Kobuksan Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Aug 2026
- Last 24 months
- 18 permits filed
105 permits since 2000: 66 completed, 16 in progress, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 680 02nd St | convert new counter and extend existing kitchen. provide new kitchen equipment, new electrical and lighting as required for new equipment. no exterior work.Details
convert new counter and extend existing kitchen. provide new kitchen equipment, new electrical and lighting as required for new equipment. no exterior work. | $150,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 221 San Jose Av | recommencement and completion of work approved under pa# 201805229778, 201904037057, 201907125803Details
recommencement and completion of work approved under pa# 201805229778, 201904037057, 201907125803 | $5,250 |
| Jul 13, 2026 | In progress issued Jul 2026 | 221 San Jose Av | recommencement and completion of work approved under pa# 2018-0220-1682Details
recommencement and completion of work approved under pa# 2018-0220-1682 | $9,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 221 San Jose Av | to obtain final inspection for work approved under pa# 2023-0519-8173. all work is completeDetails
to obtain final inspection for work approved under pa# 2023-0519-8173. all work is complete | |
| Apr 14, 2026 | In progress issued May 2026 | 2603 23rd St | 2603 23rd st: kitchen & bathroom remodel, new skylight, new bathroom next to kitchen. 1206 utah: kitchen & bathroom remodel, new skylight, new bathroom next to rear bedroom.Details
2603 23rd st: kitchen & bathroom remodel, new skylight, new bathroom next to kitchen. 1206 utah: kitchen & bathroom remodel, new skylight, new bathroom next to rear bedroom. | $65,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 356 Willard North St | to obtain final inspection for work approved under pa# 2023-0419-6058. all work is completeDetails
to obtain final inspection for work approved under pa# 2023-0419-6058. all work is complete | |
| Jan 14, 2026 | In progress issued Feb 2026 | 2384 Fulton St | recommencement and completion of work approved under pa# 2023-0307-3205Details
recommencement and completion of work approved under pa# 2023-0307-3205 | $4,500 |
| Jan 14, 2026 | In progress issued Jan 2026 | 2603 23rd St | exploratory demo to architectural plans and property inspection conditions. all work is interior.(sheetrock only plaster)Details
exploratory demo to architectural plans and property inspection conditions. all work is interior.(sheetrock only plaster) | $2,500 |
| Jan 14, 2026 | In progress issued Feb 2026 | 2384 Fulton St | recommencement and completion of work approved under pa# 2017-1025-2274, pa# 2017-0516-6722 and pa# 2024-0808-8248Details
recommencement and completion of work approved under pa# 2017-1025-2274, pa# 2017-0516-6722 and pa# 2024-0808-8248 | $18,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 2384 Fulton St | recommencement and completion of work approved under pa# 2019-1112-7090 and pa# 2022-1117-6715Details
recommencement and completion of work approved under pa# 2019-1112-7090 and pa# 2022-1117-6715 | $82,500 |
| Oct 9, 2025 | In progress issued Oct 2025 | 2384 Fulton St | recommencement and completion of work approved under pa# 202009204569.Details
recommencement and completion of work approved under pa# 202009204569. | $20,000 |
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 1901 Ofarrell St | overlay stucco finish coat over existing siding to protect gap in between buildings, like for like. rear of building, approx. 15'x20'ht. to satisfy complaint #202543137, not visible from street.Details
overlay stucco finish coat over existing siding to protect gap in between buildings, like for like. rear of building, approx. 15'x20'ht. to satisfy complaint #202543137, not visible from street. | $1,500 |
| Sep 4, 2025 | In progress issued Sep 2025 | 531 41st Av | to compy w/nov #202542076; item 2 +3: remove electrical conduit @ front exterior added to (e) w/o permit. remove trench drain w/sump pump at garage and patch garage slab.Details
to compy w/nov #202542076; item 2 +3: remove electrical conduit @ front exterior added to (e) w/o permit. remove trench drain w/sump pump at garage and patch garage slab. | $1,500 |
