Permit GraphShortlistSan Francisco building permits since 2000

Bryan Michelsen Construction

Contractor license
560014
State license record
Based in
Half Moon Bay
On San Francisco permits
Apr 2002 to Feb 2026
Last 24 months
3 permits filed

82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.

Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllRoof deck 2Deck 4Stairs 7Kitchen remodel 21Bathroom remodel 24

7 stairs permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 156 days from filing to permit and 510 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 25, 2019Completed
final sign-off Mar 2023
1870 Union Stmodify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion.
Details
Permit
201909252746
Permit issued
Nov 3, 2021
Final sign-off
Mar 28, 2023

modify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion.

Open the permit page

$40,000
Oct 9, 2018Never finaled
issued Dec 2019, no final
2425 Filbert Staddition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck.
Details
Permit
201810092573
Permit issued
Dec 9, 2019

addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck.

Open the permit page

$400,000
Aug 1, 2017Never finaled
issued Nov 2017, no final
2006 Powell Strevision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maher
Details
Permit
201708013525
Permit issued
Nov 13, 2017

revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maher

Open the permit page

$20,000
Jan 26, 2017Expired or cancelled
expired Jan 2025
159 10th Avreplace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work.
Details
Permit
201701268033
Permit issued
Jan 26, 2017

replace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work.

Open the permit page

$10,000
Dec 17, 2014Completed
final sign-off May 2017
826 Diamond Sthorizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.
Details
Permit
201412173939
Permit issued
May 22, 2015
Final sign-off
May 4, 2017

horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.

Open the permit page

$350,000
Mar 30, 2009Completed
final sign-off Apr 2009
1316 Fulton Streplace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946.
Details
Permit
200903305172
Permit issued
Apr 1, 2009
Final sign-off
Apr 9, 2009

replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946.

Open the permit page

$15,000
Oct 21, 2003Never finaled
issued Aug 2004, no final
221 Fair Oaks Stadd 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/
Details
Permit
200310218054
Permit issued
Aug 27, 2004

add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/

Open the permit page

$40,720