Bryan Michelsen Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Apr 2002 to Feb 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2026 | Completed final sign-off Sep 2026 | 2320 Broadway | to obtain final inspection for work approved under 202402015090. all work is completeDetails
to obtain final inspection for work approved under 202402015090. all work is complete | |
| Jan 14, 2026 | Completed final sign-off Sep 2026 | 2322 Broadway | to obtain final inspection for work approved under pa # 202402015090. all work is complete.Details
to obtain final inspection for work approved under pa # 202402015090. all work is complete. | |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 2320 Broadway | fix dryrot and window leak in front. windows stay same. replace with stucco. all "old dental soffet" to remain as well as look of house. estimated total of 1,100 sq.ft. of stucco.Details
fix dryrot and window leak in front. windows stay same. replace with stucco. all "old dental soffet" to remain as well as look of house. estimated total of 1,100 sq.ft. of stucco. | $50,000 |
| Feb 1, 2024 | Completed final sign-off Jul 2026 | 2322 Broadway | replace (e) wood siding to stucco @ sides and back of building. no work at front of building. approx 2500 sqftDetails
replace (e) wood siding to stucco @ sides and back of building. no work at front of building. approx 2500 sqft | $25,000 |
| Dec 13, 2022 | In progress issued Nov 2023 | 2320 Broadway | interior remodel on third floor.Details
interior remodel on third floor. | $75,000 |
| Dec 9, 2022 | Completed final sign-off Sep 2026 | 2322 Broadway | infill & interior alteration on 4th & 3rd floor impacting upper unit.Details
infill & interior alteration on 4th & 3rd floor impacting upper unit. | $175,000 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 2431 Filbert St | hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019Details
hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019 | $20,000 |
| May 13, 2021 | Completed final sign-off Jun 2021 | 3133 Octavia St | to correct address number under pa #202104289460 - change from unit 3135 to unit 3133Details
to correct address number under pa #202104289460 - change from unit 3135 to unit 3133 | |
| Apr 28, 2021 | Never finaled issued Apr 2021, no final | 3135 Octavia St | move water heater out of kitchen. add light and ceiling soffit wired. smoke detectors in all bedrooms. add two foot cabinet.Details
move water heater out of kitchen. add light and ceiling soffit wired. smoke detectors in all bedrooms. add two foot cabinet. | $20,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2025 | 159 10th Av | addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rainDetails
addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rain | $325,000 |
| Feb 2, 2021 | Never finaled issued Feb 2021, no final | 3131 Octavia St | move water hearter out of kitchen to (e) laundry room with (e) gas dryer. add lights and ceiling soffit. wired smoke detectors in al bedroms. add two foot cabinet at location of original wate rheater. maintain 1 hr separatoin between units at area of workDetails
move water hearter out of kitchen to (e) laundry room with (e) gas dryer. add lights and ceiling soffit. wired smoke detectors in al bedroms. add two foot cabinet at location of original wate rheater. maintain 1 hr separatoin between units at area of work | $20,000 |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 1738 Bay St | street spaceDetails
street space | |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 692 Valencia St | street spaceDetails
street space | |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 3127 Octavia St | street spaceDetails
street space | |
| Sep 25, 2019 | Completed final sign-off Mar 2023 | 1870 Union St | modify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion.Details
modify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion. | $40,000 |
| Aug 1, 2019 | Never finaled issued Aug 2019, no final | 3328 California St | replace cabinets & countertops in kitchen.Details
replace cabinets & countertops in kitchen. | $20,000 |
| Jul 31, 2019 | Completed final sign-off Nov 2022 | 694 Valencia St | structural repair due to sloping. add posts and beam. no architectural changesDetails
structural repair due to sloping. add posts and beam. no architectural changes | $10,000 |
| Jul 3, 2019 | Completed final sign-off Aug 2021 | 502 Jefferson St | repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same.Details
repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same. | $25,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 692 Valencia St | remove kitchen cabinet and replace in kind. upgrade electrical & plumbing. remove fixture in 2 bathrooms. replace in kind. retile, add new furnace. to comply with complaint #201604221. 300 sq ft.Details
