Mike Patrick Larkin
- Listed as
- architect, authorized agent-others
- Firm
- Mike Larkin Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Sep 2026
154 permits since 2000 (architect on 148 permits, authorized agent-others on 6 permits): 97 completed, 17 in progress, 20 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 154.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 1203 Stanyan St | install new roof deck guardrails. install new glass door and windows at 1st floor family room. insulate family room. install new mini-split heating at family room and kitchen. replace existing tub with shower. remodel kitchen including enw cabinets, finishes and appliances.Details
install new roof deck guardrails. install new glass door and windows at 1st floor family room. insulate family room. install new mini-split heating at family room and kitchen. replace existing tub with shower. remodel kitchen including enw cabinets, finishes and appliances. | $49,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 44 Surrey St | Jose Martinez | new heated bathroom installed at basement level. install new gas tankless waterheater at basement level. install new laminate flr at guest room, basement level.Details
new heated bathroom installed at basement level. install new gas tankless waterheater at basement level. install new laminate flr at guest room, basement level. | $25,000 |
| Sep 2, 2026 | Completed final sign-off Sep 2026 | 2655 Broderick St | Fontana Construction, Inc. | to obtain final inspection for work approved under pa#202508294203. all work is complete.Details
to obtain final inspection for work approved under pa#202508294203. all work is complete. | |
| Jul 19, 2026 | In progress filed Jul 2026, not yet issued | 1 Mizpah St | remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel.Details
remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel. | $400,000 | |
| Jul 14, 2026 | In progress issued Jul 2026 | 33 Alta St | Fontana Construction, Inc. | remove and replace the existing roof deck membrane for roof deck. no change in size and layout. no fire to be used.Details
remove and replace the existing roof deck membrane for roof deck. no change in size and layout. no fire to be used. | $20,000 |
| Jun 12, 2026 | In progress issued Jun 2026 | 2448 Greenwich St | K. Brunner & Associates | revision to permit#202510036664. structural revisiondue to as built conditions. addition of 2 windows at rear(north) wall. replace a window with a new glass door at rear wall.Details
revision to permit#202510036664. structural revisiondue to as built conditions. addition of 2 windows at rear(north) wall. replace a window with a new glass door at rear wall. | $8,000 |
| May 29, 2026 | In progress issued Jun 2026 | 3653 Jackson St | Fontana Construction, Inc. | replace (e) garage concrete slab.Details
replace (e) garage concrete slab. | $12,000 |
| May 27, 2026 | In progress filed May 2026, not yet issued | 245 Dorantes Av | adu at 1/f, replace (e) garage with (n) living area, install (n) kitchen and (n) half-bathroom and mech equipment for adu, replace (e) furnaces for house, replace (e) water heater, install (n) wood and glass doors at front and back of adu.Details
adu at 1/f, replace (e) garage with (n) living area, install (n) kitchen and (n) half-bathroom and mech equipment for adu, replace (e) furnaces for house, replace (e) water heater, install (n) wood and glass doors at front and back of adu. | $150,000 | |
| May 26, 2026 | In progress issued Jun 2026 | 460 Filbert St | Douglas Gower Dba Mesa Construction | unit#: 1-3; replace (e) alum windows at front w/new insulated alum windows. no change to location to location or size. three window total. replace (e) wood shingles at front with hardie shingles.Details
unit#: 1-3; replace (e) alum windows at front w/new insulated alum windows. no change to location to location or size. three window total. replace (e) wood shingles at front with hardie shingles. | $25,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 318 Spear St | Mountain Top Construction Llc | unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like.Details
unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like. | $80,000 |
| Jan 20, 2026 | In progress issued Jan 2026 | 2627 21st St | Jose Martinez | reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodelDetails
reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodel | $100,000 |
| Jan 8, 2026 | In progress issued May 2026 | 1590 Union St | Jose Martinez | convert 2/f office space (1590a) to state adu (1 bed & 1 bath) 750sf. remodel (e) kitchen with new cabinets, appliances and finishes. remodel bathroom, new vent, new finishes and fixtures. new wiring and lighting throughout. new washer/dryer in-unit.Details