| Sep 4, 2025 | Expired or cancelled cancelled Oct 2025 | 4320 Mission St | install drywall patches on openings from exploratory demo.Details
install drywall patches on openings from exploratory demo. | $2,500 |
| Aug 5, 2025 | In progress filed Aug 2025, not yet issued | 4555 California St | install automatic door operator to replace existing.Details
install automatic door operator to replace existing. | $10,000 |
| Aug 5, 2025 | In progress filed Aug 2025, not yet issued | 4555 California St | install door operator to replace existingDetails
install door operator to replace existing | $10,000 |
| Mar 10, 2025 | Completed final sign-off Mar 2026 | 2234 40th Av | remodel kitchen with new cabinets and counter no layout change, remodel bathroom with new vanity and tile work no layout change. no removal of wall for both roomsDetails
remodel kitchen with new cabinets and counter no layout change, remodel bathroom with new vanity and tile work no layout change. no removal of wall for both rooms | $8,500 |
| Mar 4, 2025 | In progress issued Mar 2025 | 2384 Fulton St | first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets.Details
first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets. | $5,000 |
| Aug 8, 2024 | In progress issued Aug 2024 | 2384 Fulton St | revision to previously approved soft story pa 201710252274 based on site revisions and approved adu permit 201911127090.Details
revision to previously approved soft story pa 201710252274 based on site revisions and approved adu permit 201911127090. | |
| Jul 16, 2024 | Expired or cancelled expired Jun 2026 | 2384 Fulton St | recommencement and completion of work approved under pa# 2017-0516-6722Details
recommencement and completion of work approved under pa# 2017-0516-6722 | $5,000 |
| May 1, 2024 | Completed final sign-off Jun 2024 | 1316 48th Av | revision bpa# 202403016877: to clarify wording for front building remediation which is to remove (e) wood shingle and install new wood shingle in kind to satisfy remediation work. also to satisfy complaint# 202422826 and 202312298 items #1-4Details
revision bpa# 202403016877: to clarify wording for front building remediation which is to remove (e) wood shingle and install new wood shingle in kind to satisfy remediation work. also to satisfy complaint# 202422826 and 202312298 items #1-4 | |
| Mar 1, 2024 | Completed final sign-off Jun 2024 | 1316 48th Av | remove existing exterior panel and siding replace with fibler cement lap siding to comply with complaint # 202312298 nov for peeling paint with lead concerns. front shall remain with paint removal remediation only.Details
remove existing exterior panel and siding replace with fibler cement lap siding to comply with complaint # 202312298 nov for peeling paint with lead concerns. front shall remain with paint removal remediation only. | $25,000 |
| Jun 2, 2023 | Never finaled issued Jul 2023, no final | 2374 Fulton St | to comply with nov 202304702 add new concrete underpinning pits along property lineDetails
to comply with nov 202304702 add new concrete underpinning pits along property line | $100,000 |
| Apr 19, 2023 | Never finaled issued Jul 2023, no final | 356 Willard North St | to comply w/nov# 202304910, appy grout to soil at north wall to stabilize @ rear yard approx 42".Details
to comply w/nov# 202304910, appy grout to soil at north wall to stabilize @ rear yard approx 42". | $10,000 |
| Apr 19, 2023 | Expired or cancelled withdrawn Aug 2026 | 2374 Fulton St | to comply w/nov# 202304702, apply grout to soil at east wall to stabilize footing.Details
to comply w/nov# 202304702, apply grout to soil at east wall to stabilize footing. | $10,000 |
| Dec 19, 2022 | Never finaled issued Feb 2023, no final | 1506 Sanchez St | (3)kitchen and bath remodel. repair minor dry rot at rear stair and close permit complaint# 202285976 and permit complaint 202285979 (dirty water heater water). all work for units: 1506, 1508, and 1510. stair dryrot repair in kind, less than 50%.Details
(3)kitchen and bath remodel. repair minor dry rot at rear stair and close permit complaint# 202285976 and permit complaint 202285979 (dirty water heater water). all work for units: 1506, 1508, and 1510. stair dryrot repair in kind, less than 50%. | $25,000 |
