Bryan Michelsen Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Apr 2002 to Feb 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 48 completed, 1 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 never finaled. Typically 214 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2018 | Never finaled issued Dec 2019, no final | 2425 Filbert St | addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck.Details
addition & remodel. (e) basement will be extended to create additional storage, laundry & powder room. 3rd floor addition with powder room with a roof deck on top & is accessed by a spiral staircase. an elevator is also proposed to connect all floors. elevator does not connect to upper roof deck. | $400,000 |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 1316 Fulton St | replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946.Details
replace existing winder stair at rear of building with new spiral stair and rebuild roof to become roof deck for attic level master bedroom. revision to permit application no. 200803126946. | $15,000 |