Block 0304, lot 015
761 Post St
- City’s use
- Commercial Hotel
- Built
- 1930
- Stories
- 17
- Units
- 166
- Rooms
- 166 bathrooms
- Building
- 57,972 sq ft
- Lot
- 8,250 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2026 | In progress issued May 2026 | 761 Post St | Bobcomm Llc Dba Pacific Das Llc. | replace bi-directional amplifier in existing errcs system. ref permit 201503201510Details
replace bi-directional amplifier in existing errcs system. ref permit 201503201510 | $20,000 |
| Feb 19, 2025 | Completed final sign-off Jun 2025 | 761 Post St | Rago Neon Inc. | new sign on awningsDetails
new sign on awnings | $1,200 |
| Aug 5, 2021 | Completed final sign-off Feb 2022 | 761 Post St | Redwood Electric Group Inc | demo (e)/replace w/upgraded bda filter & donor antennaDetails
demo (e)/replace w/upgraded bda filter & donor antenna | $30,867 |
| Dec 23, 2020 | Completed final sign-off Feb 2021 | 761 Post St | Fluoresco Services Llc/Everbrite West Ll | revision to pa# 201910225212 to change style of tagline and remove electrical component from scope of work. no change to method of attachment.Details
revision to pa# 201910225212 to change style of tagline and remove electrical component from scope of work. no change to method of attachment. | |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 761 Post St | Fluoresco Services Llc/Everbrite West Ll | install 1 illuminated single faced sign "courtyard marriott"Details
install 1 illuminated single faced sign "courtyard marriott" | $4,000 |
| Jul 2, 2018 | Never finaled filed Jul 2018, never issued | 761 Post St | street space w/mtaDetails
street space w/mta | ||
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 761 Post St | street space w/mtaDetails
street space w/mta | ||
| Apr 23, 2018 | Expired or cancelled cancelled Jan 2026 | 761 Post St | revision to 201711274834: remove the replacement of (e) alum sash slider windows at south elevation from scope of work.Details
revision to 201711274834: remove the replacement of (e) alum sash slider windows at south elevation from scope of work. | ||
| Nov 27, 2017 | Completed final sign-off Jun 2019 | 761 Post St | Kobuksan Construction | removal and replacement of windows for weatherization, function, and efficiency. retrofit with new double hung on og lug with wood frames to remain on the entire front facade.Details
removal and replacement of windows for weatherization, function, and efficiency. retrofit with new double hung on og lug with wood frames to remain on the entire front facade. | $500,000 |
| Jul 12, 2017 | Completed final sign-off May 2019 | 761 Post St | Kobuksan Construction | repair one front unit window (in-kind wood) and one rear window (metal); two windows total. no other work.Details
repair one front unit window (in-kind wood) and one rear window (metal); two windows total. no other work. | $12,000 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 761 Post St | street space permitDetails
street space permit | ||
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 761 Post St | Fire Detection Unlimited | submitting as builts for permit 201412032886; maher n/aDetails
submitting as builts for permit 201412032886; maher n/a | $850 |
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 761 Post St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Aug 7, 2015 | Completed final sign-off Oct 2015 | 761 Post St | Summit Dck ,Llc | as -built smoke control matrix. n/a for maherDetails
as -built smoke control matrix. n/a for maher | |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 761 Post St | Summit Dck ,Llc | updated t24 to match as built lighting including revised lighting plans and mech t24 sheets. 201311262930 maher not reqDetails
updated t24 to match as built lighting including revised lighting plans and mech t24 sheets. 201311262930 maher not req | |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 761 Post St | street space & mtaDetails
street space & mta | ||
| Mar 20, 2015 | Never finaled issued Apr 2015, no final | 761 Post St | Redwood Electric Group Inc, Summit Dck ,Llc | install emergency responder radio coverage system. ** maher: compliance with ordinance no# 155-13 not required **Details
install emergency responder radio coverage system. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2015 | 761 Post St | Summit Dck ,Llc | emergency evacuation signs on basement,lobby, mezzanine level, 3 - 17 typical floors (total 18 floor). n/a maher ordinanceDetails
emergency evacuation signs on basement,lobby, mezzanine level, 3 - 17 typical floors (total 18 floor). n/a maher ordinance | $56,600 |