| Dec 8, 2022 | Expired or cancelled cancelled Jan 2026 | 2157 Clement St | open partition wall for a doorway or replace entrance door to conform with abe compliance #202207142565Details
open partition wall for a doorway or replace entrance door to conform with abe compliance #202207142565 | $2,500 |
| Sep 1, 2022 | Completed final sign-off Jun 2023 | 392 Fulton St | interior ti to convert donut shop to resturant and barDetails
interior ti to convert donut shop to resturant and bar | $75,000 |
| May 16, 2022 | Completed final sign-off Nov 2022 | 227 07th Av | one kitchen remodel in-kind. replace cabinets, counters, and appliances. non structral.Details
one kitchen remodel in-kind. replace cabinets, counters, and appliances. non structral. | $25,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2022 | 50 Nido Av | to obtain final inspection for work approved under pa 201812118034. all work is completeDetails
to obtain final inspection for work approved under pa 201812118034. all work is complete | |
| Feb 9, 2022 | Completed final sign-off Feb 2023 | 4555 California St | recommencement and completion of work approved under pa#201903155402Details
recommencement and completion of work approved under pa#201903155402 | |
| Nov 17, 2021 | Completed final sign-off Apr 2022 | 8200 Oceanview Tr | unit 202: replace kitchen cabinets with new cabinets and counters. reinstall sink.Details
unit 202: replace kitchen cabinets with new cabinets and counters. reinstall sink. | $9,500 |
| Jan 26, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | unit 208: kitchen & bath remodel. no layout change.Details
unit 208: kitchen & bath remodel. no layout change. | $51,300 |
| Jan 26, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | unit 207: kitchen & bath remodel. no layout change.Details
unit 207: kitchen & bath remodel. no layout change. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 205): kitchen & bathroom remodel in kind.Details
(unit 205): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 203): kitchen & bathroom remodel in kind.Details
(unit 203): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 206): kitchen & bathroom remodel in kind.Details
(unit 206): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 13, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 13, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | install new cabinets in kitchen and new plumbing fixture replace for sink and 2 bathrooms. replace 6 fci receptacles no layout changes.Details
install new cabinets in kitchen and new plumbing fixture replace for sink and 2 bathrooms. replace 6 fci receptacles no layout changes. | $51,300 |
| Oct 14, 2020 | Completed final sign-off Nov 2021 | 1370 19th Av | remodel existing kitchen. no layout changes. replacing cabinets, floor, lights & applianncesDetails
remodel existing kitchen. no layout changes. replacing cabinets, floor, lights & appliannces | $25,000 |
| Aug 31, 2020 | Completed final sign-off Mar 2021 | 3046 Jackson St | unit #c: remove 2 windows on 4th floor front facade. replace with the new wood sliding doors. replace existing single glazed windows at 4th floor alley (west elevatiom) at kitchen and bedroom. replcae with double glazed wood window. remove wood siding at 4th floor fron facade w/ cement plaster.Details
unit #c: remove 2 windows on 4th floor front facade. replace with the new wood sliding doors. replace existing single glazed windows at 4th floor alley (west elevatiom) at kitchen and bedroom. replcae with double glazed wood window. remove wood siding at 4th floor fron facade w/ cement plaster. | $20,000 |
| Feb 26, 2020 | Completed final sign-off Sep 2020 | 3790 16th St | repair/replace all wall & floor tiles in 2x bathrooms due to leak & damage. layouts to remain & reinstall vanities, toilets, etc to existing after new tile. reuse existing fixtures. replace in kindDetails
repair/replace all wall & floor tiles in 2x bathrooms due to leak & damage. layouts to remain & reinstall vanities, toilets, etc to existing after new tile. reuse existing fixtures. replace in kind | $12,000 |
| Feb 12, 2020 | Completed final sign-off Sep 2020 | 8200 Oceanview Tr | apt 121: replace sheetrock only: to run lights & reinstall sheetrock & fixtures in kitchen & bathroom once electrical is complete.Details
