Block 0774, lot 021
1025 Fillmore St
- City’s use
- Multi-Family Residential
- Built
- 1974
- Stories
- 12
- Units
- 131
- Rooms
- 131 bathrooms
- Building
- 216,468 sq ft
- Lot
- 66,924 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 1025 Fillmore St | Battalion One Fire Protection | as built 202308184761 revision.Details
as built 202308184761 revision. | |
| Nov 5, 2025 | Completed final sign-off Oct 2026 | 1025 Fillmore St | Sf Glass & Mirror Inc | like for like windows replacement, windows in the front and back of the building, same size, same location, same opening, same material, 60 windows facing the street. u-factor=0.50/shgc= 0.33Details
like for like windows replacement, windows in the front and back of the building, same size, same location, same opening, same material, 60 windows facing the street. u-factor=0.50/shgc= 0.33 | $1,950,000 |
| May 7, 2024 | Completed final sign-off Mar 2025 | 1355 Golden Gate Av | Advanced Home Energy Inc. | ref permits# 202309257365, 202309257370, 202309257371: clarify scope to add sheetrock demo at kitchen and bath plumbing walls and replacement and install tub surround. note: (e) kitchen and bath fixtures to remain. remove replacement of heater risers from scope of work under pa# 202309257365/7370/71Details
ref permits# 202309257365, 202309257370, 202309257371: clarify scope to add sheetrock demo at kitchen and bath plumbing walls and replacement and install tub surround. note: (e) kitchen and bath fixtures to remain. remove replacement of heater risers from scope of work under pa# 202309257365/7370/71 | |
| Apr 9, 2024 | Completed final sign-off Feb 2026 | 1025 Fillmore St | Lynn Safety Inc. | installation roof top equipment for exterior building maintenance.Details
installation roof top equipment for exterior building maintenance. | $173,000 |
| Mar 13, 2024 | In progress issued Jun 2025 | 1025 Fillmore St | Battalion One Fire Protection | remove existing (6) fire sprinklers in roof level elevator mechanical room and top of shaft, per state elevator inspectorDetails
remove existing (6) fire sprinklers in roof level elevator mechanical room and top of shaft, per state elevator inspector | $3,500 |
| Sep 25, 2023 | Completed final sign-off Mar 2025 | 1025 Fillmore St | Advanced Home Energy Inc. | remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen.Details
remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen. | $3,057,119 |
| Sep 25, 2023 | Completed final sign-off Mar 2025 | 1234 Mcallister St | Advanced Home Energy Inc. | remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen.Details
remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen. | $1,680,248 |
| Sep 25, 2023 | Completed final sign-off Mar 2025 | 1355 Golden Gate Av | Advanced Home Energy Inc. | remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen.Details
remodeling of buildings a, b, and c which includes removing the existing sub panel, installing a new sub panel, and providing a dedicated circuit and receptacle for new microwave in kitchen. | $1,213,513 |
| Aug 18, 2023 | In progress issued May 2026 | 1025 Fillmore St | Battalion One Fire Protection | as-builts for fire alarm replacement & notification upgrade.Details
as-builts for fire alarm replacement & notification upgrade. | |
| Aug 16, 2023 | Completed final sign-off Nov 2023 | 1015 Fillmore St | Winedark Inc | installation of an automatic door opener to comply with mandatory disability access improvement program abe 202308088164Details
installation of an automatic door opener to comply with mandatory disability access improvement program abe 202308088164 | $3,000 |
| Aug 16, 2023 | Completed final sign-off Nov 2023 | 1035 Fillmore St | Winedark Inc | to comply with abe 202308088165. to install automatic door opener.Details
to comply with abe 202308088165. to install automatic door opener. | $3,000 |