| Dec 3, 2014 | Never finaled issued Feb 2015, no final | 761 Post St | Fire Detection Unlimited | fa system: detecters and modules for elev recall. nw av's throughout common areas. nw notification devices in each bedroom of each guest unit. rps for av's. monitor modules for backflow switch. monitor modules for 1 wf swch & 1 ts per fl. n.b. special inspection reqd for smoke control systemDetails
fa system: detecters and modules for elev recall. nw av's throughout common areas. nw notification devices in each bedroom of each guest unit. rps for av's. monitor modules for backflow switch. monitor modules for 1 wf swch & 1 ts per fl. n.b. special inspection reqd for smoke control system | $80,000 |
| Nov 25, 2014 | Never finaled issued Nov 2014, no final | 761 Post St | street spaceDetails
street space | ||
| Oct 22, 2014 | Never finaled issued Mar 2015, no final | 761 Post St | Northwest Signs | install an electric single faced channel letters on (e) awning. n/a maher ordinance.Details
install an electric single faced channel letters on (e) awning. n/a maher ordinance. | $7,500 |
| Oct 14, 2014 | Completed final sign-off Oct 2015 | 761 Post St | Tony Ng Plumbing Co | per nfpa 13, 14 and 20 2013 edition, revise existing fire sprinkler system, add a new standpipe in the new stair and replace fire pump for 761 post st revise building appln #201311262930 comply with maher ordinance extended #155-13 not requiredDetails
per nfpa 13, 14 and 20 2013 edition, revise existing fire sprinkler system, add a new standpipe in the new stair and replace fire pump for 761 post st revise building appln #201311262930 comply with maher ordinance extended #155-13 not required | $386,700 |
| Jul 18, 2014 | Completed final sign-off Oct 2015 | 761 Post St | Lusardi Construction Co, Summit Dck ,Llc | revision to app#201311262930. simplify original scope. no longer constructing 2nd f1 floor and elevator. remove 2nd f1 guestrooms and mep hvac work. chiller relocated. 1st and 2nd floor layout changed. no longer demolishing roof.n/a for maher #155-13Details
revision to app#201311262930. simplify original scope. no longer constructing 2nd f1 floor and elevator. remove 2nd f1 guestrooms and mep hvac work. chiller relocated. 1st and 2nd floor layout changed. no longer demolishing roof.n/a for maher #155-13 | $50,000 |
| Nov 26, 2013 | Completed final sign-off Oct 2015 | 761 Post St | Lusardi Construction Co, Summit Dck ,Llc | renovation of a 17 story hotel.add 20(n)guest rms/cut 2 light courts out of(e)flrs/voluntary seismic upgrade of entire bldg/increase(e)roof height above level 2.demo under ap#201306237535/201307192286.visual alarm,fire alarm/sprinkler under sep.permit.compliance w/mahner ord #155-13 not requir'dDetails
renovation of a 17 story hotel.add 20(n)guest rms/cut 2 light courts out of(e)flrs/voluntary seismic upgrade of entire bldg/increase(e)roof height above level 2.demo under ap#201306237535/201307192286.visual alarm,fire alarm/sprinkler under sep.permit.compliance w/mahner ord #155-13 not requir'd | $5,000,000 |
| Nov 1, 2013 | Expired or cancelled cancelled Jan 2026 | 761 Post St | Lusardi Construction Co | removal of misc. structural elements in extg 17 story vacant hotel.Details
removal of misc. structural elements in extg 17 story vacant hotel. | $15,000 |
| Oct 22, 2013 | Never finaled issued Oct 2013, no final | 761 Post St | street spaceDetails
street space | ||
| Sep 23, 2013 | Completed final sign-off Feb 2014 | 761 Post St | Lusardi Construction Co | revision tp appl # 2013/07/19/2286 - 2removal of misc non structural partitions and related work in vacant portions of existing vacant 17 story hotel in nob hill. do not remove lowered ceiling before approvial of arch plans under separate application. maintain sprinkler and standpipes operationalDetails
revision tp appl # 2013/07/19/2286 - 2removal of misc non structural partitions and related work in vacant portions of existing vacant 17 story hotel in nob hill. do not remove lowered ceiling before approvial of arch plans under separate application. maintain sprinkler and standpipes operational | $26,000 |
| Jul 19, 2013 | Completed final sign-off May 2014 | 761 Post St | interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017.Details
interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017. | $375,000 | |
| Jun 4, 2010 | Never finaled issued Jun 2010, no final | 761 Post St | umbrella permit for high rise sprinler ordinance 377-93 compliance. no workDetails
umbrella permit for high rise sprinler ordinance 377-93 compliance. no work | ||
| Mar 26, 2010 | Completed final sign-off Jun 2010 | 761 Post St | Anderson, Rowe & Buckley, Inc. | comply with pid nov# 200993153-umbrella work-t.i. to (e) fire sprinkler system. 46 added sprinkler & 15 relocated sprinklers, all floorsDetails
