Back to kitchen remodel contractors
Benjamin Builder
- Based in
- Alameda
- On San Francisco permits
- Aug 2016 to Apr 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 2 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
5 kitchen remodel permits: 1 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 138 days from filing to permit and 928 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress issued Oct 2026 | 593 Chenery St | remodel of (e) garage level to create "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft.Details
remodel of (e) garage level to create "rooms down" within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior door per exterior window schedule,(n) interior finishes & electrical work. area of "rooms down" is 492 sq ft. | $175,000 |
| Jan 13, 2026 | In progress issued May 2026 | 318 Madrid St | rear ext: remove (e)stair & siding, (n)sheathing & siding. 1/f: remove (e)kitchen, (e)inter window at (e) bath, (e)ext door at (e)family rm, (n)wider interior door to acccom eero alter 1-fire dept gr ladder access. legalize (e)bath (e)bedrm. (n)inter stair. 2/f: (n)laundry, (n)kitchen. seismic upgrDetails
rear ext: remove (e)stair & siding, (n)sheathing & siding. 1/f: remove (e)kitchen, (e)inter window at (e) bath, (e)ext door at (e)family rm, (n)wider interior door to acccom eero alter 1-fire dept gr ladder access. legalize (e)bath (e)bedrm. (n)inter stair. 2/f: (n)laundry, (n)kitchen. seismic upgr | $350,000 |
| Nov 6, 2023 | Completed final sign-off Nov 2026 | 593 Chenery St | full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window.Details
full interior renovation of main level (1,358 sf).relocate kitchen, addition of full bathroom at rear in existing footprint, remodel (e)bath, insulation of exterior walls, roof and floor structure, (n) electrical wiring throughout,(n) exterior windows- replace "in kind" (n) exterior window. | $225,000 |
| Sep 29, 2023 | Never finaled issued Sep 2023, no final | 593 Chenery St | demo out drywall and flooring down to stud, joist, subfloor. remove and save all appliances. remove all cabinets. 1 kitchen and 1 bath remodel. no changes to wall locations.Details
demo out drywall and flooring down to stud, joist, subfloor. remove and save all appliances. remove all cabinets. 1 kitchen and 1 bath remodel. no changes to wall locations. | $10,000 |
| Aug 17, 2016 | Expired or cancelled withdrawn Mar 2020 | 15 Turquoise Wy | remodel of (e) interior kitchen. work to include demo of non-structural walls and new construction, new appliances, new lighting, finishes and cabinetry. no added sq ftDetails
remodel of (e) interior kitchen. work to include demo of non-structural walls and new construction, new appliances, new lighting, finishes and cabinetry. no added sq ft | $50,000 |