Block 6760, lot 036
199 Burnside Ave
- City’s use
- Single Family Residential
- Built
- 1957
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,076 sq ft
- Lot
- 1,881 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2024 | Expired or cancelled withdrawn May 2024 | 199 Burnside Av | rev 202307202548: minor reduction of scope to remove sheet note on a2.2 #21& covr sht & that supporting membranes for floor and ceiling will not be covered with gypsum 5/8in sheetrock exposing membraines.sepration will mainted per sfbc406.3.2.1.all sheetrock on garage lvl covered under 202206025431.Details
rev 202307202548: minor reduction of scope to remove sheet note on a2.2 #21& covr sht & that supporting membranes for floor and ceiling will not be covered with gypsum 5/8in sheetrock exposing membraines.sepration will mainted per sfbc406.3.2.1.all sheetrock on garage lvl covered under 202206025431. | ||
| Jan 16, 2024 | Completed final sign-off May 2024 | 199 Burnside Av | Caledonia Plastering & Stucco Inc | remove (e) stucco on the front, side and back and replace in kind. approx 1700 sq ft.Details
remove (e) stucco on the front, side and back and replace in kind. approx 1700 sq ft. | $35,000 |
| Nov 7, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | O S E Horizon Enterprise | repair floor framingDetails
repair floor framing | $5,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | O S E Horizon Enterprise | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system.Details
remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system. | $85,000 |
| Oct 17, 2022 | Completed final sign-off Jan 2023 | 199 Burnside Av | Nieto Valle Construction | revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length.Details
revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length. | |
| Jun 2, 2022 | Completed final sign-off Jan 2023 | 199 Burnside Av | Nieto Valle Construction | voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108)Details
voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108) | $94,124 |
| Dec 7, 2018 | Completed final sign-off Jan 2019 | 199 Burnside Av | Mr. Roofing, Inc. | reroofDetails
reroof | $19,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 199 Burnside Av | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nieto Valle Construction (2), O S E Horizon Enterprise (2), Caledonia Plastering & Stucco Inc, Mr. Roofing, Inc.
- Engineers
- Chris Piolo (2), Raymond Situ
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.