apt 121: replace sheetrock only: to run lights & reinstall sheetrock & fixtures in kitchen & bathroom once electrical is complete. | $12,000 |
| Jan 8, 2020 | Expired or cancelled cancelled Jan 2026 | 125 03rd Av | revision to pa #201703091149. update plan w/standard smf instead of simpsons smf.Details
revision to pa #201703091149. update plan w/standard smf instead of simpsons smf. | |
| Nov 12, 2019 | Never finaled issued Jul 2022, no final | 2384 Fulton St | add units per ord 162-16. add 5 new dwelling units on (e) 1/fl. all work within (e) envelop in accordance w/ planning ord & 162-16 adu legislation. ref soft story permit 201710252274.Details
add units per ord 162-16. add 5 new dwelling units on (e) 1/fl. all work within (e) envelop in accordance w/ planning ord & 162-16 adu legislation. ref soft story permit 201710252274. | $325,000 |
| Oct 28, 2019 | Completed final sign-off Sep 2021 | 721 Larkin St | t.i. of sweet glory dessert cafe, non-strutural walls, equipment, finishes with associated plumbing, electrical and mechanical.Details
t.i. of sweet glory dessert cafe, non-strutural walls, equipment, finishes with associated plumbing, electrical and mechanical. | $38,000 |
| Jul 18, 2019 | Completed final sign-off Jul 2020 | 649 Kansas St | at front façade, replace seven vinyl windows with aluminum-clad double-hung wood windows. at side, replace four windows w/new aluminum-clad double-hung wood windows. no other work under this permit.Details
at front façade, replace seven vinyl windows with aluminum-clad double-hung wood windows. at side, replace four windows w/new aluminum-clad double-hung wood windows. no other work under this permit. | $3,500 |
| Jun 21, 2019 | Completed final sign-off Nov 2019 | 3212 Broderick St | the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher.Details
the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher. | $35,000 |
| Mar 15, 2019 | Expired or cancelled expired Feb 2023 | 4555 California St | install new ansul hood in (e) restaurant.Details
install new ansul hood in (e) restaurant. | $8,000 |
| Feb 19, 2019 | Completed final sign-off Mar 2020 | 700 Polk St | revision to pa 201804206920 to reflect as-built framing condition and revision to mechanical systemDetails
revision to pa 201804206920 to reflect as-built framing condition and revision to mechanical system | |
| Feb 11, 2019 | Completed final sign-off Mar 2020 | 700 Polk St | rev. to pa#201809180703, change direction of ceiling joistsDetails
rev. to pa#201809180703, change direction of ceiling joists | |
| Jan 7, 2019 | Never finaled issued Jan 2019, no final | 189 Commonwealth Av | repair damaged ceiling (( 15x15 ) in common area boiler room with mesh & plaster, repair in kindDetails
repair damaged ceiling (( 15x15 ) in common area boiler room with mesh & plaster, repair in kind | $750 |
| Dec 11, 2018 | Expired or cancelled expired Mar 2022 | 50 Nido Av | voluntary structural strengtheningDetails
voluntary structural strengthening | $20,000 |
| Sep 18, 2018 | Completed final sign-off Mar 2020 | 700 Polk St | ceiling framing at ground levelDetails
ceiling framing at ground level | $5,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2019 | 189 Commonwealth Av | int. remodel unit #1: (e) kitchen converted to (n) bedroom, (e) bath converted to (n) kitchen, (e) den converted to (n) bath., (n) closet between (e) bathroom & (e) living room. mep and structural work per scope/plan.Details
int. remodel unit #1: (e) kitchen converted to (n) bedroom, (e) bath converted to (n) kitchen, (e) den converted to (n) bath., (n) closet between (e) bathroom & (e) living room. mep and structural work per scope/plan. | $80,000 |
| Jun 12, 2018 | Completed final sign-off Oct 2018 | 3282 Mission St | to obtain final inspection for work approved under pa#201311212551. all work is complete.Details
to obtain final inspection for work approved under pa#201311212551. all work is complete. | |
| Apr 20, 2018 | Completed final sign-off Mar 2020 | 700 Polk St | interior t.i. of an (e)ground flr. tenant space of 1949 sf for a (n)restaurant. scope of work shall include but not limited to (n)equipment for kitchen,(n)accessible restrooms and (n)finishes throughtout. modification to exterior to exterior door accessibility. change of use occupancy class to a-2Details
