Courtney Miller
- Listed as
- architect
- On San Francisco permits
- Feb 2020 to Dec 2022
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 1035 Fillmore St | Progress Builders | ti renovation to e restroom to fully accessible/ all gender restroom, plumbing & electrical upgrade to provide for hair salon, new 3 5/8" metal furring walls within 2' of ceiling braces to adjacent concrete wall- 1hr separation, replacement lighting & thru wall heat pump for heating & cooling.Details
ti renovation to e restroom to fully accessible/ all gender restroom, plumbing & electrical upgrade to provide for hair salon, new 3 5/8" metal furring walls within 2' of ceiling braces to adjacent concrete wall- 1hr separation, replacement lighting & thru wall heat pump for heating & cooling. | $30,000 |
| Apr 26, 2021 | Completed final sign-off May 2025 | 3007 California St | unit legalization per ord. 43-14 (1 unit): rear yard structure. concurrent with 202104289495 (adu permit), approval of both = increase from 2 to 4 dus.Details
unit legalization per ord. 43-14 (1 unit): rear yard structure. concurrent with 202104289495 (adu permit), approval of both = increase from 2 to 4 dus. | $40,000 | |
| Apr 22, 2021 | Completed final sign-off Jan 2024 | 400 Geary St | Field Construction Inc. | tile/ wainscoting facade replacement and waterproofing project along geary st and mason st. floor tile replacement and new doors at conner/pass thru storage room w/ waterproofing.Details
tile/ wainscoting facade replacement and waterproofing project along geary st and mason st. floor tile replacement and new doors at conner/pass thru storage room w/ waterproofing. | $40,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 1996 Union St | O S E Horizon Enterprise | relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outletDetails
relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outlet | $55,000 |