Home Run Inc
- Based in
- Fremont
- On San Francisco permits
- Jun 2022 to Aug 2026
- Last 24 months
- 17 permits filed
25 permits since 2000: 17 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1001 Pine St | unit# 610: remove & replace (e) cabinetry on both sides of a wall separating the den & dining room areas. non-structural, refer to pa 85-12848 for plan info.Details
unit# 610: remove & replace (e) cabinetry on both sides of a wall separating the den & dining room areas. non-structural, refer to pa 85-12848 for plan info. | $17,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 4359 18th St | install ada automatic door opener (work do not affect public row)Details
install ada automatic door opener (work do not affect public row) | $10,000 |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 712 Bryant St | unit 4: extend ponywall upwards to close of hole, and install new door in unit.Details
unit 4: extend ponywall upwards to close of hole, and install new door in unit. | $2,750 |
| May 11, 2026 | In progress issued May 2026 | 737 Moultrie St | replace windows with new windows same size and location, 2 visible from street. repair any drywall damaged during window removal and minor water damage drywall. window max u-factor = 0.27Details
replace windows with new windows same size and location, 2 visible from street. repair any drywall damaged during window removal and minor water damage drywall. window max u-factor = 0.27 | $25,000 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 419 Castro St | revision to original layout counter, ref. permit 202602236320 - (no seating area, no consumption indoor/outdoor)Details
revision to original layout counter, ref. permit 202602236320 - (no seating area, no consumption indoor/outdoor) | |
| Apr 10, 2026 | Completed final sign-off Sep 2026 | 4359 18th St | turning vacant commercial space into nail salon, new plumbing and electrical, minor framing. adding ada bath.Details
turning vacant commercial space into nail salon, new plumbing and electrical, minor framing. adding ada bath. | $50,000 |
| Apr 10, 2026 | Completed final sign-off Jul 2026 | 436 Marietta Dr | remodel master bathroom/closet . (n) electrical and plumbing. repair dry-rot on rear wall. replace windows in master bathroomDetails
remodel master bathroom/closet . (n) electrical and plumbing. repair dry-rot on rear wall. replace windows in master bathroom | $55,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 415 Castro St | remove damaged sub-floor and replace, bring framing upto code by adding additional framing(not removing old framing. revision to pa 202511149694Details
remove damaged sub-floor and replace, bring framing upto code by adding additional framing(not removing old framing. revision to pa 202511149694 | $2,500 |
| Feb 23, 2026 | Completed final sign-off Jun 2026 | 419 Castro St | (n) plumbing, drainage, electrical, ventilation; bathr remodel in-kind; change of use (retail to coffee shop); add in required had, 3 compartment & mop sinks, new front door, new flooring, wall tiling, cove base; new led lighting throughoutDetails
(n) plumbing, drainage, electrical, ventilation; bathr remodel in-kind; change of use (retail to coffee shop); add in required had, 3 compartment & mop sinks, new front door, new flooring, wall tiling, cove base; new led lighting throughout | $50,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 415 Castro St | change of use from retail to salon. plumbing line, drainage etc for washing machine, hair wash sink, updated electrical outlets, lighting; widen bathroom doorway remodel in kind.Details
change of use from retail to salon. plumbing line, drainage etc for washing machine, hair wash sink, updated electrical outlets, lighting; widen bathroom doorway remodel in kind. | $150,000 |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 1700 Gough St | bathroom and kitchen remodel in kind.Details
bathroom and kitchen remodel in kind. | $25,000 |
| May 29, 2025 | Completed final sign-off Apr 2026 | 2730 23rd St | replace and repair damaged siding on historical building (replace with in kind siding) (street visible).Details
replace and repair damaged siding on historical building (replace with in kind siding) (street visible). | $20,000 |
