Back to bathroom remodel contractors
Bryan Michelsen Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Apr 2002 to Feb 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 15 completed, 8 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 295 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2021 | Completed final sign-off Jan 2025 | 159 10th Av | addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rainDetails
addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rain | $325,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 692 Valencia St | remove kitchen cabinet and replace in kind. upgrade electrical & plumbing. remove fixture in 2 bathrooms. replace in kind. retile, add new furnace. to comply with complaint #201604221. 300 sq ft.Details
remove kitchen cabinet and replace in kind. upgrade electrical & plumbing. remove fixture in 2 bathrooms. replace in kind. retile, add new furnace. to comply with complaint #201604221. 300 sq ft. | $80,000 |
| Mar 15, 2019 | Never finaled issued Apr 2019, no final | 751 Duncan St | partial garage conversion to full bathroom. rework of mechanical /electrical/plumbing equipment. new demiging walls and finishes. new electrical fixtures and plumbing equipment. patch and repair (e) finished from work.Details
partial garage conversion to full bathroom. rework of mechanical /electrical/plumbing equipment. new demiging walls and finishes. new electrical fixtures and plumbing equipment. patch and repair (e) finished from work. | $15,000 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 3127 Octavia St | kitchen and 1/2 bath remodel. replace 1/2 bath tile, replace kitchen cabinets, countertops and sink. replace and fix. all work in 3127 on second level.Details
kitchen and 1/2 bath remodel. replace 1/2 bath tile, replace kitchen cabinets, countertops and sink. replace and fix. all work in 3127 on second level. | $20,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 1740 Bay St | replace fire work damaged kitchen in kind. replace tile in two bathrooms. fix damaged porch.Details
replace fire work damaged kitchen in kind. replace tile in two bathrooms. fix damaged porch. | $50,000 |
| May 7, 2018 | Completed final sign-off Dec 2019 | 1738 Bay St | remodel fire damaged kitchen in kind, water damaged ceiling in front room hallway and bedroom to be replaced. upstairs bathroom replaced, any broken windows replaced.Details
remodel fire damaged kitchen in kind, water damaged ceiling in front room hallway and bedroom to be replaced. upstairs bathroom replaced, any broken windows replaced. | $300,000 |
| Nov 20, 2017 | Never finaled issued Jan 2019, no final | 3127 Octavia St | site permit for adu. three studio, 1 bath, 1 kitch each, bicycle parking. per ordinance no 162-16, ref #201707252932. fire sprinklers under separate permit.Details
site permit for adu. three studio, 1 bath, 1 kitch each, bicycle parking. per ordinance no 162-16, ref #201707252932. fire sprinklers under separate permit. | $120,000 |
| Aug 1, 2017 | Never finaled issued Nov 2017, no final | 2006 Powell St | revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maherDetails
revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maher | $20,000 |
| May 4, 2017 | Never finaled issued May 2017, no final | 2006 Powell St | revision to pa #201605137368 - reduce excavation at rear yard; remove (n) retaining walls at rear yard from scope of work; reconfigure (n) bath at 1st flr; relocate (n) slidign door + add (n) window at 1st flr; revise scope of demo (e) walls + floors. n/a maher ordinanceDetails
revision to pa #201605137368 - reduce excavation at rear yard; remove (n) retaining walls at rear yard from scope of work; reconfigure (n) bath at 1st flr; relocate (n) slidign door + add (n) window at 1st flr; revise scope of demo (e) walls + floors. n/a maher ordinance | |
| Dec 17, 2014 | Completed final sign-off May 2017 | 826 Diamond St | horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.Details
horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2. | $350,000 |
| Mar 5, 2014 | Never finaled issued Mar 2014, no final | 751 Duncan St | revision to permit app # 201402249183. provide slope retile bathroom and change fixtures, insulation, fix current sag and looks use 2x10.Details
