Permit GraphShortlistSan Francisco building permits since 2000

Block 3582, lot 057

4092 18th St

City’s use
Commercial Misc
Built
1905
Stories
4
Units
25
Rooms
25 bathrooms
Lot
7,248 sq ft
Zoning
CASTRO
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

46 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 18, 2026In progress
filed Sep 2026, not yet issued
4092 18th Stinstall new modular bar, new customer seating, new sinks, w/d dookups, d/w hookup, replace incandes, w/l.e.d lighting, new ada ramp(12.5" floor ht difference), remove one entry door, replace windows in kind.
Details
Permit
202609188357

install new modular bar, new customer seating, new sinks, w/d dookups, d/w hookup, replace incandes, w/l.e.d lighting, new ada ramp(12.5" floor ht difference), remove one entry door, replace windows in kind.

Open the permit page

$76,420
Sep 21, 2021Completed
final sign-off Apr 2022
4092 18th StAdmiral Builders Increconfigure floor plan. (n) ada accessible counter for pick up only
Details
Permit
202109218875
Permit issued
Oct 29, 2021
Final sign-off
Apr 4, 2022

reconfigure floor plan. (n) ada accessible counter for pick up only

Open the permit page

$7,000
Sep 3, 2020Expired or cancelled
cancelled Jan 2026
4092 18th Stchange of use. no construction work under this permit. for planning department documentation only. conditional use authorization only.
Details
Permit
202009033445

change of use. no construction work under this permit. for planning department documentation only. conditional use authorization only.

Open the permit page

Apr 1, 2019Never finaled
issued Apr 2019, no final
4092 18th StAura Fire Safety Incansul system update. ref 201810244060
Details
Permit
201904016740
Permit issued
Apr 1, 2019

ansul system update. ref 201810244060

Open the permit page

$6,800
Oct 24, 2018Completed
final sign-off Apr 2019
4092 18th StNassif A Ayyadreconfigiure floor plan, (n) hood i (4'x12') (n) quarry tile fl. with quarry tile cove (work area) (n) ansual fire suppression system under seperate permite
Details
Permit
201810244060
Permit issued
Dec 13, 2018
Final sign-off
Apr 25, 2019

reconfigiure floor plan, (n) hood i (4'x12') (n) quarry tile fl. with quarry tile cove (work area) (n) ansual fire suppression system under seperate permite

Open the permit page

$20,000
May 21, 2018Completed
final sign-off Jun 2019
4094 18th StStandardconstr/Standardroofreroofing no propane torch on roof
Details
Permit
201805219656
Permit issued
Apr 24, 2019
Final sign-off
Jun 13, 2019

reroofing no propane torch on roof

Open the permit page

$60,000
Sep 11, 2017Never finaled
issued Sep 2017, no final
4096 18th Ststreet space
Details
Permit
M830107
Permit issued
Sep 11, 2017

street space

Open the permit page

Jul 31, 2017Completed
final sign-off Sep 2017
4096 18th StWesco Constructionto comply with complaint # 201788671, r&r fire damaged, framing, siding, trim window tram & sash on hte exterior & replace fire damaged flooring,electrical wiring,walls & ceilings,in 2 units #25 & 35 .
Details
Permit
201707313429
Permit issued
Aug 1, 2017
Final sign-off
Sep 28, 2017

to comply with complaint # 201788671, r&r fire damaged, framing, siding, trim window tram & sash on hte exterior & replace fire damaged flooring,electrical wiring,walls & ceilings,in 2 units #25 & 35 .

Open the permit page

$30,000
Sep 6, 2016Completed
final sign-off Sep 2016
4092 18th Stto obtain final inspection for work approved under pa # 201309066130. all work is complete. n/a maher ord. 155-13
Details
Permit
201609066830
Permit issued
Sep 6, 2016
Final sign-off
Sep 20, 2016

to obtain final inspection for work approved under pa # 201309066130. all work is complete. n/a maher ord. 155-13

Open the permit page

May 8, 2015Never finaled
issued May 2015, no final
4096 18th Ststreet space
Details
Permit
M585107
Permit issued
May 8, 2015

street space

Open the permit page

Apr 23, 2015Never finaled
issued Apr 2015, no final
4096 18th Ststreet space
Details
Permit
M580207
Permit issued
Apr 23, 2015

street space

Open the permit page

Dec 3, 2014Completed
final sign-off Apr 2015
4092 18th StDragon Werks Inccommercial tenant improvement, new yogurt shop in place of former juice shop; maher n/a
Details
Permit
201412032968
Permit issued
Dec 19, 2014
Final sign-off
Apr 7, 2015

commercial tenant improvement, new yogurt shop in place of former juice shop; maher n/a