| Aug 16, 2023 | Completed final sign-off Nov 2023 | 1045 Fillmore St | Winedark Inc | comply with abe 202308088166. to install automatic door opener.Details
comply with abe 202308088166. to install automatic door opener. | $3,000 |
| Jan 13, 2023 | Never finaled issued Jan 2023, no final | 1355 Golden Gate Av | voluntary elevator modernization at 1025 fillmore buliding, remove sprinklers and all associated piping, etc from mech top of shaft and pit no other work to systemDetails
voluntary elevator modernization at 1025 fillmore buliding, remove sprinklers and all associated piping, etc from mech top of shaft and pit no other work to system | $1,000 | |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 1035 Fillmore St | Progress Builders | ti renovation to e restroom to fully accessible/ all gender restroom, plumbing & electrical upgrade to provide for hair salon, new 3 5/8" metal furring walls within 2' of ceiling braces to adjacent concrete wall- 1hr separation, replacement lighting & thru wall heat pump for heating & cooling.Details
ti renovation to e restroom to fully accessible/ all gender restroom, plumbing & electrical upgrade to provide for hair salon, new 3 5/8" metal furring walls within 2' of ceiling braces to adjacent concrete wall- 1hr separation, replacement lighting & thru wall heat pump for heating & cooling. | $30,000 |
| Nov 29, 2022 | Completed final sign-off Apr 2023 | 1234 Mcallister St | Fidelity Roof Company | reroofingDetails
reroofing | $241,550 |
| Nov 29, 2022 | Completed final sign-off May 2023 | 1025 Fillmore St | Fidelity Roof Company | reroofingDetails
reroofing | $191,989 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 1355 Golden Gate Av | Fidelity Roof Company | reroofing. *cool roof required sri 64Details
reroofing. *cool roof required sri 64 | $149,636 |
| Jun 9, 2022 | Never finaled issued Jan 2023, no final | 1025 Fillmore St | Battalion One Fire Protection | fire alarm voice system, 1 panel, detectors, pull stations, speaker strobes, 4 power supply, 357 field devices.Details
fire alarm voice system, 1 panel, detectors, pull stations, speaker strobes, 4 power supply, 357 field devices. | $169,050 |
| Dec 10, 2020 | Completed final sign-off May 2021 | 1025 Fillmore St | Battalion One Fire Protection | replace outdated evacutation maps with new.Details
replace outdated evacutation maps with new. | |
| Dec 10, 2020 | Never finaled issued Mar 2021, no final | 1234 Mcallister St | Battalion One Fire Protection | replace outadated evacuation maps with newDetails
replace outadated evacuation maps with new | |
| Dec 10, 2020 | Completed final sign-off May 2021 | 1355 Golden Gate Av | Battalion One Fire Protection | replace outdated evacuation maps with new.all floors about 20 evac maps- location in field to be determinded by inspectorDetails
replace outdated evacuation maps with new.all floors about 20 evac maps- location in field to be determinded by inspector | |
| Sep 22, 2020 | Completed final sign-off Dec 2021 | 1025 Fillmore St | Mastec Network Solutions Inc | modification to an unmanned telecommunications facility consisting of: relo 2, install 3 and keep 4 antenna/mounts (9 total) inst 3 new radio 4415, remove 3 tmas, modify frp enclosures, install two new batter cabs, 3 new bb6630 and 1 6648. new breaker, and 3 xx12 hybrid cables.Details
modification to an unmanned telecommunications facility consisting of: relo 2, install 3 and keep 4 antenna/mounts (9 total) inst 3 new radio 4415, remove 3 tmas, modify frp enclosures, install two new batter cabs, 3 new bb6630 and 1 6648. new breaker, and 3 xx12 hybrid cables. | $25,000 |
| Jun 24, 2020 | Never finaled issued Jun 2020, no final | 1355 Golden Gate Av | street space | ||
| May 31, 2019 | Never finaled filed May 2019, never issued | 1025 Fillmore St | t-mobile modification to replace (3) existing antennas with new; install 3 rrusDetails