remove kitchen cabinet and replace in kind. upgrade electrical & plumbing. remove fixture in 2 bathrooms. replace in kind. retile, add new furnace. to comply with complaint #201604221. 300 sq ft. | $80,000 |
| Mar 15, 2019 | Never finaled issued Apr 2019, no final | 751 Duncan St | partial garage conversion to full bathroom. rework of mechanical /electrical/plumbing equipment. new demiging walls and finishes. new electrical fixtures and plumbing equipment. patch and repair (e) finished from work.Details
partial garage conversion to full bathroom. rework of mechanical /electrical/plumbing equipment. new demiging walls and finishes. new electrical fixtures and plumbing equipment. patch and repair (e) finished from work. | $15,000 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 3127 Octavia St | kitchen and 1/2 bath remodel. replace 1/2 bath tile, replace kitchen cabinets, countertops and sink. replace and fix. all work in 3127 on second level.Details
kitchen and 1/2 bath remodel. replace 1/2 bath tile, replace kitchen cabinets, countertops and sink. replace and fix. all work in 3127 on second level. | $20,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 1740 Bay St | replace fire work damaged kitchen in kind. replace tile in two bathrooms. fix damaged porch.Details
replace fire work damaged kitchen in kind. replace tile in two bathrooms. fix damaged porch. | $50,000 |
| Oct 9, 2018 | Never finaled issued Dec 2019, no final | 2425 Filbert St | addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck.Details
addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck. | $400,000 |
| May 7, 2018 | Completed final sign-off Dec 2019 | 1738 Bay St | remodel fire damaged kitchen in kind, water damaged ceiling in front room hallway and bedroom to be replaced. upstairs bathroom replaced, any broken windows replaced.Details
remodel fire damaged kitchen in kind, water damaged ceiling in front room hallway and bedroom to be replaced. upstairs bathroom replaced, any broken windows replaced. | $300,000 |
| Feb 21, 2018 | Completed final sign-off Feb 2018 | 2754 Octavia St | to obtain final inspection for work approved under pa # 200008258959, 200008188261. all work is complete; n/a maherDetails
to obtain final inspection for work approved under pa # 200008258959, 200008188261. all work is complete; n/a maher | |
| Feb 21, 2018 | Completed final sign-off Feb 2018 | 2754 Octavia St | to obtain final inspection for work approved under pa # 200011014642, 200007185405. all work is complete; n/a maherDetails
to obtain final inspection for work approved under pa # 200011014642, 200007185405. all work is complete; n/a maher | |
| Nov 20, 2017 | Never finaled issued Jan 2019, no final | 3127 Octavia St | site permit for adu. three studio, 1 bath, 1 kitch each, bicycle parking. per ordinance no 162-16, ref #201707252932. fire sprinklers under separate permit.Details
site permit for adu. three studio, 1 bath, 1 kitch each, bicycle parking. per ordinance no 162-16, ref #201707252932. fire sprinklers under separate permit. | $120,000 |
| Aug 1, 2017 | Never finaled issued Nov 2017, no final | 2006 Powell St | revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maherDetails
revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maher | $20,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2022 | 3127 Octavia St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $40,000 |
| Jun 15, 2017 | Completed final sign-off Jul 2017 | 751 Duncan St | to obtain final inspection for work approved under pa#2014-02-24-9183, 2014-05-16-5998, 2014-03-05-9889. all work is complete.Details
to obtain final inspection for work approved under pa#2014-02-24-9183, 2014-05-16-5998, 2014-03-05-9889. all work is complete. | |
| May 4, 2017 | Never finaled issued May 2017, no final | 2006 Powell St | revision to pa #201605137368 - reduce excavation at rear yard; remove (n) retaining walls at rear yard from scope of work; reconfigure (n) bath at 1st flr; relocate (n) slidign door + add (n) window at 1st flr; revise scope of demo (e) walls + floors. n/a maher ordinanceDetails
revision to pa #201605137368 - reduce excavation at rear yard; remove (n) retaining walls at rear yard from scope of work; reconfigure (n) bath at 1st flr; relocate (n) slidign door + add (n) window at 1st flr; revise scope of demo (e) walls + floors. n/a maher ordinance | |
| Jan 26, 2017 | Expired or cancelled expired Jan 2025 | 159 10th Av | replace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work.Details
replace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work. | $10,000 |
