Back to bathroom remodel contractors
Home Run Inc
- Based in
- Fremont
- On San Francisco permits
- Jun 2022 to Aug 2026
- Last 24 months
- 17 permits filed
25 permits since 2000: 17 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 18 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2026 | Completed final sign-off Jul 2026 | 436 Marietta Dr | remodel master bathroom/closet . (n) electrical and plumbing. repair dry-rot on rear wall. replace windows in master bathroomDetails
remodel master bathroom/closet . (n) electrical and plumbing. repair dry-rot on rear wall. replace windows in master bathroom | $55,000 |
| Apr 10, 2026 | Completed final sign-off Sep 2026 | 4359 18th St | turning vacant commercial space into nail salon, new plumbing and electrical, minor framing. adding ada bath.Details
turning vacant commercial space into nail salon, new plumbing and electrical, minor framing. adding ada bath. | $50,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 415 Castro St | change of use from retail to salon. plumbing line, drainage etc for washing machine, hair wash sink, updated electrical outlets, lighting; widen bathroom doorway remodel in kind.Details
change of use from retail to salon. plumbing line, drainage etc for washing machine, hair wash sink, updated electrical outlets, lighting; widen bathroom doorway remodel in kind. | $150,000 |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 1700 Gough St | bathroom and kitchen remodel in kind.Details
bathroom and kitchen remodel in kind. | $25,000 |
| Jan 31, 2025 | Completed final sign-off Mar 2025 | 469 Clementina St | like for like bathroom remodeling.Details
like for like bathroom remodeling. | $17,500 |
| Jul 16, 2024 | In progress issued Jul 2024 | 92 Keystone Wy | *removing dry rotted mudcell w/ new pressure treated one including install 5/8" all threadsand epoxy inside the concrete. * change existing abs pipes in the bathroom to cast iron pipes.Details
*removing dry rotted mudcell w/ new pressure treated one including install 5/8" all threadsand epoxy inside the concrete. * change existing abs pipes in the bathroom to cast iron pipes. | $1,500 |
| Feb 17, 2023 | Completed final sign-off Aug 2026 | 2730 23rd St | add (3) new adu per plannning code section 207(c)(4). 1st fl: add (3) new units include bedrooms, bathrooms, living and kitchen. retrofit seismic work under pa#202211146459Details
add (3) new adu per plannning code section 207(c)(4). 1st fl: add (3) new units include bedrooms, bathrooms, living and kitchen. retrofit seismic work under pa#202211146459 | $155,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 2332 Divisadero St | reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen.Details
reconfigure floor plan in unit #4. demo non-loading wall. remodel extg bathroom and remodel kitchen. | $25,000 |