Block 0828, lot 025
602 Oak St
- City’s use
- Single Family Residential
- Built
- 1890
- Rooms
- 2 bathrooms
- Building
- 1,370 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 602 Oak St | Merlyn Construction | kitchen remodel, replace appliances, replace floors 190 sq ft, replace counter tops, cut and patch drywall for electrical work, kitchen cabinets will remain and be painted, all work interior.Details
kitchen remodel, replace appliances, replace floors 190 sq ft, replace counter tops, cut and patch drywall for electrical work, kitchen cabinets will remain and be painted, all work interior. | $23,500 |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 602 Oak St | Merlyn Construction | revision to bp #202307142173. fix dry rot as needed, less than 100 square feet. replace existing bathroom window, not visible fom street. u=.30max window sill is equal or greater than 60"aff.Details
revision to bp #202307142173. fix dry rot as needed, less than 100 square feet. replace existing bathroom window, not visible fom street. u=.30max window sill is equal or greater than 60"aff. | $3,500 |
| Jul 14, 2023 | Completed final sign-off Oct 2023 | 602 Oak St | Merlyn Construction | existing bathroom renovation on 2nd floorDetails
existing bathroom renovation on 2nd floor | $20,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 602 Oak St | street space | ||
| Nov 13, 2017 | Completed final sign-off Feb 2018 | 602 Oak St | Merlyn Construction | revision work under to pa #201708306405 during stucco replacement, dyrrot was discovered in the framing around the windows. project scope is to replace dyrryot w/new framing, & to reinstall the existing windows after window openings are waterproofed @ front of house. work in common.Details
revision work under to pa #201708306405 during stucco replacement, dyrrot was discovered in the framing around the windows. project scope is to replace dyrryot w/new framing, & to reinstall the existing windows after window openings are waterproofed @ front of house. work in common. | $3,500 |
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 602 Oak St | street space | ||
| Oct 10, 2017 | Completed final sign-off Feb 2018 | 602 Oak St | Merlyn Construction | dry rot in framing was discovered around the garage door during stucco replacement work (#201708306405). project scope is voluntary strengthening upgrade at the garage opening, consisting of (n) foundation and moment frame at the rearDetails
dry rot in framing was discovered around the garage door during stucco replacement work (#201708306405). project scope is voluntary strengthening upgrade at the garage opening, consisting of (n) foundation and moment frame at the rear | $12,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2018 | 602 Oak St | Merlyn Construction | replace (e) stucco in-kind on entire front and side facades of property. no other work.Details
replace (e) stucco in-kind on entire front and side facades of property. no other work. | $40,000 |
| Aug 24, 2010 | Completed final sign-off Sep 2010 | 602 Oak St | J C C | revision to pa#201007166768 owner wants to use somthing cheaper hary plank. change material on siding at back side of bldg.Details
revision to pa#201007166768 owner wants to use somthing cheaper hary plank. change material on siding at back side of bldg. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Merlyn Construction (6), J C C
- Architects
- Renato Jose
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.