| Sep 8, 2016 | Never finaled issued Sep 2016, no final | 200 Maywood Dr | replace kitchen cabinets, install he lighting and install new appliancesDetails
replace kitchen cabinets, install he lighting and install new appliances | $25,000 |
| Sep 30, 2015 | Completed final sign-off May 2017 | 826 Diamond St | revision to pa#201412173939, repair 7' existing foundation north & south walls. as built conditions.Details
revision to pa#201412173939, repair 7' existing foundation north & south walls. as built conditions. | |
| Dec 17, 2014 | Completed final sign-off May 2017 | 826 Diamond St | horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.Details
horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2. | $350,000 |
| May 16, 2014 | Never finaled issued May 2014, no final | 751 Duncan St | replace existing bay window (left side) with rectangular bay. replace right bay with slider. lower roof lineDetails
replace existing bay window (left side) with rectangular bay. replace right bay with slider. lower roof line | $10,000 |
| Mar 27, 2014 | Expired or cancelled withdrawn Jun 2017 | 751 Duncan St | install two bay windows.Details
install two bay windows. | $9,000 |
| Mar 5, 2014 | Never finaled issued Mar 2014, no final | 751 Duncan St | revision to permit app # 201402249183. provide slope retile bathroom and change fixtures, insulation, fix current sag and looks use 2x10.Details
revision to permit app # 201402249183. provide slope retile bathroom and change fixtures, insulation, fix current sag and looks use 2x10. | $15,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 751 Duncan St | remove walls in living room and install wood beams & post. in addition, remodel the kitchen.Details
remove walls in living room and install wood beams & post. in addition, remodel the kitchen. | $12,000 |
| Aug 15, 2013 | Completed final sign-off Mar 2014 | 2533 Greenwich St | tear out kitchen cbas & replace in kind. replace master bath cab and shower tile, replace hall bath tile.Details
tear out kitchen cbas & replace in kind. replace master bath cab and shower tile, replace hall bath tile. | $50,000 |
| Jun 6, 2013 | Expired or cancelled expired Dec 2015 | 387 Eureka St | tear out (e) kitchen cabinets & replace. put in new he lights, new appliances & fix skylight. tear out bathroom tile & replace fixtures & tile. replace door with 6' sliding door off kitchenDetails
tear out (e) kitchen cabinets & replace. put in new he lights, new appliances & fix skylight. tear out bathroom tile & replace fixtures & tile. replace door with 6' sliding door off kitchen | $35,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 2320 Broadway | to obtain final inspection for work approved under pa # 201008048152. all work is complete.Details
to obtain final inspection for work approved under pa # 201008048152. all work is complete. | |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 2320 Broadway | to obtain final inspection for work approved under pa # 200909146736. all work is complete.Details
to obtain final inspection for work approved under pa # 200909146736. all work is complete. | |
| Feb 14, 2012 | Completed final sign-off Mar 2012 | 2320 Broadway | to obtain final inspection for work approved under pa#200810224817 all work is completed.Details
to obtain final inspection for work approved under pa#200810224817 all work is completed. | |
| Jul 5, 2011 | Expired or cancelled expired Aug 2012 | 2008 Powell St | upper unit. kitchen remodel, new popwder rm, enlarge closet in bedroom, remove non bearing wall btw kitchen and dining.Details
upper unit. kitchen remodel, new popwder rm, enlarge closet in bedroom, remove non bearing wall btw kitchen and dining. | $30,000 |
| May 24, 2011 | Never finaled issued Oct 2011, no final | 1301 Diamond St | addition of approximated 475 sq ft @ 1st floor for new master bedroom suite. renovation of living room & dining room exterior wall @ 2nd floor.Details
addition of approximated 475 sq ft @ 1st floor for new master bedroom suite. renovation of living room & dining room exterior wall @ 2nd floor. | $250,000 |
| Sep 17, 2010 | Never finaled issued Sep 2010, no final | 221 Fair Oaks St | fix dry-rot on front of house. fix window on side. replace stucco in-kind, no alteration of look. eliminate steel beams in garage keep as is ref. 200309306155Details
fix dry-rot on front of house. fix window on side. replace stucco in-kind, no alteration of look. eliminate steel beams in garage keep as is ref. 200309306155 | $3,000 |
| Sep 17, 2010 | Never finaled issued Sep 2010, no final | 221 Fair Oaks St | to obtain final inspection for work approved under pa#2003102180254 all work is complete.Details
to obtain final inspection for work approved under pa#2003102180254 all work is complete. | |