convert 2/f office space (1590a) to state adu (1 bed & 1 bath) 750sf. remodel (e) kitchen with new cabinets, appliances and finishes. remodel bathroom, new vent, new finishes and fixtures. new wiring and lighting throughout. new washer/dryer in-unit. | $68,500 |
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 2635 Scott St | Fontana Construction, Inc. | interior remodel of kitchen, fixtures remain in existing locations, new appliances and cabinets and finishes. replace 2 windows in kind with clad wood insulated units.Details
interior remodel of kitchen, fixtures remain in existing locations, new appliances and cabinets and finishes. replace 2 windows in kind with clad wood insulated units. | $60,000 |
| Oct 14, 2025 | In progress issued Feb 2026 | 2448 Greenwich St | K. Brunner & Associates | rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations.Details
rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations. | $100,000 |
| Oct 9, 2025 | In progress issued Nov 2025 | 3531 Vicente St | new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposedDetails
new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposed | $20,000 | |
| Sep 15, 2025 | Completed final sign-off Sep 2026 | 2655 Broderick St | Fontana Construction, Inc. | revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & installDetails
revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & install | $70,000 |
| Sep 3, 2025 | In progress issued Jan 2026 | 33 Retiro Wy | J Farley Construction | revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door.Details
revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door. | |
| Aug 29, 2025 | Expired or cancelled expired Sep 2026 | 2655 Broderick St | Fontana Construction, Inc. | remodel of master bathroom at 3rd fl. replace fixtures and finishes. replace hardwood flooring throughout house.Details
remodel of master bathroom at 3rd fl. replace fixtures and finishes. replace hardwood flooring throughout house. | $70,000 |
| Jul 14, 2025 | Completed final sign-off Apr 2026 | 3653 Jackson St | Fontana Construction, Inc. | remodel (e) laundry room at basement level. replace lighting and flooring. repair (e) front gate wall at entrance area. all finishes and doors to be replaced to match existing.Details
remodel (e) laundry room at basement level. replace lighting and flooring. repair (e) front gate wall at entrance area. all finishes and doors to be replaced to match existing. | $15,000 |
| Jul 11, 2025 | Completed final sign-off Aug 2026 | 2376 46th Av | E & E General Builder Inc | new rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0"Details
new rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0" | $100,000 |
| May 22, 2025 | In progress issued Jun 2025 | 33 Retiro Wy | J Farley Construction | addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior.Details
addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior. | $125,000 |
| Mar 24, 2025 | Completed final sign-off Aug 2026 | 1851 40th Av | F C Company | remodel 1st and 2nd floors. addition of 299 sf at first floor within (e) envelope. (n) bedroom,bathroom, and laundry room. install (n) sliding glass door and windows at rear facade. install (n) siding at rear facade. upgrade main panel and remove interior (e) fireplaceDetails
remodel 1st and 2nd floors. addition of 299 sf at first floor within (e) envelope. (n) bedroom,bathroom, and laundry room. install (n) sliding glass door and windows at rear facade. install (n) siding at rear facade. upgrade main panel and remove interior (e) fireplace | $180,000 |
| Mar 12, 2025 | Expired or cancelled expired Jun 2026 | 1590 22nd Av | Perez Construction Llc. | revision to 202407176698. revise north property line foundation detail due to e monolithic foundationDetails
revision to 202407176698. revise north property line foundation detail due to e monolithic foundation | |
| Feb 24, 2025 | In progress issued Feb 2025 | 245 Euclid Av | Fontana Construction, Inc. | repair waterproofing at 3rd fl shower, replace floor & wall tile. replace wall tile at powder bath below (2nd fl). no exterior workDetails
repair waterproofing at 3rd fl shower, replace floor & wall tile. replace wall tile at powder bath below (2nd fl). no exterior work | $20,000 |
| Feb 12, 2025 | Completed final sign-off Feb 2026 | 387 Corbett Av | remodel kitchen , including cabinets, appliances, and led lighting. install bathroom at closet location at 1st floor, install shower at bathroom location, install half bath at 2nd floor. relocate the electrical panel from south to north wall.Details
remodel kitchen , including cabinets, appliances, and led lighting. install bathroom at closet location at 1st floor, install shower at bathroom location, install half bath at 2nd floor. relocate the electrical panel from south to north wall. | $25,000 | |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 3501 Laguna St | Corado Builders Inc | install (n) gaco waterproofing membrane at balaconies to replace (e) membraneDetails
