Renato Jose
- Listed as
- architect, authorized agent-others
- Firm
- Renato Jose I Architect
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Aug 2026
20 permits since 2000 (architect on 19 permits, authorized agent-others on 1 permit): 13 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 25 Chattanooga St | conversion of an (e) basement storage & crawlspace into an attached adu.the adu project generally consists of a (n) open living/dining/kitchen,(n) bedroom,(n) office, (n) bath. ground floor rear addition w/deck above.Details
conversion of an (e) basement storage & crawlspace into an attached adu.the adu project generally consists of a (n) open living/dining/kitchen,(n) bedroom,(n) office, (n) bath. ground floor rear addition w/deck above. | $250,000 | |
| Jul 27, 2026 | In progress issued Aug 2026 | 604 Oak St | Mizen Construction Inc | project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights.Details
project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights. | $75,000 |
| Feb 20, 2026 | In progress issued Jun 2026 | 25 Forest Side Av | Mizen Construction Inc | rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacementDetails
rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacement | $700,000 |
| Jan 27, 2026 | In progress issued Apr 2026 | 212 Valley St | Mizen Construction Inc | alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixturesDetails
alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixtures | $200,000 |
| Mar 21, 2024 | Completed final sign-off Jan 2025 | 3566 19th St | 3/f: a primary bathroom and bath #2 renovation. no structural work.Details
3/f: a primary bathroom and bath #2 renovation. no structural work. | $15,000 | |
| Oct 27, 2023 | Completed final sign-off Jul 2024 | 144 25th Av | Mizen Construction Inc | to comply with boa's decision no. 23-030. revision to original pa 202302021229. reconfigure rear deck and stairs. provide structural details for 10' fence.Details
to comply with boa's decision no. 23-030. revision to original pa 202302021229. reconfigure rear deck and stairs. provide structural details for 10' fence. | |
| Sep 22, 2023 | Completed final sign-off Dec 2023 | 1413 Noe St | to comply with nov 202309726. provide an access stair from basement level to rear yard + crawlspace. replace rotting floor beam and posts below rear bay (laundry + study) at the basement. new metal rail guardrail (rear) at kitchen slider door.Details
to comply with nov 202309726. provide an access stair from basement level to rear yard + crawlspace. replace rotting floor beam and posts below rear bay (laundry + study) at the basement. new metal rail guardrail (rear) at kitchen slider door. | $8,000 | |
| Feb 2, 2023 | Completed final sign-off Jul 2024 | 144 25th Av | Mizen Construction Inc | the project generally consists of replacement of the (e) first floor deck and expanding the deck to the rear - yard setback line; addition of a roof deck above the second br office floor, accessed via 4 new door from the third fl. officeDetails
the project generally consists of replacement of the (e) first floor deck and expanding the deck to the rear - yard setback line; addition of a roof deck above the second br office floor, accessed via 4 new door from the third fl. office | $50,000 |
| Apr 15, 2022 | Completed final sign-off Nov 2025 | 1274 Sanchez St | Mizen Construction Inc | interior alteration of the basement and first floor. partial horizontal addition at the north side yard. vertical addition of a (n) second floor above the (e) first floor. exterior facade alterations. (n) roof deckDetails
interior alteration of the basement and first floor. partial horizontal addition at the north side yard. vertical addition of a (n) second floor above the (e) first floor. exterior facade alterations. (n) roof deck | $275,000 |
| Mar 16, 2022 | Completed final sign-off Nov 2023 | 56 Clipper St | Devlin/Mcnally Construction | revision to permit 201909232354: adding wet bar to an existing bookshelf space in the (e) living room.Details
revision to permit 201909232354: adding wet bar to an existing bookshelf space in the (e) living room. | $250 |
| Aug 25, 2021 | Never finaled issued Feb 2023, no final | 722 48th Av | additions to an (e) 3-story residence consists of: horizontal extension towards the side property lines at the rear of the (e) first story pop-out. partial infill of the basement below the first story for an additional bedroom suite. 123.1 sq ft deck area extension. provide nfpa 13d on basement onlyDetails
additions to an (e) 3-story residence consists of: horizontal extension towards the side property lines at the rear of the (e) first story pop-out. partial infill of the basement below the first story for an additional bedroom suite. 123.1 sq ft deck area extension. provide nfpa 13d on basement only | $250,000 | |
| Dec 14, 2020 | Completed final sign-off Jul 2021 | 825 Rolph St | Merlyn Construction | revision to pa# 202005207639. no work will be done on 2nd floor. administrative permit for reduced scope of work only.Details
revision to pa# 202005207639. no work will be done on 2nd floor. administrative permit for reduced scope of work only. | |
| May 20, 2020 | Completed final sign-off Jul 2021 | 825 Rolph St | Merlyn Construction | add sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight.Details
add sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight. | $20,000 |
| Sep 23, 2019 | Completed final sign-off Nov 2023 | 56 Clipper St | Eastwood Development Incorporated | horizontal addition at the main flr front yard. partial interior alteration of the mail flr. a 3rd story (2nd flr) vertical addition for a master suite. exterior facade alterations at the front elevation including (n) windows & siding. (n) roofdeck.Details
horizontal addition at the main flr front yard. partial interior alteration of the mail flr. a 3rd story (2nd flr) vertical addition for a master suite. exterior facade alterations at the front elevation including (n) windows & siding. (n) roofdeck. | $275,000 |
| Jun 21, 2019 | Completed final sign-off Nov 2019 | 3212 Broderick St | Kobuksan Construction | the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher.Details
the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher. | $35,000 |
| Oct 2, 2018 | Expired or cancelled cancelled Feb 2025 | 3212 Broderick St | remodel, alterations and addition to an (e) 3-story, single family residence: hoizontal 3rd story addition at an (e) 3rd story deck. rear horizontal 1st story addition. first & third story interior remodel.Details
remodel, alterations and addition to an (e) 3-story, single family residence: hoizontal 3rd story addition at an (e) 3rd story deck. rear horizontal 1st story addition. first & third story interior remodel. | $225,000 | |
| Jan 4, 2018 | Never finaled issued May 2021, no final | 313 Castro St | Kanler Inc, Connemara Fine Trim Inc Dba Highland Bui | add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck)Details
add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck) | $55,000 |
| Oct 10, 2017 | Completed final sign-off Feb 2018 | 602 Oak St | Merlyn Construction | dry rot in framing was discovered around the garage door during stucco replacement work (#201708306405). project scope is voluntary strengthening upgrade at the garage opening, consisting of (n) foundation and moment frame at the rearDetails
dry rot in framing was discovered around the garage door during stucco replacement work (#201708306405). project scope is voluntary strengthening upgrade at the garage opening, consisting of (n) foundation and moment frame at the rear | $12,000 |
| Jul 16, 2010 | Completed final sign-off Sep 2010 | 602 Oak St | J C C | replace t-111 siding at rear of house (3 sides) w/no horzontal t&g siding, painted. replace dryrot studs as req'd. replace dryrot wood plank fence memebers in kind. re-flash and water proof 4 windows at the rear deck.Details
replace t-111 siding at rear of house (3 sides) w/no horzontal t&g siding, painted. replace dryrot studs as req'd. replace dryrot wood plank fence memebers in kind. re-flash and water proof 4 windows at the rear deck. | $7,000 |
| Jul 9, 2010 | Completed final sign-off Oct 2011 | 3580 Jackson St | Jeff King And Company Inc | kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deckDetails
kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deck | $700,000 |