revision to permit app # 201402249183. provide slope retile bathroom and change fixtures, insulation, fix current sag and looks use 2x10. | $15,000 |
| Aug 15, 2013 | Completed final sign-off Mar 2014 | 2533 Greenwich St | tear out kitchen cbas & replace in kind. replace master bath cab and shower tile, replace hall bath tile.Details
tear out kitchen cbas & replace in kind. replace master bath cab and shower tile, replace hall bath tile. | $50,000 |
| Jun 6, 2013 | Expired or cancelled expired Dec 2015 | 387 Eureka St | tear out (e) kitchen cabinets & replace. put in new he lights, new appliances & fix skylight. tear out bathroom tile & replace fixtures & tile. replace door with 6' sliding door off kitchenDetails
tear out (e) kitchen cabinets & replace. put in new he lights, new appliances & fix skylight. tear out bathroom tile & replace fixtures & tile. replace door with 6' sliding door off kitchen | $35,000 |
| Feb 25, 2009 | Completed final sign-off May 2009 | 4634 18th St | revision to pa #200901200478, relocate non-bearing closet walls in bathrooms to allow for new tub, move plumbing fixtures & wall between bathrooms for both units.Details
revision to pa #200901200478, relocate non-bearing closet walls in bathrooms to allow for new tub, move plumbing fixtures & wall between bathrooms for both units. | $2,000 |
| Jan 20, 2009 | Completed final sign-off May 2009 | 4634 18th St | work @ both units. remove & replace fixtures & tile in one bathroom each in both units. non structural.Details
work @ both units. remove & replace fixtures & tile in one bathroom each in both units. non structural. | $25,000 |
| Oct 22, 2008 | Never finaled issued May 2009, no final | 2320 Broadway | expansion of kitchen, kitchen & bath remodel, demo const of 1st fl int walls, install new windows & doors, demo & install new door & windows at 2nd fl. demo of wall & const new forexpansion of kitchen & storage.Details
expansion of kitchen, kitchen & bath remodel, demo const of 1st fl int walls, install new windows & doors, demo & install new door & windows at 2nd fl. demo of wall & const new forexpansion of kitchen & storage. | $60,000 |
| Aug 1, 2008 | Completed final sign-off Apr 2009 | 1316 Fulton St | revision to pa# 2008/03/12/6946 to relocate partitions on 1st and 2nd floor and modify 1st floor kitchen and bathroomDetails
revision to pa# 2008/03/12/6946 to relocate partitions on 1st and 2nd floor and modify 1st floor kitchen and bathroom | $10,000 |
| Jan 29, 2008 | Completed final sign-off Apr 2009 | 1316 Fulton St | replace 2nd unit kitchen and bath. open-up corner lightwell on 2nd floor investigate water damage & unitigate. replace in kind. no structural work.Details
replace 2nd unit kitchen and bath. open-up corner lightwell on 2nd floor investigate water damage & unitigate. replace in kind. no structural work. | $50,000 |
| Feb 17, 2006 | Completed final sign-off Aug 2006 | 456 Lake St | add 8x8 dormer to extg bathroom permit #1071957 work on unit 456 lake stDetails
add 8x8 dormer to extg bathroom permit #1071957 work on unit 456 lake st | $2,000 |
| Nov 9, 2005 | Completed final sign-off Aug 2006 | 452 Lake St | remodel upstairs bathroom and closet 3rd floop topDetails
remodel upstairs bathroom and closet 3rd floop top | $15,000 |
| Oct 18, 2005 | Completed final sign-off Aug 2006 | 456 Lake St | remodel downstairs bathrom, remove bathtub & replace w/shower. retile. one bath remodelDetails
remodel downstairs bathrom, remove bathtub & replace w/shower. retile. one bath remodel | $6,000 |
| Apr 27, 2005 | Never finaled issued Apr 2005, no final | 435 Union St | remove existing bath fixtures-fix dyro rot & replace all new tile 2nd & 3rd floor. no structural. reDetails
remove existing bath fixtures-fix dyro rot & replace all new tile 2nd & 3rd floor. no structural. re | $12,000 |
| Sep 16, 2003 | Completed final sign-off Nov 2003 | 1880 Jackson St | remodel bathroom. replace existing fixtures with same. add fan & recepticlesDetails
remodel bathroom. replace existing fixtures with same. add fan & recepticles | $9,000 |
| Mar 31, 2003 | Completed final sign-off Dec 2004 | 25 Prosper St | add 2nd unit @ g/fl (1 bedrm/1 living rokm/1 bath/1 kitchen-utility rm) remodel upstair unit,Details
add 2nd unit @ g/fl (1 bedrm/1 living rokm/1 bath/1 kitchen-utility rm) remodel upstair unit, | $75,000 |