install (n) gaco waterproofing membrane at balaconies to replace (e) membrane | $30,000 |
| Nov 14, 2024 | Completed final sign-off Mar 2025 | 2869 Clay St | Fontana Construction, Inc. | remodel unit including install (n) powder room remodel 2 (e) bathrooms new led lighting at select locations create (n) closet at office create (n) study room adjacent to mbr install (n) washer/dryer at hallwayDetails
remodel unit including install (n) powder room remodel 2 (e) bathrooms new led lighting at select locations create (n) closet at office create (n) study room adjacent to mbr install (n) washer/dryer at hallway | $130,000 |
| Sep 17, 2024 | Completed final sign-off Sep 2025 | 66 Mirabel Av | Jose Martinez | revision to pa 202311060197 adjust location of 2 front entry doors due to existing conditions. no other work proposedDetails
revision to pa 202311060197 adjust location of 2 front entry doors due to existing conditions. no other work proposed | |
| Aug 14, 2024 | Completed final sign-off Apr 2025 | 2134 Steiner St | Dan Mccann Construction | remove and replace (e) wood deck, guard rails and footings due to dry rot at rear yard. deck is not visible from street and is 45 " above gradeDetails
remove and replace (e) wood deck, guard rails and footings due to dry rot at rear yard. deck is not visible from street and is 45 " above grade | $10,000 |
| Aug 9, 2024 | Completed final sign-off Jan 2025 | 1528 Noe St | Top Generation Builders Inc | replace wood guardrail on (e) garage roof deck and add steel handrail at (e) concrete entry stairs facing front of street.Details
replace wood guardrail on (e) garage roof deck and add steel handrail at (e) concrete entry stairs facing front of street. | $5,000 |
| Aug 9, 2024 | Completed final sign-off Apr 2025 | 44 Surrey St | Jose Martinez | install a new french drain and catch basin at the basement. replace (e) electrical outlet.Details
install a new french drain and catch basin at the basement. replace (e) electrical outlet. | $6,000 |
| Jul 29, 2024 | Completed final sign-off Jul 2026 | 1590 22nd Av | Perez Construction Llc. | addition of 836 sf heated area (no addition to building envelope) including new radiant heating, new bathroom, bedroom, study, and exercise room. new connecting stairway between floor levels. remodel kitchen and alter selected walls. infill (e) lightwell (52 sf) as part of kitchen remodel.Details
addition of 836 sf heated area (no addition to building envelope) including new radiant heating, new bathroom, bedroom, study, and exercise room. new connecting stairway between floor levels. remodel kitchen and alter selected walls. infill (e) lightwell (52 sf) as part of kitchen remodel. | $500,000 |
| Jul 5, 2024 | In progress filed Jul 2024, not yet issued | 442 South Van Ness Av | remove (e) wall shingles and restore (e) wood siding and trims.Details
remove (e) wall shingles and restore (e) wood siding and trims. | $10,000 | |
| May 16, 2024 | Completed final sign-off May 2025 | 3007 California St | revision to permit# 202104289495: remove gas fired fireplace and install hydronic heating. add drain and step at front yard area.Details
revision to permit# 202104289495: remove gas fired fireplace and install hydronic heating. add drain and step at front yard area. | $2,000 | |
| May 10, 2024 | Completed final sign-off May 2025 | 3007 California St | rev to pa# 2021-0426-9334; remove gas fire place and install hydronic heating for unitDetails
rev to pa# 2021-0426-9334; remove gas fire place and install hydronic heating for unit | $3,000 | |
| Feb 13, 2024 | Completed final sign-off Jul 2025 | 1725 Kearny St | Yerba Buena Builders Inc | remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior.Details
remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior. | $100,000 |
| Feb 9, 2024 | Expired or cancelled cancelled Mar 2024 | 1590 Union St | Jose Martinez | legalization of existing unit# 1590 a at second floor level. no change to building exterior. remodel kitchen and bathroom. no structural work proposed.Details
legalization of existing unit# 1590 a at second floor level. no change to building exterior. remodel kitchen and bathroom. no structural work proposed. | $40,000 |
| Jan 8, 2024 | Completed final sign-off Dec 2024 | 101 Lombard St | Fontana Construction, Inc. | unit# 808: remodel unit including kitchen and 2 bathrooms, fixtures to remain in (e) locations, replace all recessed light fixtures and interior doors, install new lighting at selected locations, install new flooring at selected locations. all (e) required fire ratings shall be maintained.Details
unit# 808: remodel unit including kitchen and 2 bathrooms, fixtures to remain in (e) locations, replace all recessed light fixtures and interior doors, install new lighting at selected locations, install new flooring at selected locations. all (e) required fire ratings shall be maintained. | $250,000 |