Open the permit page

$10,000
Aug 27, 2014Never finaled
issued Aug 2014, no final
4096 18th StA B C Window Contractorsunit 4 & 33 - install 5 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 1029 for rescue. all windows will be double pane and have a u-factor of .30. maher na
Details
Permit
201408274825
Permit issued
Aug 27, 2014

unit 4 & 33 - install 5 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section 1029 for rescue. all windows will be double pane and have a u-factor of .30. maher na

Open the permit page

$2,495
Sep 6, 2013Completed
final sign-off Mar 2018
4092 18th Stsoft story retrofit per sfbc chapter 34b fema p-807. seismic upgrade to comply w/soft story ordinance , (n) mement frame. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201309066130
Permit issued
Jun 13, 2014
Final sign-off
Mar 6, 2018

soft story retrofit per sfbc chapter 34b fema p-807. seismic upgrade to comply w/soft story ordinance , (n) mement frame. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$20,000
Jan 22, 2013Never finaled
issued Jan 2013, no final
4094 18th Ststreet space
Details
Permit
M367587
Permit issued
Jan 22, 2013

street space

Open the permit page

Jan 4, 2013Completed
final sign-off Feb 2013
4094 18th StWells Construction Increvision to pa# 2012-1102-3405-relocaye power door operator, install new 6x36 bollard door actuator at store entry adjacent to level landing behind property line.
Details
Permit
201301047247
Permit issued
Jan 4, 2013
Final sign-off
Feb 21, 2013

revision to pa# 2012-1102-3405-relocaye power door operator, install new 6x36 bollard door actuator at store entry adjacent to level landing behind property line.

Open the permit page

Nov 2, 2012Completed
final sign-off Feb 2013
4094 18th StWells Construction Increvision to app#201207034029. install new 6"x36" door activator at entry door.
Details
Permit
201211023405
Permit issued
Nov 7, 2012
Final sign-off
Feb 21, 2013

revision to app#201207034029. install new 6"x36" door activator at entry door.

Open the permit page

$7,500
Oct 11, 2012Completed
final sign-off Oct 2012
499 Castro StInternational Fire Equipas-built: revisions to pa#2012-09-26-0707. upgrade 1.5 gal cylinder to 3 gal. and use 19 flow points. add 3 nozzles and relocate coocking equipment and nozzles.
Details
Permit
201210111840
Permit issued
Oct 11, 2012
Final sign-off
Oct 16, 2012

as-built: revisions to pa#2012-09-26-0707. upgrade 1.5 gal cylinder to 3 gal. and use 19 flow points. add 3 nozzles and relocate coocking equipment and nozzles.

Open the permit page

Sep 26, 2012Completed
final sign-off Oct 2012
499 Castro StInternational Fire Equipinstall ul300 fire system into kitchen hood
Details
Permit
201209260707
Permit issued
Sep 26, 2012
Final sign-off
Oct 16, 2012

install ul300 fire system into kitchen hood

Open the permit page

$1,000
Sep 6, 2012Completed
final sign-off Nov 2012
4094 18th StInstant Neoninstall (1) non illuminated walls sign for "starbucks" (non-electric single faced wall sign)
Details
Permit
201209069055
Permit issued
Sep 6, 2012
Final sign-off
Nov 30, 2012

install (1) non illuminated walls sign for "starbucks" (non-electric single faced wall sign)

Open the permit page

$1,000
Sep 6, 2012Completed
final sign-off Nov 2012
4094 18th StInstant Neoninstall 1 directly illumnated window sign on building interior for "starbucks" (electric double faced sign)
Details
Permit
201209069056
Permit issued
Sep 6, 2012
Final sign-off
Nov 30, 2012

install 1 directly illumnated window sign on building interior for "starbucks" (electric double faced sign)

Open the permit page

$1,000
Aug 30, 2012Completed
final sign-off Feb 2013
4094 18th StWells Construction Increvision to app#201207034029. alteration to mep layout and system. provide fire seperation for tenant spaces. new colums - structural under seperate permit.
Details
Permit
201208308684
Permit issued
Aug 31, 2012
Final sign-off
Feb 21, 2013

revision to app#201207034029. alteration to mep layout and system. provide fire seperation for tenant spaces. new colums - structural under seperate permit.

