Abdelkader Khelifa
- Listed as
- architect, engineer
- Based in
- Sf
- On San Francisco permits
- Jan 2021 to Feb 2025
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 5 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2025 | In progress filed Feb 2025, not yet issued | 246 02nd St | reconfigure floor plan for (n) deli and coffee station (n) 3 cop sink, (n) hand sink, map sink and food prep sink, (n) accesible counter no exterior changesDetails
reconfigure floor plan for (n) deli and coffee station (n) 3 cop sink, (n) hand sink, map sink and food prep sink, (n) accesible counter no exterior changes | $40,000 | |
| Jun 28, 2024 | In progress issued Nov 2024 | 2056 Bush St | Camacho S Concrete Flatwork | new retaining wall at rearDetails
new retaining wall at rear | $40,000 |
| Dec 14, 2023 | Completed final sign-off Jul 2024 | 1249 Masonic Av | Nassif A Ayyad | 2/f: install new bathroom @ 1249 masonic. (2nd floor)Details
2/f: install new bathroom @ 1249 masonic. (2nd floor) | $20,000 |
| Oct 11, 2022 | Never finaled issued Nov 2022, no final | 324 10th Av | Building Sensibly, Bd Home Group Inc | comply with nov 202287517. replace wall from fire damage. demo ground slab &excavate- increase ceilng ht. demo interior walls at 2nd fl. reinforce cement (e) rear deck. replace front windows in kind. replace (e) rear deck & stairs. new ret wall & conc stairs @ yard. reroofing under separate permit.Details
comply with nov 202287517. replace wall from fire damage. demo ground slab &excavate- increase ceilng ht. demo interior walls at 2nd fl. reinforce cement (e) rear deck. replace front windows in kind. replace (e) rear deck & stairs. new ret wall & conc stairs @ yard. reroofing under separate permit. | $115,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 2332 Divisadero St | Home Run Inc | reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen.Details
reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen. | $25,000 |
| Dec 30, 2021 | Completed final sign-off May 2022 | 2708 Greenwich St | reinstall master bathroom in 3rd fl fixture in-kind. remodel due to water damage. replace drywall in master bathroom, living room due to water damage.Details
reinstall master bathroom in 3rd fl fixture in-kind. remodel due to water damage. replace drywall in master bathroom, living room due to water damage. | $50,000 | |
| Sep 21, 2021 | Completed final sign-off Apr 2022 | 4092 18th St | Admiral Builders Inc | reconfigure floor plan. (n) ada accessible counter for pick up onlyDetails
reconfigure floor plan. (n) ada accessible counter for pick up only | $7,000 |
| Jan 25, 2021 | Completed final sign-off Aug 2021 | 302 Valencia St | Nassif A Ayyad | reconfigure floor plan for (n) retail coffee shop. upgrade ada.Details
reconfigure floor plan for (n) retail coffee shop. upgrade ada. | $40,000 |