| Dec 29, 2023 | Expired or cancelled withdrawn Sep 2024 | 1843 43rd Av | Advanced Design General Contractor | replace (e) windows with marvin elevate series. repalce garage door with new painted wood unit per elevation drawing. permit# 202312051912 is associated with address fort interior remodel work. wood aluminum clad at frontDetails
replace (e) windows with marvin elevate series. repalce garage door with new painted wood unit per elevation drawing. permit# 202312051912 is associated with address fort interior remodel work. wood aluminum clad at front | $25,000 |
| Dec 5, 2023 | Completed final sign-off May 2026 | 1843 43rd Av | Advanced Design General Contractor | remodel (e) kitchen & bathroom, add new bathroom on 2/f, replace (e) wh and furnace. replace (2) skylights in kind and add one skylight.Details
remodel (e) kitchen & bathroom, add new bathroom on 2/f, replace (e) wh and furnace. replace (2) skylights in kind and add one skylight. | $95,000 |
| Nov 6, 2023 | Completed final sign-off Sep 2025 | 66 Mirabel Av | Jose Martinez | remodel 2 units including replacement of mechanical, plumbing & electrical system. replacement of all windows & installation of insulation throughout. ground floor addition of 404 ft of heated space within garage envelope. infill (e) lightwell. replace stucco facade with new painted wood siding.Details
remodel 2 units including replacement of mechanical, plumbing & electrical system. replacement of all windows & installation of insulation throughout. ground floor addition of 404 ft of heated space within garage envelope. infill (e) lightwell. replace stucco facade with new painted wood siding. | $460,000 |
| Oct 24, 2023 | In progress issued Oct 2023 | 44 Surrey St | repair foundation damage at the front property line wall, basement level 11'-0" length of footing.Details
repair foundation damage at the front property line wall, basement level 11'-0" length of footing. | $2,000 | |
| Sep 13, 2023 | Completed final sign-off Jan 2024 | 624 Carolina St | construct new retaining wall @ rear of property, 8'-0" max height to maintain existing grade - no new fillDetails
construct new retaining wall @ rear of property, 8'-0" max height to maintain existing grade - no new fill | $10,000 | |
| Jul 13, 2023 | Completed final sign-off Jul 2023 | 477 Vallejo St | Caruso Construction Inc. | laundry closet legalization. unit 477Details
laundry closet legalization. unit 477 | $1,800 |
| Jun 13, 2023 | Completed final sign-off Jan 2024 | 240 Clipper St | install new wetbar @ 1st fl level including sink, ref and cabinetDetails
install new wetbar @ 1st fl level including sink, ref and cabinet | $20,000 | |
| Jun 8, 2023 | Completed final sign-off May 2024 | 1111 York St | remodel bathroom 35 sf @ rear of home; addition of bathroom 34 sf rear of house (interior); moving existing wallDetails
remodel bathroom 35 sf @ rear of home; addition of bathroom 34 sf rear of house (interior); moving existing wall | $40,000 | |
| Mar 9, 2023 | Completed final sign-off Nov 2023 | 88 Rossi Av | Rockaway Construction Inc. | kitchen remodel. change floor. cabinet, fixtures, relocate non load bearing wall. bath remodel;. closet remodel.Details
kitchen remodel. change floor. cabinet, fixtures, relocate non load bearing wall. bath remodel;. closet remodel. | $50,000 |
| Jan 31, 2022 | Completed final sign-off Nov 2022 | 1113 York St | Rinaldi Construction | remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel.Details
remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel. | $60,000 |
| Jun 28, 2021 | Completed final sign-off Nov 2023 | 330 Baden St | E & E General Builder Inc | underpinning of 330 baden st to stabalize foundation as we plan to do work on adjecent home 324 baden st, related to pa #202010106309.Details
underpinning of 330 baden st to stabalize foundation as we plan to do work on adjecent home 324 baden st, related to pa #202010106309. | $7,000 |
| Apr 28, 2021 | Completed final sign-off May 2025 | 3007 California St | Hl81 Construction Inc. | convert garage into adu w/ new windows & door w/ new entry courtyard with permeable pavers & landscaping. concurrent legalization permit application 2021.0426.9334 for an udu in rear yard structure. existing bldg has 2 legal units & this adu permit & legalization permits would result in 4 legal dus.Details
convert garage into adu w/ new windows & door w/ new entry courtyard with permeable pavers & landscaping. concurrent legalization permit application 2021.0426.9334 for an udu in rear yard structure. existing bldg has 2 legal units & this adu permit & legalization permits would result in 4 legal dus. | $50,000 |
