Permit GraphShortlistSan Francisco building permits since 2000

Block 0405, lot 004

502 Jefferson St

City’s use
Miscellaneous/Mixed-Use
Lot
81,800 sq ft
Zoning
P
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

13 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 11, 2026In progress
issued Mar 2026
502 Jefferson StRossi Builders Inc.deferred mechanical, electrical and plumbing for pa #2022-1011-4038
Details
Permit
202602115709
Status
issued
Filed
Feb 11, 2026
Permit issued
Mar 26, 2026
Declared cost
$300,000
Address
502 Jefferson St

deferred mechanical, electrical and plumbing for pa #2022-1011-4038

Open the permit page

$300,000
Sep 25, 2025Completed
final sign-off Jun 2026
502 Jefferson StPribuss Engineering Incmodify sprinkler head locations to accommodate new elevator shaft, decks and partition layout. new was 22 total heads 27 ref pa 202210114038
Details
Permit
202509256079
Status
complete
Filed
Sep 25, 2025
Permit issued
Oct 1, 2025
Final sign-off
Jun 25, 2026
Declared cost
$1,050
Address
502 Jefferson St

modify sprinkler head locations to accommodate new elevator shaft, decks and partition layout. new was 22 total heads 27 ref pa 202210114038

Open the permit page

$1,050
May 3, 2024In progress
issued Oct 2025
502 Jefferson StRossi Builders Inc.install new exterior sauna room at existing deck (at grade)
Details
Permit
202405031358
Status
issued
Filed
May 3, 2024
Permit issued
Oct 1, 2025
Declared cost
$40,000
Address
502 Jefferson St

install new exterior sauna room at existing deck (at grade)

Open the permit page

$40,000
Oct 12, 2023Completed
final sign-off Feb 2024
500 Jefferson StBay Alarm Companyconverting existing dact to allow cellular communicator all existing fire alarm components and sequence of operation shall remain unchanged.
Details
Permit
202310128542
Status
complete
Filed
Oct 12, 2023
Permit issued
Oct 12, 2023
Final sign-off
Feb 28, 2024
Declared cost
$1,500
Address
500 Jefferson St

converting existing dact to allow cellular communicator all existing fire alarm components and sequence of operation shall remain unchanged.

Open the permit page

$1,500
May 31, 2023Completed
final sign-off Jul 2023
500 Jefferson StTom Lee Roofing Inc.reroofing
Details
Permit
202305318863
Status
complete
Filed
May 31, 2023
Permit issued
May 31, 2023
Final sign-off
Jul 20, 2023
Declared cost
$100,600
Address
500 Jefferson St

reroofing

Open the permit page

$100,600
Jan 30, 2023Completed
final sign-off May 2023
502 Jefferson StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system tenant improvements, add 5 sidewall sprinkler on shed behind restaurant
Details
Permit
202301300959
Status
complete
Filed
Jan 30, 2023
Permit issued
Jan 30, 2023
Final sign-off
May 30, 2023
Declared cost
$3,000
Address
502 Jefferson St

existing fire sprinkler system tenant improvements, add 5 sidewall sprinkler on shed behind restaurant

Open the permit page

$3,000
Oct 11, 2022In progress
issued Feb 2024
502 Jefferson StRossi Builders Inc.exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola
Details
Permit
202210114038
Status
issued
Filed
Oct 11, 2022
Permit issued
Feb 8, 2024
Declared cost
$1,252,000
Address
502 Jefferson St

exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola

Open the permit page

$1,252,000
Aug 5, 2020Completed
final sign-off Sep 2020
500 Jefferson StBull Constructionreplace existing, rotten, ship lap siding with new, to match. 210 sq. ft. to be replaced. the elevation is at the extreme rear of the building, west elevation. the bump out, foundation to eve measures 9' x 20'.
Details
Permit
202008051128
Status
complete
Filed
Aug 5, 2020
Permit issued
Aug 11, 2020
Final sign-off
Sep 1, 2020
Declared cost
$1,500
Address
500 Jefferson St

replace existing, rotten, ship lap siding with new, to match. 210 sq. ft. to be replaced. the elevation is at the extreme rear of the building, west elevation. the bump out, foundation to eve measures 9' x 20'.

Open the permit page

$1,500
Jul 3, 2019Completed
final sign-off Aug 2021
502 Jefferson StBryan Michelsen Constructionrepair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same.
Details
Permit
201907035072
Status
complete
Filed
Jul 3, 2019
Permit issued
Sep 24, 2020
Final sign-off
Aug 12, 2021
Declared cost
$25,000
Address
502 Jefferson St

repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same.

Open the permit page

$25,000
Oct 25, 2017Completed
final sign-off Nov 2017
500 Jefferson StBay Alarm Companyrevision to original fire alarm plans excluding elevator equipment. ref pa #2501703232185. maher na
Details
Permit
201710252186
Status
complete
Filed
Oct 25, 2017
Permit issued
Oct 25, 2017
Final sign-off
Nov 7, 2017
Address
500 Jefferson St

revision to original fire alarm plans excluding elevator equipment. ref pa #2501703232185. maher na

Open the permit page

Mar 23, 2017Completed
final sign-off Nov 2017
500 Jefferson StBay Alarm Companysprinkler monitoring ansul monitoring elevator recall replacement system ref 201311141911
Details
Permit
201703232185
Status
complete
Filed
Mar 23, 2017
Permit issued
Mar 30, 2017
Final sign-off
Nov 7, 2017
Declared cost
$7,688
Address
500 Jefferson St

sprinkler monitoring ansul monitoring elevator recall replacement system ref 201311141911

Open the permit page

$7,688
Oct 17, 2016Completed
final sign-off Apr 2017
502 Jefferson StMatthew P Leffersremodel 2 extg baths, 1 fully accessible and 1 useable(meets 2010 code), and install mop sink. n/a for maher
Details
Permit
201610170443
Status
complete
Filed
Oct 17, 2016
Permit issued
Nov 21, 2016
Final sign-off
Apr 25, 2017
Declared cost
$5,500
Address
502 Jefferson St

remodel 2 extg baths, 1 fully accessible and 1 useable(meets 2010 code), and install mop sink. n/a for maher

Open the permit page

$5,500
Oct 5, 2016Completed
final sign-off Jun 2018
500 Jefferson StBellcore Construction Incada guard at c1 water fountain. ada door actuator to gym, lightweight build up on e ramp, step at e patio, new openings (interior), new climate seal door ramp. n/a for maher.
Details
Permit
201610059610
Status
complete
Filed
Oct 5, 2016
Permit issued
Oct 5, 2016
Final sign-off
Jun 6, 2018
Declared cost
$30,500
Address
500 Jefferson St

ada guard at c1 water fountain. ada door actuator to gym, lightweight build up on e ramp, step at e patio, new openings (interior), new climate seal door ramp. n/a for maher.

Open the permit page

$30,500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Rossi Builders Inc. (3), Bay Alarm Company (2), Anderson, Rowe & Buckley, Inc., Bay Alarm Company, Bellcore Construction Inc, Bryan Michelsen Construction, Bull Construction, Matthew P Leffers, Pribuss Engineering Inc, Tom Lee Roofing Inc.
Architects
Mark Thomas (2), Craig Laws, Edward Lee Hammack, Luke Ogrydziak
Engineers
David Yadegar (2), Meng Hsiu Chen, Mohamad Sabbah

Find contractors for work like this