Open the permit page

$25,000
Aug 21, 2012Completed
final sign-off Feb 2013
4094 18th StWells Construction Increvision to 201207034029. changes to structural system, detailing of connections at slab
Details
Permit
201208217887
Permit issued
Aug 31, 2012
Final sign-off
Feb 21, 2013

revision to 201207034029. changes to structural system, detailing of connections at slab

Open the permit page

Aug 9, 2012Completed
final sign-off Aug 2012
4094 18th StWells Construction Incinterior non structural demo of e coffee shop. all work to comply with sfbc ab017. no exterior work.
Details
Permit
201208096992
Permit issued
Aug 10, 2012
Final sign-off
Aug 24, 2012

interior non structural demo of e coffee shop. all work to comply with sfbc ab017. no exterior work.

Open the permit page

$15,000
Jul 3, 2012Completed
final sign-off Feb 2013
4094 18th StWells Construction Incti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes
Details
Permit
201207034029
Permit issued
Aug 13, 2012
Final sign-off
Feb 21, 2013

ti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes

Open the permit page

$600,000
Jun 20, 2012Completed
final sign-off Apr 2013
499 Castro Stadd class 1 hood & cooking equipment to former soup/salad restaurant. new tenant-add small partition walls (2), demo front counter area. new opening in interior kitchen wall. replace front tiles (a lot missing).
Details
Permit
201206203015
Permit issued
Aug 22, 2012
Final sign-off
Apr 9, 2013

add class 1 hood & cooking equipment to former soup/salad restaurant. new tenant-add small partition walls (2), demo front counter area. new opening in interior kitchen wall. replace front tiles (a lot missing).

Open the permit page

$50,000
Feb 10, 2011Never finaled
issued Feb 2011, no final
499 Castro Ststreet space and mta parking
Details
Permit
M240926
Permit issued
Feb 10, 2011

street space and mta parking

Open the permit page

Nov 30, 2010Expired or cancelled
expired Jan 2016
4096 18th StA B C Window Contractorsinstall 4 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of .30.
Details
Permit
201011305838
Permit issued
Nov 30, 2010

install 4 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc1026 for rescue. all windows will be double pane and have a u-factor of .30.

Open the permit page

$2,000
Nov 23, 2010Completed
final sign-off Oct 2011
499 Castro StNelson Jameson Construction Incconverting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing.
Details
Permit
201011235563
Permit issued
Mar 29, 2011
Final sign-off
Oct 13, 2011

converting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing.

Open the permit page

$45,000
Feb 10, 2010Completed
final sign-off Mar 2010
499 Castro Strevision to 201001215113 for structural revision at interior moment frame
Details
Permit
201002106320
Permit issued
Feb 10, 2010
Final sign-off
Mar 26, 2010

revision to 201001215113 for structural revision at interior moment frame

Open the permit page

Jan 21, 2010Completed
final sign-off Mar 2010
499 Castro St(n) moment and footing @ front of building. all work interior on vacant space.
Details
Permit
201001215113
Permit issued
Jan 22, 2010
Final sign-off
Mar 26, 2010

(n) moment and footing @ front of building. all work interior on vacant space.

Open the permit page

$20,000
Mar 17, 2009Never finaled
issued Mar 2009, no final
4094 18th Ststreet space only.
Details
Permit
M156186
Permit issued
Mar 17, 2009

street space only.

Open the permit page

Nov 13, 2008Completed
final sign-off Dec 2008
499 Castro Strevision to pa #200809111288, to deleted bank teller machine from scope of work.
Details
Permit
200811136504
Permit issued
Nov 17, 2008
Final sign-off
Dec 5, 2008

revision to pa #200809111288, to deleted bank teller machine from scope of work.

Open the permit page

Oct 14, 2008Completed
final sign-off Dec 2008
499 Castro StBcci Construction Companydemo of (e) carpet, (e) retial fixtures, (e) service sink, (e) acoustick ceiling, tile w/metal t-grid to remain; non-structural partitions & demo & removal of (e) light fixtures under ab-017.
Details
Permit
200810144148
Permit issued
Oct 14, 2008
Final sign-off
Dec 5, 2008

demo of (e) carpet, (e) retial fixtures, (e) service sink, (e) acoustick ceiling, tile w/metal t-grid to remain; non-structural partitions & demo & removal of (e) light fixtures under ab-017.

