.5) bath. replace front & rear facade. (n) build fire sprinkler system per nfpa 13rDetails
horizontal addition. interior renovation w/ addition of (2)bedrooms & (1.5) bath. replace front & rear facade. (n) build fire sprinkler system per nfpa 13r | $800,000 | |
| Oct 23, 2019 | Completed final sign-off Aug 2023 | 262 12th Av | Doherty Restoration, Inc. | mandatory seismic strengthening per sfebc chapter 4d. 2016 cebc appendix a-4. ref pa #201910255606Details
mandatory seismic strengthening per sfebc chapter 4d. 2016 cebc appendix a-4. ref pa #201910255606 | $40,100 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 173 Christopher Dr | Avonmore Construction Inc | remodel existing bathroom on 1st floor by lowering tub, adding bigger windows and new skylight, bring electrical and plumbing to code.Details
remodel existing bathroom on 1st floor by lowering tub, adding bigger windows and new skylight, bring electrical and plumbing to code. | $20,000 |
| Dec 20, 2018 | Expired or cancelled cancelled May 2022 | 70 Lurline St | addition of dwelling unit per ordinance no 95-17Details
addition of dwelling unit per ordinance no 95-17 | $15,000 | |
| Oct 10, 2018 | Completed final sign-off Jan 2020 | 2563 15th Av | Initial Construction | remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgradesDetails
remodel to add 676 sf on lower level. build out part of lower lvl w/in (e) walls to create master bdrm/bath suite & family rm. main lvl work: remove partition btwn kitchen & breakfast rm & load-bearing wall btwn kitchen & dining. kitchen & bath remodel. closet reconfig. electrical & seismic upgrades | $200,000 |
| Oct 10, 2018 | Completed final sign-off Nov 2019 | 2563 15th Av | Initial Construction | remodel existing interior staircase between lower & upper levels. includes raising existing roof over one section of stairs & widening existing staircase to comply with current codesDetails
remodel existing interior staircase between lower & upper levels. includes raising existing roof over one section of stairs & widening existing staircase to comply with current codes | $50,000 |
| May 17, 2018 | Never finaled issued May 2018, no final | 1787 10th Av | Christopher Gate Construction Inc | revision to pa 2017-0217-9670 - replace interior stair. install skylight. remove and infill (e) light wellDetails
revision to pa 2017-0217-9670 - replace interior stair. install skylight. remove and infill (e) light well | $25,000 |
| Nov 3, 2017 | Never finaled issued Jan 2018, no final | 2551 15th Av | structural upgrade to rear extension of house at the lower levelDetails
structural upgrade to rear extension of house at the lower level | $10,000 | |
| Sep 11, 2017 | Never finaled issued Nov 2017, no final | 1787 10th Av | Dugarry Construction Inc | revision to permit #201702179670, new retaining wall & footing as per plans.Details
revision to permit #201702179670, new retaining wall & footing as per plans. | $30,000 |
| Aug 24, 2017 | Never finaled filed Aug 2017, never issued | 2585 Diamond St | to comply w/nov #201798631, revision/added to scope to pa #201705317973 - tear off existing flat roof based on bad existing framing condition. re-frame the flat roof & install new roofing membrane.Details
to comply w/nov #201798631, revision/added to scope to pa #201705317973 - tear off existing flat roof based on bad existing framing condition. re-frame the flat roof & install new roofing membrane. | $20,000 | |
| Jun 5, 2017 | Expired or cancelled cancelled Jan 2026 | 1787 10th Av | Dugarry Construction Inc | revision to pa#201702179670, foundation work in basement.Details
revision to pa#201702179670, foundation work in basement. | $20,000 |
| Feb 27, 2017 | Completed final sign-off Feb 2018 | 233 Noe St | remodel kitchen, remove bearing wall between kitchen & dining roomDetails
remodel kitchen, remove bearing wall between kitchen & dining room | $75,000 | |
| Feb 17, 2017 | Completed final sign-off May 2019 | 1787 10th Av | Dugarry Construction Inc | interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath.Details
interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath. | $67,000 |
| Dec 22, 2016 | Expired or cancelled cancelled Aug 2022 | 471 29th St | exterior cosmetic upgrades to existing residence. stucco finish to be removed and replaced with wood siding/trim @ front and rear. addition of non load bearing partition in existing garage. structural seismic upgrades per structural drawing @ garage levelDetails
exterior cosmetic upgrades to existing residence. stucco finish to be removed and replaced with wood siding/trim @ front and rear. addition of non load bearing partition in existing garage. structural seismic upgrades per structural drawing @ garage level | $10,000 | |
| Dec 12, 2016 | Completed final sign-off Jan 2018 | 679 Moultrie St | Swanson Construction | remove wall between kitchen and living rm; kitchen remodel.Details
remove wall between kitchen and living rm; kitchen remodel. | $10,500 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 14 Sanchez St | A K Construction | revision to 201608114805: change from original remodel plans, switching laundry closet with bathroom, add sink to bathroomDetails
revision to 201608114805: change from original remodel plans, switching laundry closet with bathroom, add sink to bathroom | |
| Aug 23, 2016 | Never finaled issued Aug 2016, no final | 2591 26th Av | S Mc Cann Construction Inc | revision to ref pa 201511061974: remove & replace rear foundation - approx 25'. new framining on floor joistsDetails
revision to ref pa 201511061974: remove & replace rear foundation - approx 25'. new framining on floor joists | $20,000 |