comply with pid nov# 200993153-umbrella work-t.i. to (e) fire sprinkler system. 46 added sprinkler & 15 relocated sprinklers, all floors | $9,200 |
| Jul 17, 2008 | Completed final sign-off Sep 2008 | 761 Post St | Pacific Auxiliary Fire Alarm | addition of 4 smoke detectors, 1 relay & 1 relay module to control the new fire smoke dampersDetails
addition of 4 smoke detectors, 1 relay & 1 relay module to control the new fire smoke dampers | $3,000 |
| Jan 3, 2008 | Completed final sign-off Sep 2008 | 761 Post St | as built drawings and proposed work to correct some duct work and added fsd (fire smoke dampers), ref pa# 200708109478Details
as built drawings and proposed work to correct some duct work and added fsd (fire smoke dampers), ref pa# 200708109478 | $5,000 | |
| Aug 28, 2007 | Completed final sign-off Sep 2007 | 761 Post St | revision to appl. #200504200457. fire department inspector requested accurate as-built of exist. basement sprinkler head layout. this plan to replace old sprinkler plan sheet fs1.0.Details
revision to appl. #200504200457. fire department inspector requested accurate as-built of exist. basement sprinkler head layout. this plan to replace old sprinkler plan sheet fs1.0. | ||
| Aug 10, 2007 | Completed final sign-off Sep 2008 | 761 Post St | renew appn. 200412242126, for final inspectionDetails
renew appn. 200412242126, for final inspection | ||
| Aug 3, 2007 | Completed final sign-off Sep 2008 | 761 Post St | renew 200608098993.Details
renew 200608098993. | $4,000 | |
| Jun 14, 2007 | Completed final sign-off Oct 2007 | 761 Post St | Pacific Auxiliary Fire Alarm | as built fire alarm plans isntall was approvedunder app #200505172623 as built being submitted epr request of the fire inspector revis to app #200505172623Details
as built fire alarm plans isntall was approvedunder app #200505172623 as built being submitted epr request of the fire inspector revis to app #200505172623 | |
| Aug 9, 2006 | Never finaled issued Aug 2006, no final | 761 Post St | revision to women's bathroom layout at basement level, fisture count to remain the same as existing, revision to pa 200504200457Details
revision to women's bathroom layout at basement level, fisture count to remain the same as existing, revision to pa 200504200457 | $4,000 | |
| Jun 20, 2005 | Completed final sign-off Nov 2005 | 761 Post St | Quayle And Company | replace damaged support for awning at front doorDetails
replace damaged support for awning at front door | $3,000 |
| May 17, 2005 | Completed final sign-off Oct 2007 | 761 Post St | Pacific Auxiliary Fire Alarm | legitimate previously illigitimately installed fire alarm system which was installed by others than pafa. fire alarm system will be brought up to current code.Details
legitimate previously illigitimately installed fire alarm system which was installed by others than pafa. fire alarm system will be brought up to current code. | $84,000 |
| May 16, 2005 | Never finaled issued May 2005, no final | 761 Post St | renew app #200412242126 for final inspectionDetails
renew app #200412242126 for final inspection | ||
| Apr 20, 2005 | Completed final sign-off Sep 2008 | 761 Post St | all work on basement level electrical pa3 e2005/02/11/316, e2005/02/11/3116,Details
all work on basement level electrical pa3 e2005/02/11/316, e2005/02/11/3116, | $18,000 | |
| Dec 24, 2004 | Expired or cancelled expired May 2006 | 761 Post St | remove and replace rusted out dryer and hood ducts with new fire damperDetails
remove and replace rusted out dryer and hood ducts with new fire damper | $5,000 | |
| Dec 21, 2004 | Never finaled issued Dec 2004, no final | 761 Post St | Triad Fire Protection System | ti, fire sprinklers. basement area.Details
ti, fire sprinklers. basement area. | $5,000 |
| Nov 30, 2004 | Never finaled issued Nov 2004, no final | 761 Post St | Tom Burke/Omega Solution | exchange damaged sprinker heads with approved listed quick response heads. replacement heads same asDetails
exchange damaged sprinker heads with approved listed quick response heads. replacement heads same as | $2,700 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Summit Dck ,Llc (6), Lusardi Construction Co (4), Pacific Auxiliary Fire Alarm (3), Fire Detection Unlimited (2), Fluoresco Services Llc/Everbrite West Ll (2), Kobuksan Construction (2), Redwood Electric Group Inc (2), Anderson, Rowe & Buckley, Inc., Bobcomm Llc Dba Pacific Das Llc., Northwest Signs, Quayle And Company, Rago Neon Inc., Tom Burke/Omega Solution, Tony Ng Plumbing Co, Triad Fire Protection System
- Architects
- Mike Larkin (2), Kevin James, Michael Garavaglia
- Engineers
- Mark Robison
- Authorized agent-otherss
- Christina Shackley, Sarah Norman
- Designers
- Pacific Das Llc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.