Bryan Michelsen Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Apr 2002 to Feb 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 156 days from filing to permit and 510 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2019 | Completed final sign-off Mar 2023 | 1870 Union St | modify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion.Details
modify rear stair to comply w/ nov's #201866831-201411943 (2018008142enf) to conform w/ bldg & planning code enforcement. address rear stair, wall modifications for residential & commercial units a front bldg. expansion of commercial level down to basement & 2nd flr unit expansion. | $40,000 |
| Oct 9, 2018 | Never finaled issued Dec 2019, no final | 2425 Filbert St | addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck.Details
addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck. | $400,000 |
| Aug 1, 2017 | Never finaled issued Nov 2017, no final | 2006 Powell St | revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maherDetails
revision to 2016-0513-7368 - remove (e) exterior stairs at south light court, reduce light court at 1st, 2nd & 3rd floors, relocate lower unit kitchen at 2nd fl. add 1 new bath at lower unit 2nd fl. n/a maher | $20,000 |
| Jan 26, 2017 | Expired or cancelled expired Jan 2025 | 159 10th Av | replace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work.Details
replace existing front stairs with concrete terrazo in-kind. front wall and bricks that frame the stairs to remain in kind. less than 50%. no other work. | $10,000 |
| Dec 17, 2014 | Completed final sign-off May 2017 | 826 Diamond St | horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2.Details
horizontal & vertical addition. demolition of (e) stairs & baths @ rear of house. expansion of house @ ground level to relocate 2nd unit. remodeling/expansion of (e) dining, laundry @ level 1. bath & closet addition @ level 2. (n) decks @ level 1 & 2. | $350,000 |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 1316 Fulton St | replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946.Details
replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946. | $15,000 |
| Oct 21, 2003 | Never finaled issued Aug 2004, no final | 221 Fair Oaks St | add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/Details
add 3rd level penthouse,legalize 2nd unit,add rear stairs/deck,remove 2 columns in garage,add beam/ | $40,720 |