interior t.i. of an (e)ground flr. tenant space of 1949 sf for a (n)restaurant. scope of work shall include but not limited to (n)equipment for kitchen,(n)accessible restrooms and (n)finishes throughtout. modification to exterior to exterior door accessibility. change of use occupancy class to a-2 | $195,000 |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 3282 Mission St | ground floor remodel to dining area in a-2 space. remove sushi bar, reconfigure customer var to service bar. replace counter top, construct divider screen, new occupant load 68 pplDetails
ground floor remodel to dining area in a-2 space. remove sushi bar, reconfigure customer var to service bar. replace counter top, construct divider screen, new occupant load 68 ppl | $52,000 |
| Nov 27, 2017 | Completed final sign-off Jun 2019 | 761 Post St | removal and replacement of windows for weatherization, function, and efficiency. retrofit with new double hung on og lug with wood frames to remain on the entire front facade.Details
removal and replacement of windows for weatherization, function, and efficiency. retrofit with new double hung on og lug with wood frames to remain on the entire front facade. | $500,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2018 | 1472 15th St | conform for work needed to satisfy complaint #201799571 (permit rear shed to be removed) (dry rot stair repair and glass pane replacement) repair water heater and patch work and paint. n/a maherDetails
conform for work needed to satisfy complaint #201799571 (permit rear shed to be removed) (dry rot stair repair and glass pane replacement) repair water heater and patch work and paint. n/a maher | $1,250 |
| Jul 12, 2017 | Completed final sign-off May 2019 | 761 Post St | repair one front unit window (in-kind wood) and one rear window (metal); two windows total. no other work.Details
repair one front unit window (in-kind wood) and one rear window (metal); two windows total. no other work. | $12,000 |
| Mar 9, 2017 | Never finaled issued Mar 2017, no final | 1470 15th St | exploratory demo throughout with approx. 1-2 2'x2' holes per surface area. patching included when done. n/a maher ord. 155-13Details
exploratory demo throughout with approx. 1-2 2'x2' holes per surface area. patching included when done. n/a maher ord. 155-13 | $3,500 |
| Mar 9, 2017 | Completed final sign-off Aug 2020 | 125 03rd Av | soft story retrofit per sfbc chapter 4d, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 4d, 2012 iebc appendix a-4 | $80,000 |
| Aug 18, 2016 | Expired or cancelled expired Sep 2018 | 3233 22nd St | change of use from vacant comm retail to commercial workshop teaching kitchen. plbg & elec, new ada compliance unisex bathroom. new light fixtures. exterior work - demolition of plywood & signage at front glass transom to restore orig transom. replace storefront door. signage under separate permit.Details
change of use from vacant comm retail to commercial workshop teaching kitchen. plbg & elec, new ada compliance unisex bathroom. new light fixtures. exterior work - demolition of plywood & signage at front glass transom to restore orig transom. replace storefront door. signage under separate permit. | $50,000 |
| Aug 8, 2016 | Completed final sign-off Dec 2016 | 3515 20th St | to comply with nov#201546591 for work without permit.revision to app#201510301319: (n) prep area & ada restroomDetails
to comply with nov#201546591 for work without permit.revision to app#201510301319: (n) prep area & ada restroom | $10,000 |
| Jun 9, 2016 | Expired or cancelled cancelled Jan 2026 | 2701 40th Av | first bathroom remodel: replace ext storage/closet with shower to make it a full bathroom.Details
first bathroom remodel: replace ext storage/closet with shower to make it a full bathroom. | $2,500 |
| Apr 21, 2016 | Completed final sign-off May 2016 | 1177 California St | to complete work and obtain final inspection for work approved under pa #2014-01-30-7422.Details
to complete work and obtain final inspection for work approved under pa #2014-01-30-7422. | $1,000 |
| Mar 31, 2016 | Completed final sign-off Aug 2016 | 1058 Hyde St | remodel ada bathroom single use.Details