| Apr 26, 2021 | Completed final sign-off May 2025 | 3007 California St | unit legalization per ord. 43-14 (1 unit): rear yard structure. concurrent with 202104289495 (adu permit), approval of both = increase from 2 to 4 dus.Details
unit legalization per ord. 43-14 (1 unit): rear yard structure. concurrent with 202104289495 (adu permit), approval of both = increase from 2 to 4 dus. | $40,000 | |
| Apr 22, 2021 | Completed final sign-off Apr 2023 | 479 Ellis St | amending of building permit application #201812249080 to comply with accessible building entrance ordinance no. 51-16Details
amending of building permit application #201812249080 to comply with accessible building entrance ordinance no. 51-16 | $8,000 | |
| Apr 13, 2021 | Never finaled issued Aug 2021, no final | 1386 Masonic Av | Fontana Construction, Inc. | install (n) w-60 fire-resistance rated window at north elevation side of house. basement window cannot be seen from street.Details
install (n) w-60 fire-resistance rated window at north elevation side of house. basement window cannot be seen from street. | $1,000 |
| Feb 19, 2021 | Completed final sign-off Nov 2022 | 324 Baden St | E & E General Builder Inc, Dimension Construction Inc | revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heatDetails
revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heat | $80,000 |
| Feb 17, 2021 | Never finaled issued Apr 2021, no final | 4630 19th St | Talbco Development Corp Dba Supreme Buil | interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size.Details
interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size. | $14,000 |
| Feb 4, 2021 | Completed final sign-off Aug 2023 | 62 Webster St | Pioneer Builders | replacement of (e) deck & stair; no change to size. replacement in-kind. replace (e) window at building side and (e) sliding glass door at rear. now work to front of buildingDetails
replacement of (e) deck & stair; no change to size. replacement in-kind. replace (e) window at building side and (e) sliding glass door at rear. now work to front of building | $16,000 |
| Feb 2, 2021 | Completed final sign-off Jun 2021 | 1386 Masonic Av | Fontana Construction, Inc. | revision to pa# 202007079706, repair to (e) interior stair, less than 50% of stair repair. replace 1x tread and riser boards. no change to stair stringers or framing.Details
revision to pa# 202007079706, repair to (e) interior stair, less than 50% of stair repair. replace 1x tread and riser boards. no change to stair stringers or framing. | $2,000 |
| Jan 26, 2021 | Never finaled issued Apr 2021, no final | 114 Broderick St | remodel of master bedroom and bathroom. replace 3 rear windows at master bedroom. remove 1 extg bathroom window and replace with/new unit. repair water damaged wood siding and trim at south side of building. replace extg vanity of 2nd fl. bathroom + minor electrical adjusments to switch and outlets.Details
remodel of master bedroom and bathroom. replace 3 rear windows at master bedroom. remove 1 extg bathroom window and replace with/new unit. repair water damaged wood siding and trim at south side of building. replace extg vanity of 2nd fl. bathroom + minor electrical adjusments to switch and outlets. | $75,000 | |
| Jan 8, 2021 | Expired or cancelled cancelled Jan 2026 | 665 Carolina St | Kiely Construction | apt 21: rev to pa202011128687: open up 2 walls in kitchen and install dropped beams.Details
apt 21: rev to pa202011128687: open up 2 walls in kitchen and install dropped beams. | $2,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2023 | 1725 Kearny St | Talbco Development Corp Dba Supreme Buil | perform voluntary seismic upgrade.Details
perform voluntary seismic upgrade. | $90,000 |
| Nov 12, 2020 | Completed final sign-off Sep 2021 | 222 Bella Vista Wy | Winder Construction Inc. | (e) kitchen upgrade, sink, cabs & appliances. (n) siding glass door at family room.Details
(e) kitchen upgrade, sink, cabs & appliances. (n) siding glass door at family room. | $49,000 |
| Nov 10, 2020 | Never finaled issued Nov 2020, no final | 488 Folsom St | Aguilera Construction Company | install pocket door at den per plan.Details
install pocket door at den per plan. | $5,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2023 | 1725 Kearny St | Talbco Development Corp Dba Supreme Buil | common area.front facade water damage repair including:remove(e)vinyl louvers and replace w/(n)painted alum.louvers.replace(e)damaged wood guardrail walls with wood.replace(e)rotted wood and glass screens w/(n)wood glass screen.replace(e)stucco & selected glass door in kind.Details
common area.front facade water damage repair including:remove(e)vinyl louvers and replace w/(n)painted alum.louvers.replace(e)damaged wood guardrail walls with wood.replace(e)rotted wood and glass screens w/(n)wood glass screen.replace(e)stucco & selected glass door in kind. | $90,000 |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 651 29th St | Norman Charles Construction | revision to pa #2020-1007-6073: install (n) interiro barn door at laundry room. remove (e) french door and install (n) french door at rear wall. install (n) exterior light at french door location. install (n) plumbing fixtures at master bedroom.Details