t-mobile modification to replace (3) existing antennas with new; install 3 rrus | $25,000 | |
| Dec 21, 2017 | Never finaled issued Apr 2018, no final | 1035 Fillmore St | Nassif A Ayyad | 1/f: reconfigure floor plan to . (n) accessible counter.Details
1/f: reconfigure floor plan to . (n) accessible counter. | $10,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2019 | 1025 Fillmore St | Walker Cellular Inc | t-mobile - install 3 8' panel antennas on new masts; install 3 frp boxes; install 3 rrus. t-mobileDetails
t-mobile - install 3 8' panel antennas on new masts; install 3 frp boxes; install 3 rrus. t-mobile | $20,000 |
| May 10, 2017 | Expired or cancelled expired Jul 2018 | 1025 Fillmore St | Electric Tech Construction Inc | modification of existing wireless telecommunications facility for t mobile consisting of 1 new microwave dish, 2 new radiosDetails
modification of existing wireless telecommunications facility for t mobile consisting of 1 new microwave dish, 2 new radios | $15,000 |
| Oct 15, 2009 | Expired or cancelled cancelled Jan 2026 | 1025 Fillmore St | install food service equiptment for restaurant. change of use from "m"(retail) to "b"(cafe). mechanical work performed under separate permit.Details
install food service equiptment for restaurant. change of use from "m"(retail) to "b"(cafe). mechanical work performed under separate permit. | $35,000 | |
| Aug 17, 2005 | Expired or cancelled cancelled Aug 2016 | 1025 Fillmore St | install& operation of antennas&associated equip for pacbell wireless communications inc.(t-mobile) a total of 3 antennas, 1 per sector to replace existing antennas.install bts cabinet on exist platform next to equipment.Details
install& operation of antennas&associated equip for pacbell wireless communications inc.(t-mobile) a total of 3 antennas, 1 per sector to replace existing antennas.install bts cabinet on exist platform next to equipment. | $20,000 | |
| Nov 2, 2004 | Expired or cancelled expired Sep 2005 | 1355 Golden Gate Av | Afe Fire Protection | install pyro-chem 3 gallon fire suppression system in hood.Details
install pyro-chem 3 gallon fire suppression system in hood. | $2,800 |
| Jun 30, 2004 | Completed final sign-off Jan 2005 | 1355 Golden Gate Av | West And East Bay Cosntruction, Inc | 1/f toilet room renovation for barrier reduction in public toilets includes fixture replacement &Details
1/f toilet room renovation for barrier reduction in public toilets includes fixture replacement & | $12,000 |
| Jun 30, 2004 | Completed final sign-off Jan 2005 | 1234 Mcallister St | West And East Bay Cosntruction, Inc | 1/f toilet room renovation for barrier reduction in public toilets includes fixture replacement &Details
1/f toilet room renovation for barrier reduction in public toilets includes fixture replacement & | $12,000 |
| Jun 2, 2003 | Expired or cancelled expired Apr 2018 | 1025 Fillmore St | elevator retrofit-adding elevator recall feature & related smoke deteators to exist fire alarm panelDetails
elevator retrofit-adding elevator recall feature & related smoke deteators to exist fire alarm panel | $9,320 | |
| Nov 13, 2002 | Expired or cancelled expired Apr 2018 | 1025 Fillmore St | West And East Bay Cosntruction, Inc | making 2 restrooms ada compliant . they currently are not.Details
making 2 restrooms ada compliant . they currently are not. | $14,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Battalion One Fire Protection (7), Advanced Home Energy Inc. (4), Fidelity Roof Company (3), West And East Bay Cosntruction, Inc (3), Winedark Inc (3), Afe Fire Protection, Electric Tech Construction Inc, Lynn Safety Inc., Mastec Network Solutions Inc, Nassif A Ayyad, Progress Builders, Sf Glass & Mirror Inc, Walker Cellular Inc
- Architects
- Courtney Miller
- Engineers
- Abdelkader Khelifa, Stanley Coventry, Wissam Zalzali
- Designers
- Mike Herbert (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.