Benjamin Builder
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Apr 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 1 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress filed Apr 2026, not yet issued | 593 Chenery St | remodel of (e) garage level to crestae "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft.Details
remodel of (e) garage level to crestae "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft. | $175,000 |
| Jan 13, 2026 | In progress issued May 2026 | 318 Madrid St | rear ext: remove (e)stair & siding, (n)sheathing & siding. 1/f: remove (e)kitchen, (e)inter window at (e) bath, (e)ext door at (e)family rm, (n)wider interior door to acccom eero alter 1-fire dept gr ladder access. legalize (e)bath (e)bedrm. (n)inter stair. 2/f: (n)laundry, (n)kitchen. seismic upgrDetails
rear ext: remove (e)stair & siding, (n)sheathing & siding. 1/f: remove (e)kitchen, (e)inter window at (e) bath, (e)ext door at (e)family rm, (n)wider interior door to acccom eero alter 1-fire dept gr ladder access. legalize (e)bath (e)bedrm. (n)inter stair. 2/f: (n)laundry, (n)kitchen. seismic upgr | $350,000 |
| Nov 6, 2023 | In progress issued Apr 2024 | 593 Chenery St | full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window.Details
full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window. | $225,000 |
| Sep 29, 2023 | Never finaled issued Sep 2023, no final | 593 Chenery St | demo out drywall and flooring down to stud, joist, subfloor. remove and save all appliances. remove all cabinets. 1 kitchen and 1 bath remodel. no changes to wall locations.Details
demo out drywall and flooring down to stud, joist, subfloor. remove and save all appliances. remove all cabinets. 1 kitchen and 1 bath remodel. no changes to wall locations. | $10,000 |
| Nov 25, 2020 | Never finaled issued Nov 2020, no final | 3112 Buchanan St | remove and replace (1) window 96 x 72 (same size). faces street.Details
remove and replace (1) window 96 x 72 (same size). faces street. | $2,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 15 Turquoise Wy | master bathroom: r/r shower tile & pan, floor tiles, shower valvve & triim, vanity, toilet, fixtures, outlets and switches.Details
master bathroom: r/r shower tile & pan, floor tiles, shower valvve & triim, vanity, toilet, fixtures, outlets and switches. | $12,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2022 | 92 Forest View Dr | add the playroom and bathroom on 1st flDetails
add the playroom and bathroom on 1st fl | $40,000 |
| Aug 17, 2016 | Expired or cancelled withdrawn Mar 2020 | 15 Turquoise Wy | remodel of (e) interior kitchen. work to include demo of non-structural walls and new construction, new appliances, new lighting, finishes and cabinetry. no added sq ftDetails
remodel of (e) interior kitchen. work to include demo of non-structural walls and new construction, new appliances, new lighting, finishes and cabinetry. no added sq ft | $50,000 |