O S E Horizon Enterprise
- Based in
- Alameda
- On San Francisco permits
- Oct 2015 to Aug 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 30 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2024 | Completed final sign-off Jan 2025 | 776 Victoria St | revision to pa# 2024-0320-8213 revised structural drawings due to site conditionDetails
revision to pa# 2024-0320-8213 revised structural drawings due to site condition | |
| Apr 16, 2024 | Completed final sign-off Jan 2025 | 776 Victoria St | interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet.Details
interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet. | $50,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 872 Lombard St | renovate existing kitchen, replace cabinets and counter inkind, 70sfDetails
renovate existing kitchen, replace cabinets and counter inkind, 70sf | $12,000 |
| Nov 29, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundryDetails
revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundry | $10,000 |
| Nov 7, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | repair floor framingDetails
repair floor framing | $5,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom.Details
renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom. | $130,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system.Details
remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system. | $85,000 |
| Dec 12, 2022 | Completed final sign-off Mar 2023 | 555 06th Av | master bath remodel: wall/layout remain with a shower pan.Details
master bath remodel: wall/layout remain with a shower pan. | $11,500 |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 463 Arlington St | bathroom remodel- in kind ground floor walk in shower, toilet vanity fixture replacementDetails
bathroom remodel- in kind ground floor walk in shower, toilet vanity fixture replacement | $12,000 |
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 49 Hamilton St | (1) bathroom remodel- in kind- replace vanity toilet & fixtures w/ a walk in showerDetails
(1) bathroom remodel- in kind- replace vanity toilet & fixtures w/ a walk in shower | $10,000 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 479 33rd Av | for unit #481: remodel (1) full bath and (1) half bath on 2nd floor. replace in kind. no wall removal.Details
for unit #481: remodel (1) full bath and (1) half bath on 2nd floor. replace in kind. no wall removal. | $12,000 |
| Apr 13, 2022 | Completed final sign-off Jul 2022 | 479 33rd Av | remodel (1) full bath & (1-1/2) bath with tub, vanity & toilet replacement. work on the top floor only.Details
remodel (1) full bath & (1-1/2) bath with tub, vanity & toilet replacement. work on the top floor only. | $13,500 |
| Sep 16, 2021 | Never finaled issued Sep 2021, no final | 477 Vallejo St | bathroom remodel. no moving walls. lights per cenc 150.0(k).Details
bathroom remodel. no moving walls. lights per cenc 150.0(k). | $10,000 |
| Jun 18, 2021 | Completed final sign-off Jan 2022 | 443 Hazelwood Av | partition 2nd fl bath into 2 separate baths, add wall bisecting (e) bath. open doorway from adjoined primary bdrm to new bath, remove 1 elec outlet, install toilet,shower,vanity in bath adjoining primary bath.Details
partition 2nd fl bath into 2 separate baths, add wall bisecting (e) bath. open doorway from adjoined primary bdrm to new bath, remove 1 elec outlet, install toilet,shower,vanity in bath adjoining primary bath. | $20,000 |
| Apr 8, 2021 | Never finaled issued Apr 2021, no final | 2827 20th St | bathroom remodel in kind.Details
bathroom remodel in kind. | $11,000 |
| Mar 22, 2021 | Completed final sign-off Jun 2021 | 600 Upland Dr | hallway bath in kind remodel. replace existing shower with shower pan. replace toilet, install a vanity and exhaust fan.Details
hallway bath in kind remodel. replace existing shower with shower pan. replace toilet, install a vanity and exhaust fan. | $15,000 |
| Feb 19, 2021 | Completed final sign-off Jun 2021 | 600 Upland Dr | bathroom remodel in-kind, walk-in shower, tub replacement, vanity replacement, toilet replacementDetails
bathroom remodel in-kind, walk-in shower, tub replacement, vanity replacement, toilet replacement | $10,500 |
| Sep 4, 2020 | Expired or cancelled cancelled Nov 2020 | 680 06th Av | full bath and 1/2 bath remodel. no wall alterationDetails
full bath and 1/2 bath remodel. no wall alteration | $15,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 1996 Union St | relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outletDetails
relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outlet | $55,000 |
| Aug 30, 2019 | Completed final sign-off Feb 2020 | 768 06th Av | reroofingDetails
reroofing | $6,000 |
| Nov 1, 2018 | Completed final sign-off Mar 2020 | 768 06th Av | to comply with nov 201855661 item #2 - 1st flr infill pop out at rear to accomodate a bedrm. convert (e) storage into family rm, 1 bedrm, 1 full bathrm and den. add 1 int stairway for connection btw 1st & 2nd. 2nd flr - reconfig layout add 1 powder rm. 3rd flr: convert (e) bedrm into two bedrms.Details
to comply with nov 201855661 item #2 - 1st flr infill pop out at rear to accomodate a bedrm. convert (e) storage into family rm, 1 bedrm, 1 full bathrm and den. add 1 int stairway for connection btw 1st & 2nd. 2nd flr - reconfig layout add 1 powder rm. 3rd flr: convert (e) bedrm into two bedrms. | $60,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 300 03rd St | hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher.Details
hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher. | $31,500 |
| May 24, 2018 | Completed final sign-off Aug 2018 | 77 Dow Pl | master bath remodel. replace floor & wall tiles w/ new floor & wall tiles. n/a for maher.Details
master bath remodel. replace floor & wall tiles w/ new floor & wall tiles. n/a for maher. | $10,000 |
| May 15, 2018 | Expired or cancelled cancelled Aug 2020 | 768 06th Av | install an ew wall herater. repair for complaints 201855661 / 201860072 /2018659921Details
install an ew wall herater. repair for complaints 201855661 / 201860072 /2018659921 | $2,500 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 2343 19th Av | siding replacement at the backDetails
siding replacement at the back | $3,500 |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 1130 Eddy St | replace three windows and and two sliding doors in kind.Details
replace three windows and and two sliding doors in kind. | $10,000 |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 1130 Eddy St | kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles.Details
kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles. | $38,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2017 | 2918 Van Ness Av | front and rear window replacment. windows at the front will be aluminum in this case fit existing opening.Details
front and rear window replacment. windows at the front will be aluminum in this case fit existing opening. | $7,500 |
| Dec 13, 2016 | Completed final sign-off May 2017 | 699 36th Av | apt 201: ktichen remodel: replace countertop and cabinet. bathroom remodels (guest & master): tile bathroom floor and west area. replace fanity, tub, and remodel shower. no change on walls.Details
apt 201: ktichen remodel: replace countertop and cabinet. bathroom remodels (guest & master): tile bathroom floor and west area. replace fanity, tub, and remodel shower. no change on walls. | $45,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 2918 Van Ness Av | kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath.Details
kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath. | $35,000 |
| Jul 27, 2016 | Completed final sign-off Dec 2016 | 857 Fell St | replace 6 street-facing windows with full wood and double panes. windows will be full wood with ogee lugs to match.Details
replace 6 street-facing windows with full wood and double panes. windows will be full wood with ogee lugs to match. | $5,600 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 857 Fell St | window replacement at the back. not visible from the street.Details
window replacement at the back. not visible from the street. | $5,000 |
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 857 Fell St | remove (e) tub and reinstall (e) to replace bathroom floor tiles.Details
remove (e) tub and reinstall (e) to replace bathroom floor tiles. | $8,000 |
| Oct 21, 2015 | Completed final sign-off Mar 2016 | 553 Clipper St | replace bath tub and retile on 553 clipper st. no wall to be tear down or added. no plumbing changes.Details
replace bath tub and retile on 553 clipper st. no wall to be tear down or added. no plumbing changes. | $3,200 |