remodel ada bathroom single use. | $5,000 |
| Mar 14, 2016 | Completed final sign-off Oct 2016 | 724 Bush St | remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awningDetails
remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awning | $35,000 |
| Feb 29, 2016 | Completed final sign-off Oct 2017 | 767 Pine St | remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg.Details
remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg. | $60,000 |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 2701 40th Av | 1 kitchen & 2 bathroom remodel. all layout in-kind. upgrade appliances. no walls to be altered.Details
1 kitchen & 2 bathroom remodel. all layout in-kind. upgrade appliances. no walls to be altered. | $35,000 |
| Nov 5, 2015 | Completed final sign-off May 2016 | 1177 California St | install 36" door in partition wall for bathroom access, remove tub and tile for stading shower, relocate outlet for gfciDetails
install 36" door in partition wall for bathroom access, remove tub and tile for stading shower, relocate outlet for gfci | $13,500 |
| Nov 5, 2015 | Completed final sign-off Dec 2015 | 601 Van Ness Av | replace tub surround & floor tiles in bathroom. change shower fixt, vanity & install new ceiling (2x) recessed lights. replace ceiling fan. change floor tiles in kitchen. n/a for maher.Details
replace tub surround & floor tiles in bathroom. change shower fixt, vanity & install new ceiling (2x) recessed lights. replace ceiling fan. change floor tiles in kitchen. n/a for maher. | $11,000 |
| Oct 30, 2015 | Completed final sign-off Dec 2016 | 3515 20th St | (n) service/sales counter addition with associated plumbing and electrical work, (n) light fixtures & equipment installation, resurface flooring & paint walls, no exterior work.Details
(n) service/sales counter addition with associated plumbing and electrical work, (n) light fixtures & equipment installation, resurface flooring & paint walls, no exterior work. | $27,000 |
| Sep 21, 2015 | Completed final sign-off Sep 2015 | 753 Baker St | to obtain final inspection for work approved under pa#200812178718 all work is complete.Details
to obtain final inspection for work approved under pa#200812178718 all work is complete. | |
| Sep 3, 2015 | Completed final sign-off Dec 2015 | 1046 Pacific Av | repair existing trim, patch & apply sealed coating, replace any pieces if necessary. less than 50%. in kind wood to wood. approx. 5000 sq.ft. n/a ordinance #155-13.Details
repair existing trim, patch & apply sealed coating, replace any pieces if necessary. less than 50%. in kind wood to wood. approx. 5000 sq.ft. n/a ordinance #155-13. | $7,500 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 722 Bush St | exploratory demo of existing space. tenant improvement under separate permit.Details
exploratory demo of existing space. tenant improvement under separate permit. | $1,500 |
| Jun 22, 2015 | Completed final sign-off Jun 2015 | 771 Pine St | remove 5'x5' section of 3/8" floor tiles & replace in kind. patch hole in sill area & seal.Details
remove 5'x5' section of 3/8" floor tiles & replace in kind. patch hole in sill area & seal. | $750 |
| Oct 15, 2013 | Never finaled issued Oct 2013, no final | 2350 14th Av | replace dry rot studs (3x) & re-apply stucco & patch. repair in kind, area total 30 sq ftDetails
replace dry rot studs (3x) & re-apply stucco & patch. repair in kind, area total 30 sq ft | $1,500 |
| Aug 20, 2013 | Completed final sign-off Nov 2013 | 724 Bush St | build a new service counterDetails
build a new service counter | $3,000 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 2555 47th Av | remove all unpermitted work on garage level & revert back to garageDetails
remove all unpermitted work on garage level & revert back to garage | $750 |
| Oct 5, 2012 | Expired or cancelled expired Jun 2015 | 2550 California St | construction of partition and doors to create private office. reconstruct interior stair for accessibility. relocate extg light fixtures as required, add outlets.Details
construction of partition and doors to create private office. reconstruct interior stair for accessibility. relocate extg light fixtures as required, add outlets. | $7,000 |
