Back to kitchen remodel contractors
O S E Horizon Enterprise
- Based in
- Alameda
- On San Francisco permits
- Oct 2015 to Aug 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 30 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 8 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2024 | Completed final sign-off Jan 2025 | 776 Victoria St | interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet.Details
interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet. | $50,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 872 Lombard St | renovate existing kitchen, replace cabinets and counter inkind, 70sfDetails
renovate existing kitchen, replace cabinets and counter inkind, 70sf | $12,000 |
| Nov 29, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundryDetails
revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundry | $10,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom.Details
renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom. | $130,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system.Details
remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system. | $85,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 300 03rd St | hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher.Details
hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher. | $31,500 |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 1130 Eddy St | kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles.Details
kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles. | $38,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 2918 Van Ness Av | kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath.Details
kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath. | $35,000 |