| Aug 11, 2016 | Never finaled issued Sep 2016, no final | 14 Sanchez St | A K Construction | convert unconditioned laundry room to become living space on 3/f & add toilet room - demo (e) walls, install beams and posts, frame walls for toilet, laundry. remove (e) flooring, install new hardwood flooring, drywall and paint. add plumbing for toilet in new powder roomDetails
convert unconditioned laundry room to become living space on 3/f & add toilet room - demo (e) walls, install beams and posts, frame walls for toilet, laundry. remove (e) flooring, install new hardwood flooring, drywall and paint. add plumbing for toilet in new powder room | $39,000 |
| May 31, 2016 | Completed final sign-off Nov 2018 | 1546 Underwood Av | convert (e) garage & storage space into living space. extend ground floor toward rear with the addition of one bedroom. build deck in back yard, access from kitchen, above new rear bedroom, also add another new bedroom, & bathroom & relocate laundry.Details
convert (e) garage & storage space into living space. extend ground floor toward rear with the addition of one bedroom. build deck in back yard, access from kitchen, above new rear bedroom, also add another new bedroom, & bathroom & relocate laundry. | $50,000 | |
| Nov 6, 2015 | Never finaled issued Jun 2016, no final | 2591 26th Av | S Mc Cann Construction Inc | coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ gradeDetails
coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ grade | $155,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 4831 17th St | Urban Builder General Contracting Inc | remove wall beteween kitchen and dining room & expand opening between living area. work done in conjuction with pa# 201508123995Details
remove wall beteween kitchen and dining room & expand opening between living area. work done in conjuction with pa# 201508123995 | $3,500 |
| Jul 13, 2015 | Completed final sign-off Dec 2015 | 401 13th Ti St | Baywood Building & Design Inc | bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance.Details
bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance. | $55,000 |
| Jul 10, 2014 | Completed final sign-off Jan 2015 | 681 Colby St | Trush Construction Company Inc. | reconstruct failing retaining wall at rear of property per plans & specifications.Details
reconstruct failing retaining wall at rear of property per plans & specifications. | $37,910 |
| Jan 22, 2014 | Completed final sign-off Jun 2014 | 129 Lincoln Wy | demo one transverse & one load-bearing wall, install struct reinforcements, kitchen remodle w/elect & plbg work. bath remodel-add toilet to current bath & sink to (e) split bath, enlarge window opening facing lightwell,replace windows,furnace, repair less than 50% of (e) deck (replace joists).Details
demo one transverse & one load-bearing wall, install struct reinforcements, kitchen remodle w/elect & plbg work. bath remodel-add toilet to current bath & sink to (e) split bath, enlarge window opening facing lightwell,replace windows,furnace, repair less than 50% of (e) deck (replace joists). | $100,000 | |
| Oct 25, 2013 | Completed final sign-off Nov 2013 | 929 Stanyan St | Ac And Company | reinforce/strengthen existing 3rd fl beamDetails
reinforce/strengthen existing 3rd fl beam | $4,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 815 Rhode Island St | Andrew Moore Consulting | replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total)Details
replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total) | $90,000 |
| Mar 4, 2013 | Completed final sign-off Jul 2015 | 41 Wilder St | A S C Berkeley Inc | soft story seismic upgrade persuant to administrative bulletin ab-094. installation of plywood panel and anchor sill bolts per plan.Details
soft story seismic upgrade persuant to administrative bulletin ab-094. installation of plywood panel and anchor sill bolts per plan. | $8,000 |
| Dec 28, 2012 | Completed final sign-off Jul 2014 | 2892 Harrison St | Cepheus Builders Inc | foundation replacement, basement around floor seismic strengthening, upper story wall removal.Details
foundation replacement, basement around floor seismic strengthening, upper story wall removal. | $100,000 |
| Nov 19, 2012 | Expired or cancelled cancelled Jan 2020 | 471 29th St | seismic strengthening of garage level cosmetic upgrades of front facade along 29th streetDetails
seismic strengthening of garage level cosmetic upgrades of front facade along 29th street | $15,000 | |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 2547 42nd Av | relocate front door and add small window in (e) opening. remove (e) 2'0" non-bearing wall. build 3'-0" shearwall @ front of bldg.Details
relocate front door and add small window in (e) opening. remove (e) 2'0" non-bearing wall. build 3'-0" shearwall @ front of bldg. | $9,000 | |
| Nov 2, 2012 | Completed final sign-off Jun 2013 | 2900 Washington St | Aaron Gordon Construction Inc | traditional kitchen remodel. cabinets, lighting, appliances, minor replumbing. remodel 2 baths, new tub and shower and lighting. move toilet and tub in one bath, move shower in 2nd bathDetails
traditional kitchen remodel. cabinets, lighting, appliances, minor replumbing. remodel 2 baths, new tub and shower and lighting. move toilet and tub in one bath, move shower in 2nd bath | $125,000 |
| Apr 19, 2012 | Completed final sign-off Feb 2014 | 1280 Lombard St | revision to 2011.12.14.0683 - 2 new windows and 1 french door outward opening with landing at north wall of sub garage level.Details
revision to 2011.12.14.0683 - 2 new windows and 1 french door outward opening with landing at north wall of sub garage level. | $5,000 | |
| Dec 14, 2011 | Completed final sign-off Feb 2014 | 1280 Lombard St | post removal, add windows, voluntary structural strengthening on lower level.Details
post removal, add windows, voluntary structural strengthening on lower level. | $18,000 |