| Oct 14, 2011 | Expired or cancelled expired Nov 2012 | 2350 14th Av | remove portions of stucco/siding where dryrot damage has been visable, replace rotted siding & repair framing if needed. reinstall exterior finish. all repairs in kind.Details
remove portions of stucco/siding where dryrot damage has been visable, replace rotted siding & repair framing if needed. reinstall exterior finish. all repairs in kind. | $8,500 |
| Nov 30, 2010 | Expired or cancelled expired Jun 2014 | 530 North Point St | relocate kitchen to (e) vacant coffee shop space & finish (e) restaurant acoustic ceiling, sprinklers on seperate permit. relocate all electrical panelsDetails
relocate kitchen to (e) vacant coffee shop space & finish (e) restaurant acoustic ceiling, sprinklers on seperate permit. relocate all electrical panels | $65,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 530 North Point St | alternation of existing fire sprinklers for tenant improvement, relocate 8 heads, drop 11 heads.Details
alternation of existing fire sprinklers for tenant improvement, relocate 8 heads, drop 11 heads. | $3,800 |
| Sep 30, 2010 | Completed final sign-off Nov 2010 | 1446 Moraga St | to comply with nov 201039379; remove kitchen cabinets (illegal existing use) in garage space. install 5/8" drywall in garage wall for 1hr. fire rated wall. legalize basement room/bathroom, bedroom and living room.Details
to comply with nov 201039379; remove kitchen cabinets (illegal existing use) in garage space. install 5/8" drywall in garage wall for 1hr. fire rated wall. legalize basement room/bathroom, bedroom and living room. | $30,000 |
| Jun 30, 2010 | Completed final sign-off Sep 2010 | 1500 California St | sheetrock, tape mud & leave to level 3 finish. add 8 to 10 ceiling lights & 3 wall sconces. install grill to existing gas line (flex connection is the same as existing). install basic shelves & 2 fixed cabinets. install frier & griddle.Details
sheetrock, tape mud & leave to level 3 finish. add 8 to 10 ceiling lights & 3 wall sconces. install grill to existing gas line (flex connection is the same as existing). install basic shelves & 2 fixed cabinets. install frier & griddle. | $5,000 |
| Sep 23, 2009 | Completed final sign-off Oct 2009 | 115 El Verano Wy | to obtain final inspection for work approved under pa 200608280760; all work has been completedDetails
to obtain final inspection for work approved under pa 200608280760; all work has been completed | |
| Sep 23, 2009 | Completed final sign-off Oct 2009 | 115 El Verano Wy | to obtain final inspection for work approved under pa 200608018202; all work has been completedDetails
to obtain final inspection for work approved under pa 200608018202; all work has been completed | |
| Sep 23, 2009 | Completed final sign-off Oct 2009 | 115 El Verano Wy | to obtain final inspection for work approved under pa 200504139961; all work has been completedDetails
to obtain final inspection for work approved under pa 200504139961; all work has been completed | |
| Jul 13, 2009 | Never finaled issued Jul 2009, no final | 470 03rd St | painting, installation of equipment, partition wall/window (interior) remodel (e) space on the 1st. floor & convert to cafe.Details
painting, installation of equipment, partition wall/window (interior) remodel (e) space on the 1st. floor & convert to cafe. | $12,000 |
| Jan 20, 2009 | Completed final sign-off Dec 2009 | 753 Baker St | provide finished walls,ceiling, floor for attic storage. install 8 skylights, dormer for stairs and staircase leading to attic. sprinkler under separate permit.Details
provide finished walls,ceiling, floor for attic storage. install 8 skylights, dormer for stairs and staircase leading to attic. sprinkler under separate permit. | $25,000 |
| Jul 28, 2008 | Completed final sign-off Aug 2008 | 3812 22nd St | repair damaged landing on stair landing/deck. (existing) rear all work in kind.Details
repair damaged landing on stair landing/deck. (existing) rear all work in kind. | $750 |
| Mar 3, 2008 | Completed final sign-off Apr 2008 | 328 Joost Av | replace existing doors with new garage doors in kind. no structural work. to comply with nov #200844432 dd 2/14/08Details
replace existing doors with new garage doors in kind. no structural work. to comply with nov #200844432 dd 2/14/08 | $3,000 |