revision to pa #2020-1007-6073: install (n) interiro barn door at laundry room. remove (e) french door and install (n) french door at rear wall. install (n) exterior light at french door location. install (n) plumbing fixtures at master bedroom. | $30,000 |
| Aug 12, 2020 | Completed final sign-off May 2022 | 1386 Masonic Av | Fontana Construction, Inc. | repair extensive water damage at front stair, garage ceiling & front house wall. replace (e) materials with new to match (e) style and finish. replace damaged wood shingles and wood trim at facade and flashings.Details
repair extensive water damage at front stair, garage ceiling & front house wall. replace (e) materials with new to match (e) style and finish. replace damaged wood shingles and wood trim at facade and flashings. | $70,000 |
| Jul 7, 2020 | Completed final sign-off Jun 2021 | 1386 Masonic Av | Fontana Construction, Inc. | remodel basement level including bathrm & install (n) furnace; replace wh w/(n) tankless wh. new addition of heated space within (e) bldg envelope is 555sf. install (n) led lighting throughout remodeled space (exercise rm & bathrm).Details
remodel basement level including bathrm & install (n) furnace; replace wh w/(n) tankless wh. new addition of heated space within (e) bldg envelope is 555sf. install (n) led lighting throughout remodeled space (exercise rm & bathrm). | $95,000 |
| Jun 25, 2020 | Completed final sign-off Apr 2021 | 79 Farnsworth Ln | Jose Martinez | revision to pa# 201901079748. mech equip relocated per instructions of inspector. room layout altered due to mechanical change. no change to exterior. no structural change.Details
revision to pa# 201901079748. mech equip relocated per instructions of inspector. room layout altered due to mechanical change. no change to exterior. no structural change. | $4,000 |
| Feb 24, 2020 | Never finaled filed Feb 2020, never issued | 359 Hyde St | Talbco Development Corp Dba Supreme Buil | remove (e) accessibliity obstructions at store entrances (3) at 601/609/611 ellis street side. to comply with accessible business entrance program per oridnance 51-16.Details
remove (e) accessibliity obstructions at store entrances (3) at 601/609/611 ellis street side. to comply with accessible business entrance program per oridnance 51-16. | $45,000 |
| Jan 30, 2020 | Completed final sign-off Jan 2024 | 330 Baden St | E & E General Builder Inc | new 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade.Details
new 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade. | $150,000 |
| Jan 27, 2020 | Completed final sign-off Jan 2022 | 539 07th Av | Tenisi Construction | revision to permit #2019/0110/0036. proposed height to kitchen roof to be raised 15" above previously approved height. no other change proposedDetails
revision to permit #2019/0110/0036. proposed height to kitchen roof to be raised 15" above previously approved height. no other change proposed | $1,500 |
| Jan 7, 2020 | Completed final sign-off Feb 2026 | 1559 47th Av | Mircea Ilie Construction | rear yard addition of 1,217 sf including: new family room, bedroom & bathroom at 1st flr level. new bathroom & remodeled kitchen & bathroom at 2nd flr level. new roof deck over the rear addition.Details
rear yard addition of 1,217 sf including: new family room, bedroom & bathroom at 1st flr level. new bathroom & remodeled kitchen & bathroom at 2nd flr level. new roof deck over the rear addition. | $300,000 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 639 18th Av | Jose Martinez | revision to permit #201810153229. remove interior wall per plan at 3rd fl level.Details
revision to permit #201810153229. remove interior wall per plan at 3rd fl level. | $8,000 |
| Dec 3, 2019 | Never finaled issued Sep 2022, no final | 44 Surrey St | construct 2 car garage under (e) house. replace entry steps. construct curb cut. install roof deck & guardrails and planters above garage. replace (e) window w/ (n) wood french door at front facade.Details
construct 2 car garage under (e) house. replace entry steps. construct curb cut. install roof deck & guardrails and planters above garage. replace (e) window w/ (n) wood french door at front facade. | $140,000 | |
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 211 Sutter St | Jose Martinez | change of use from retail to limited restaurant. install prep kitchen.Details
change of use from retail to limited restaurant. install prep kitchen. | $7,500 |
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 114 Broderick St | Ikb Stone Inc | remodel bathroom, add laundry closetDetails