| Sep 17, 2010 | Never finaled issued Sep 2010, no final | 221 Fair Oaks St | to obtain final inspection for work approved under pa#200309306155 all work is complete.Details
to obtain final inspection for work approved under pa#200309306155 all work is complete. | |
| Mar 8, 2010 | Expired or cancelled cancelled Jan 2026 | 2320 Broadway | replace leaking siding and flashing and stucco. window trim replaced in kindDetails
replace leaking siding and flashing and stucco. window trim replaced in kind | $40,000 |
| Sep 14, 2009 | Never finaled issued Sep 2009, no final | 2320 Broadway | revision to application 200810224817 s-1. alteration of seismic lateral resistance system. shifted location on the steel movement frame.Details
revision to application 200810224817 s-1. alteration of seismic lateral resistance system. shifted location on the steel movement frame. | |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 1316 Fulton St | replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946.Details
replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946. | $15,000 |
| Feb 25, 2009 | Completed final sign-off May 2009 | 4634 18th St | revision to pa #200901200478, relocate non-bearing closet walls in bathrooms to allow for new tub, move plumbing fixtures & wall between bathrooms for both units.Details
revision to pa #200901200478, relocate non-bearing closet walls in bathrooms to allow for new tub, move plumbing fixtures & wall between bathrooms for both units. | $2,000 |
| Jan 20, 2009 | Completed final sign-off May 2009 | 4634 18th St | work @ both units. remove & replace fixtures & tile in one bathroom each in both units. non structural.Details
work @ both units. remove & replace fixtures & tile in one bathroom each in both units. non structural. | $25,000 |
| Oct 22, 2008 | Never finaled issued May 2009, no final | 2320 Broadway | expansion of kitchen, kitchen & bath remodel, demo const of 1st fl int walls, install new windows & doors, demo & install new door & windows at 2nd fl. demo of wall & const new forexpansion of kitchen & storage.Details
expansion of kitchen, kitchen & bath remodel, demo const of 1st fl int walls, install new windows & doors, demo & install new door & windows at 2nd fl. demo of wall & const new forexpansion of kitchen & storage. | $60,000 |
| Aug 1, 2008 | Completed final sign-off Apr 2009 | 1316 Fulton St | revision to pa# 2008/03/12/6946 to relocate partitions on 1st and 2nd floor and modify 1st floor kitchen and bathroomDetails
revision to pa# 2008/03/12/6946 to relocate partitions on 1st and 2nd floor and modify 1st floor kitchen and bathroom | $10,000 |
| Jan 29, 2008 | Completed final sign-off Apr 2009 | 1316 Fulton St | replace 2nd unit kitchen and bath. open-up corner lightwell on 2nd floor investigate water damage & unitigate. replace in kind. no structural work.Details
replace 2nd unit kitchen and bath. open-up corner lightwell on 2nd floor investigate water damage & unitigate. replace in kind. no structural work. | $50,000 |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 435 Union St | renew eprmtis 200308182342 20050427987 200506296383 200601242841Details
renew eprmtis 200308182342 20050427987 200506296383 200601242841 | |
| Feb 17, 2006 | Completed final sign-off Aug 2006 | 456 Lake St | add 8x8 dormer to extg bathroom permit #1071957 work on unit 456 lake stDetails
add 8x8 dormer to extg bathroom permit #1071957 work on unit 456 lake st | $2,000 |
| Jan 24, 2006 | Never finaled issued Jan 2006, no final | 435 Union St | renew pa# 2003/08/18/2342, pa# 2005/04/27/0987 & pa# 2005/06/29/6382. add $30,000 to valuation of job.Details
renew pa# 2003/08/18/2342, pa# 2005/04/27/0987 & pa# 2005/06/29/6382. add $30,000 to valuation of job. | $30,000 |
| Nov 9, 2005 | Completed final sign-off Aug 2006 | 452 Lake St | remodel upstairs bathroom and closet 3rd floop topDetails
remodel upstairs bathroom and closet 3rd floop top | $15,000 |
| Oct 18, 2005 | Completed final sign-off Aug 2006 | 456 Lake St | remodel downstairs bathrom, remove bathtub & replace w/shower. retile. one bath remodelDetails
remodel downstairs bathrom, remove bathtub & replace w/shower. retile. one bath remodel | $6,000 |
| Jun 29, 2005 | Never finaled issued Jun 2005, no final | 435 Union St | repari (e) rear foundation dry rot porches, 5.5x20 per inspector direction dtd. 5/26/05, bew ftg,Details
repari (e) rear foundation dry rot porches, 5.5x20 per inspector direction dtd. 5/26/05, bew ftg, | $21,550 |
| Jun 3, 2005 | Completed final sign-off Jul 2007 | 1778 Green St | combine top 2 floors to be 1 unit.add large garden unit in garage l evel.extend 21'into rear yard 1 story. project review pre app w/ planning on 02/09 with david lindsey gave initial ok.Details
