Bryan Michelsen Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Apr 2002 to Feb 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 never finaled. Typically 294 days from filing to permit and 713 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2021 | Completed final sign-off Jan 2025 | 159 10th Av | addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rainDetails
addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rain | $325,000 |
| Dec 17, 2014 | Completed final sign-off May 2017 | 826 Diamond St | horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.Details
horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2. | $350,000 |
| Apr 7, 2004 | Completed final sign-off Oct 2005 | 138 Peralta Av | horizontal addition- fill in side yard at kitchen 42 sf, add/relocate (e) deck & reconfigure (e) extDetails
horizontal addition- fill in side yard at kitchen 42 sf, add/relocate (e) deck & reconfigure (e) ext | $22,570 |
| Oct 21, 2003 | Never finaled issued Aug 2004, no final | 221 Fair Oaks St | add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/Details
add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/ | $40,720 |