remodel bathroom, add laundry closet | $15,000 |
| May 30, 2019 | Expired or cancelled withdrawn Nov 2020 | 463 Castro St | change of use from retail to limited restaurant. no physical work. mep under separate permit.Details
change of use from retail to limited restaurant. no physical work. mep under separate permit. | $7,500 | |
| May 23, 2019 | Never finaled filed May 2019, never issued | 1412 Clayton St | proposed work to correc violations #201877053 & #200679731. (n) addition of 1460 sq ft (incl garage) @ backyard & including a proposed adu per ordinance 162-16Details
proposed work to correc violations #201877053 & #200679731. (n) addition of 1460 sq ft (incl garage) @ backyard & including a proposed adu per ordinance 162-16 | $200,000 | |
| Mar 20, 2019 | Completed final sign-off Jan 2022 | 2731 California St | Talbco Development Corp Dba Supreme Buil | new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a**Details
new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a** | $100,000 |
| Jan 10, 2019 | Completed final sign-off Dec 2021 | 539 07th Av | Tenisi Construction | 2/f - rear addition -kitchen addition of 55 s.f. remodel kitchen, new bathroom at 2nd floor level. remove (e) bathroom.Details
2/f - rear addition -kitchen addition of 55 s.f. remodel kitchen, new bathroom at 2nd floor level. remove (e) bathroom. | $50,000 |
| Jan 8, 2019 | Completed final sign-off Feb 2021 | 2362 42nd Av | remodel kitchen and bathrooms and living areas at 2nd floor, remove selected wall per plan, install new moment frame and beams per structural, replace all windows and insulate house.Details
remodel kitchen and bathrooms and living areas at 2nd floor, remove selected wall per plan, install new moment frame and beams per structural, replace all windows and insulate house. | $125,000 | |
| Jan 8, 2019 | Completed final sign-off Feb 2021 | 2362 42nd Av | legalize unit per ordinance 43-14.legalize (e) unpermitted unit @ ground floor . to comply with violation #201716051.Details
legalize unit per ordinance 43-14.legalize (e) unpermitted unit @ ground floor . to comply with violation #201716051. | $20,000 | |
| Jan 7, 2019 | Completed final sign-off Apr 2021 | 79 Farnsworth Ln | Jose Martinez | construct (n) 765 sf adu with bathroom, kitchen & one bedroom. install (n) clad wood windows per plans. detail to match (e) house. install (n) concrete steps and retaining wall for adu access. adu per ordinance 95-17.Details
construct (n) 765 sf adu with bathroom, kitchen & one bedroom. install (n) clad wood windows per plans. detail to match (e) house. install (n) concrete steps and retaining wall for adu access. adu per ordinance 95-17. | $150,000 |
| Nov 19, 2018 | Expired or cancelled expired Feb 2020 | 535 07th Av | Tenisi Construction | install new soil permation grouting at south foundation wall grout underpinning during construction of adjacvent property in association with permit application 201604205217Details
install new soil permation grouting at south foundation wall grout underpinning during construction of adjacvent property in association with permit application 201604205217 | $6,000 |
| Nov 19, 2018 | Expired or cancelled expired Feb 2020 | 539 07th Av | Tenisi Construction | install new soil permeation grouting at north foundation wall in association with permit application 201604205217Details
install new soil permeation grouting at north foundation wall in association with permit application 201604205217 | $6,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2019 | 1625 Lake St | Cs Construction | remove 6'-0" length of kitchen wall per plan (3rd fl). new kitchen cabinets & appliances. no work at lower levelsDetails
remove 6'-0" length of kitchen wall per plan (3rd fl). new kitchen cabinets & appliances. no work at lower levels | $19,000 |
| May 24, 2018 | Completed final sign-off Sep 2018 | 3350 Laguna St | Jose Martinez | 3rd fl. kitchen remodel, selected openings at kitchen wallDetails
3rd fl. kitchen remodel, selected openings at kitchen wall | $42,000 |
| May 7, 2018 | Never finaled issued May 2018, no final | 381 Corbett Av | Ace Drilling & Excavation | revision to pa 2016-0315-2089 new soils report provided. foundation design upgraded to pier and grade beam system. no other changesDetails
revision to pa 2016-0315-2089 new soils report provided. foundation design upgraded to pier and grade beam system. no other changes | $25,000 |
| Mar 19, 2018 | Completed final sign-off Dec 2019 | 2137 Grove St | revision to 201612054191 relocate ground fl bathroom due to sewer lateral depth. adjust stair location due to change. revise ezterior rear stair to be wood framing (value engeering)Details
revision to 201612054191 relocate ground fl bathroom due to sewer lateral depth. adjust stair location due to change. revise ezterior rear stair to be wood framing (value engeering) | ||