combine top 2 floors to be 1 unit.add large garden unit in garage l evel.extend 21'into rear yard 1 story. project review pre app w/ planning on 02/09 with david lindsey gave initial ok. | $120,400 |
| Apr 27, 2005 | Never finaled issued Apr 2005, no final | 435 Union St | remove existing bath fixtures-fix dyro rot & replace all new tile 2nd & 3rd floor. no structural. reDetails
remove existing bath fixtures-fix dyro rot & replace all new tile 2nd & 3rd floor. no structural. re | $12,000 |
| Jul 28, 2004 | Completed final sign-off May 2005 | 123 23rd Av | recess garage door 4' from existing approved position- revisions to pa 200306247799 & 200407088351Details
recess garage door 4' from existing approved position- revisions to pa 200306247799 & 200407088351 | $2,000 |
| Jul 8, 2004 | Completed final sign-off May 2005 | 123 23rd Av | pour foundation in 5 section w/first pour holding back sand/soil to support existing foundation. revDetails
pour foundation in 5 section w/first pour holding back sand/soil to support existing foundation. rev | $70,000 |
| May 13, 2004 | Completed final sign-off Dec 2004 | 25 Prosper St | reroofing-correct description to app 200311180443Details
reroofing-correct description to app 200311180443 | $5,000 |
| Apr 7, 2004 | Completed final sign-off Oct 2005 | 138 Peralta Av | horizontal addition- fill in side yard at kitchen 42 sf, add/relocate (e) deck & reconfigure (e) extDetails
horizontal addition- fill in side yard at kitchen 42 sf, add/relocate (e) deck & reconfigure (e) ext | $22,570 |
| Mar 3, 2004 | Completed final sign-off Dec 2004 | 25 Prosper St | cap (e) footings with new stem wall to replace old concreteDetails
cap (e) footings with new stem wall to replace old concrete | $10,000 |
| Nov 18, 2003 | Completed final sign-off Dec 2004 | 25 Prosper St | reroof. add plywood sheathing 1/2" cccd, 6"occ edge,12"o.c. @ field 8d's as needed. open up wallsDetails
reroof. add plywood sheathing 1/2" cccd, 6"occ edge,12"o.c. @ field 8d's as needed. open up walls | $11,000 |
| Nov 18, 2003 | Completed final sign-off Mar 2004 | 639 Shields St | tear out kitchen cabinets & replace in kind. bring electrical up to code. tear out bathrm tile &Details
tear out kitchen cabinets & replace in kind. bring electrical up to code. tear out bathrm tile & | $15,000 |
| Oct 21, 2003 | Never finaled issued Aug 2004, no final | 221 Fair Oaks St | add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/Details
add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/ | $40,720 |
| Sep 16, 2003 | Completed final sign-off Nov 2003 | 1880 Jackson St | remodel bathroom. replace existing fixtures with same. add fan & recepticlesDetails
remodel bathroom. replace existing fixtures with same. add fan & recepticles | $9,000 |
| Aug 18, 2003 | Never finaled issued Nov 2004, no final | 435 Union St | add garage space in existing basement. provide new garage door, curb cutsDetails
add garage space in existing basement. provide new garage door, curb cuts | $33,000 |
| Mar 31, 2003 | Completed final sign-off Dec 2004 | 25 Prosper St | add 2nd unit @ g/fl (1 bedrm/1 living rokm/1 bath/1 kitchen-utility rm) remodel upstair unit,Details
add 2nd unit @ g/fl (1 bedrm/1 living rokm/1 bath/1 kitchen-utility rm) remodel upstair unit, | $75,000 |
| Jan 9, 2003 | Completed final sign-off Oct 2003 | 136 Peralta Av | changes to approved plans, provide drawings for (e)footing,framing & dry rot repair(200204032982)Details
changes to approved plans, provide drawings for (e)footing,framing & dry rot repair(200204032982) | $5,000 |
| Nov 6, 2002 | Completed final sign-off Jan 2003 | 1880 Jackson St | relocate service to mechanical roomDetails
relocate service to mechanical room | $2,000 |
| Oct 21, 2002 | Completed final sign-off Dec 2002 | 456 Castro St | to renew app#2002/06/10/8655 for final inspection.Details
to renew app#2002/06/10/8655 for final inspection. | |
| Oct 15, 2002 | Completed final sign-off Jan 2003 | 1880 Jackson St | replace exist kitchen cabinets and counter tops.Details
replace exist kitchen cabinets and counter tops. | $10,000 |
| Jun 5, 2002 | Completed final sign-off Nov 2002 | 2235 Beach St | tearout extg tile and fixture in 2 bthrm and replace/ add new steam in mstr bth at unit #302Details
tearout extg tile and fixture in 2 bthrm and replace/ add new steam in mstr bth at unit #302 | $15,000 |
| Apr 3, 2002 | Completed final sign-off Oct 2003 | 136 Peralta Av | relocate a unit to lower level. combine exsiting 1st & 2nd flr as one unit. fill-in on existing 1stDetails
relocate a unit to lower level. combine exsiting 1st & 2nd flr as one unit. fill-in on existing 1st | $69,800 |