| Apr 28, 2025 | Completed final sign-off Dec 2025 | 1040 Bush St | partial demo & replace in kind ceiling, wall, floor finishes, toilet partitions, plumbing fixtures, install ada compliant grab bars & lighting in each of the (e) restrooms (level 1,2,3) no residential guest rooms are being removed.Details
partial demo & replace in kind ceiling, wall, floor finishes, toilet partitions, plumbing fixtures, install ada compliant grab bars & lighting in each of the (e) restrooms (level 1,2,3) no residential guest rooms are being removed. | $95,000 |
| Feb 7, 2025 | Completed final sign-off May 2025 | 356 17th Av | revision to pa # 202410314167: enlarge 3/f bedroom 3 closet. all interior work.Details
revision to pa # 202410314167: enlarge 3/f bedroom 3 closet. all interior work. | |
| Jan 31, 2025 | Completed final sign-off Mar 2025 | 469 Clementina St | like for like bathroom remodeling.Details
like for like bathroom remodeling. | $17,500 |
| Oct 31, 2024 | Completed final sign-off May 2025 | 356 17th Av | remodel existing 3rd floor bedroom. remove bedroom wall to combine bedroom 3 and office. all interior work.Details
remodel existing 3rd floor bedroom. remove bedroom wall to combine bedroom 3 and office. all interior work. | $6,000 |
| Oct 17, 2024 | Completed final sign-off Feb 2025 | 233 San Jose Av | removing the tile in two existing bathrrooms and replace it with new tile and upgrading the toilet, vanity and faucets. like for like remodeling, no change in plumbing fixture count, no wall demolition nor construction.Details
removing the tile in two existing bathrrooms and replace it with new tile and upgrading the toilet, vanity and faucets. like for like remodeling, no change in plumbing fixture count, no wall demolition nor construction. | $16,000 |
| Jul 16, 2024 | In progress issued Jul 2024 | 92 Keystone Wy | *removing dry rotted mudcell w/ new pressure treated one including install 5/8" all threadsand epoxy inside the concrete. * change existing abs pipes in the bathroom to cast iron pipes.Details
*removing dry rotted mudcell w/ new pressure treated one including install 5/8" all threadsand epoxy inside the concrete. * change existing abs pipes in the bathroom to cast iron pipes. | $1,500 |
| May 9, 2024 | Expired or cancelled expired Sep 2026 | 2730 23rd St | revision to approved pa# 202302172173. replace (e) rear and side foundation per plan. new foundation at (e0 front opening per plan.Details
revision to approved pa# 202302172173. replace (e) rear and side foundation per plan. new foundation at (e0 front opening per plan. | $15,000 |
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 880 14th St | replace 12 windows, not visible from street u=0.3Details
replace 12 windows, not visible from street u=0.3 | $3,200 |
| Nov 6, 2023 | Expired or cancelled withdrawn Mar 2025 | 133 Palm Av | build new deck 11'1/2 includes railing to match (e) neighbors railing, new jack door in swing, exterior power outletDetails
build new deck 11'1/2 includes railing to match (e) neighbors railing, new jack door in swing, exterior power outlet | $16,500 |
| Sep 26, 2023 | Never finaled issued Sep 2023, no final | 1566 Sanchez St | fixing the 1st flight and landing for the front stairs and replacing the steps tread - wood to wood. repair in kind; less than 50%.Details
fixing the 1st flight and landing for the front stairs and replacing the steps tread - wood to wood. repair in kind; less than 50%. | $34,000 |
| May 11, 2023 | Completed final sign-off Jul 2024 | 45 Eagle St | replace front entry stair and handrails to comply with nov 202200722Details
replace front entry stair and handrails to comply with nov 202200722 | $5,000 |
| Feb 17, 2023 | Completed final sign-off Aug 2026 | 2730 23rd St | add (3) new adu per plannning code section 207(c)(4). 1st fl: add (3) new units include bedrooms, bathrooms, living and kitchen. retrofit seismic work under pa#202211146459Details
add (3) new adu per plannning code section 207(c)(4). 1st fl: add (3) new units include bedrooms, bathrooms, living and kitchen. retrofit seismic work under pa#202211146459 | $155,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 2332 Divisadero St | reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen.Details
reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen. | $25,000 |