| Oct 10, 2017 | Completed final sign-off Dec 2019 | 72 Elsie St | E & E General Builder Inc | removal of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen.Details
removal of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen. | $100,000 |
| Sep 13, 2017 | Completed final sign-off Sep 2018 | 232 Colon Av | remodel existing first floor bathroom (above garage). replace bathroom window (rear yard location), no work proposed to exterior other window replacement.Details
remodel existing first floor bathroom (above garage). replace bathroom window (rear yard location), no work proposed to exterior other window replacement. | $12,000 | |
| Aug 22, 2017 | Completed final sign-off Dec 2017 | 1531 Noe St | E & E General Builder Inc | remove (e) bad foundation 14' long x 3'6" hight and build new foundation per code.Details
remove (e) bad foundation 14' long x 3'6" hight and build new foundation per code. | $24,000 |
| Mar 24, 2017 | Completed final sign-off Nov 2017 | 221 07th Av | Pioneer Builders | revision to 201611102407: install new laundry rm garage level.Details
revision to 201611102407: install new laundry rm garage level. | $9,000 |
| Mar 1, 2017 | Completed final sign-off Jan 2018 | 360 Arguello Bl | Fontana Construction, Inc. | install new 42" high guradrail at small rear yard roof. install new tiles over roof. replace rear yard window with clad wood sliding door. ref pa #201604064078-s/r1.Details
install new 42" high guradrail at small rear yard roof. install new tiles over roof. replace rear yard window with clad wood sliding door. ref pa #201604064078-s/r1. | $10,000 |
| Jan 10, 2017 | Expired or cancelled cancelled Aug 2018 | 333 Linden St | Pioneer Builders | new facade work including new windows & doors, remvoe (e) stucco & install new materials per elevation, remove (e) fire escape, construct 2 new accessible bathrooms.Details
new facade work including new windows & doors, remvoe (e) stucco & install new materials per elevation, remove (e) fire escape, construct 2 new accessible bathrooms. | $80,000 |
| Dec 5, 2016 | Completed final sign-off Dec 2019 | 2137 Grove St | add 942 sf @ ground level include bathroom, closets & bedroom & new interior stair. add 69 sf @ 2nd level & 3rd level (family rooms). remodel kitchen & bathroom within both flats. construct new master bathroom & closet within both flats. remove rear stair & deck & replace with new steel stairs &deckDetails
add 942 sf @ ground level include bathroom, closets & bedroom & new interior stair. add 69 sf @ 2nd level & 3rd level (family rooms). remodel kitchen & bathroom within both flats. construct new master bathroom & closet within both flats. remove rear stair & deck & replace with new steel stairs &deck | $400,000 | |
| Aug 29, 2016 | Never finaled issued Jun 2018, no final | 815 Rhode Island St | Andrew Moore Consulting | remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft.Details
remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft. | $30,000 |
| Apr 20, 2016 | Completed final sign-off Apr 2022 | 539 07th Av | Tenisi Construction | horizontal addition. habitable space at ground level including full bathroom and wet bar. new roof deck above addition and stairs to yard.Details
horizontal addition. habitable space at ground level including full bathroom and wet bar. new roof deck above addition and stairs to yard. | $135,000 |
| Dec 16, 2015 | Completed final sign-off Aug 2016 | 2273 California St | Fontana Construction, Inc. | revision to pa#201509086334, framing change at kitchen wall on 2/f. n/a ordinance #155-13Details
revision to pa#201509086334, framing change at kitchen wall on 2/f. n/a ordinance #155-13 | $500 |
| Oct 22, 2015 | Completed final sign-off Oct 2018 | 432 Urbano Dr | remodel interior of house and replace all single pane windows. new windows at front to match (e) style and material. replace furnace and w/h. remodel ground flor and create 834 sf of new habitable space remodel 2 bedrooms, 1 bathroom and family room. construct new stairsDetails
remodel interior of house and replace all single pane windows. new windows at front to match (e) style and material. replace furnace and w/h. remodel ground flor and create 834 sf of new habitable space remodel 2 bedrooms, 1 bathroom and family room. construct new stairs | $170,000 | |
| Sep 8, 2015 | Completed final sign-off Aug 2016 | 2273 California St | Fontana Construction, Inc. | revision to 201506260037. framing revision for opening at kitchen wall. install spray foam insulation at roof framing at master bedroom location. compliance with maher ordinance no 155-13 not required.Details
revision to 201506260037. framing revision for opening at kitchen wall. install spray foam insulation at roof framing at master bedroom location. compliance with maher ordinance no 155-13 not required. | $2,000 |