Open the permit page

$5,888
Sep 11, 2008Completed
final sign-off Dec 2008
499 Castro Stdemo extg retail fixtures, extg finishes extg selected non struc partitions to accomadate new retail &inform'l area for historical society abd sf tourism inform'n area. demo extg nonstruc alum. store frt sys to accom 2 new public access atm bank mach. mep under sep permit.
Details
Permit
200809111288
Permit issued
Oct 23, 2008
Final sign-off
Dec 5, 2008

demo extg retail fixtures, extg finishes extg selected non struc partitions to accomadate new retail &inform'l area for historical society abd sf tourism inform'n area. demo extg nonstruc alum. store frt sys to accom 2 new public access atm bank mach. mep under sep permit.

Open the permit page

$86,500
Jul 3, 2008Completed
final sign-off Nov 2008
4092 18th St(e) vacant tenant space to be remodeled into a juice bar limited to 15 seats (e) mechanical & (e) lighting to remain-modify ceiling above service area
Details
Permit
200807035932
Permit issued
Jul 3, 2008
Final sign-off
Nov 25, 2008

(e) vacant tenant space to be remodeled into a juice bar limited to 15 seats (e) mechanical & (e) lighting to remain-modify ceiling above service area

Open the permit page

$20,000
Apr 17, 2008Never finaled
issued Apr 2008, no final
4096 18th StA B C Window Contractorsunit 23 - insatll vinyl windows in kind into existing frames. no chg in size or loc. windows do not face the street. if appl, bedroom windows will comply w/sec 310.4 for rescue, double pane &have a u-factor of .30.
Details
Permit
200804179930
Permit issued
Apr 17, 2008

unit 23 - insatll vinyl windows in kind into existing frames. no chg in size or loc. windows do not face the street. if appl, bedroom windows will comply w/sec 310.4 for rescue, double pane &have a u-factor of .30.

Open the permit page

$1,319
Feb 8, 2008Expired or cancelled
expired Jan 2010
4094 18th StAcco Engineered Systems Inc. Dba Acco Enon 1st floor & roof top: provide 2 new split systems units - mechanical system with the condensing vent on rooftop & the fan coil on 1st floor providing cooling, units weight are les than 400 lbs.
Details
Permit
200802084326
Permit issued
Mar 18, 2008

on 1st floor & roof top: provide 2 new split systems units - mechanical system with the condensing vent on rooftop & the fan coil on 1st floor providing cooling, units weight are les than 400 lbs.

Open the permit page

$52,275
Jul 13, 2007Never finaled
issued Jul 2007, no final
4092 18th Stsidewalk permit only.
Details
Permit
M77224
Permit issued
Jul 13, 2007

sidewalk permit only.

Open the permit page

Aug 4, 2004Never finaled
issued Aug 2004, no final
4096 18th StA B C Window Contractorsinstall 3 vinyl windows in kind into (e)frames.no change in size/location.window do not face street
Details
Permit
200408040611
Permit issued
Aug 4, 2004

install 3 vinyl windows in kind into (e)frames.no change in size/location.window do not face street

Open the permit page

$1,226
Jun 4, 2004Completed
final sign-off Jun 2004
495 Castro Strelocated existing counters equipment and furniture add 3 compartment sink and hand sink to comply
Details
Permit
200406045546
Permit issued
Jun 4, 2004
Final sign-off
Jun 29, 2004

relocated existing counters equipment and furniture add 3 compartment sink and hand sink to comply

Open the permit page

$16,000
May 26, 2004Never finaled
issued May 2004, no final
495 Castro StSteve's Awninginstall new awning. awning made of tubing fram 1" and 3/4". cover with vinyl sheet awning long 20'3"
Details
Permit
200405264919
Permit issued
May 26, 2004

install new awning. awning made of tubing fram 1" and 3/4". cover with vinyl sheet awning long 20'3"

Open the permit page

$1,150
May 21, 2003Completed
final sign-off Dec 2003
495 Castro StCal Neon Signssign permit
Details
Permit
200305215236
Permit issued
May 21, 2003
Final sign-off
Dec 4, 2003

sign permit

Open the permit page

May 15, 2003Completed
final sign-off Jun 2003
495 Castro Stinstallation of bagel machine and rearrange counters for coffee and oven
Details
Permit
200305154749
Permit issued
May 15, 2003
Final sign-off
Jun 9, 2003

installation of bagel machine and rearrange counters for coffee and oven

Open the permit page

$10,000
Nov 8, 2001Completed
final sign-off Nov 2001
495 Castro Strevise 2001/01/24/0507. additional plans sumit toshow complete exist & proposed floor plans.......
Details
Permit
200111082765
Permit issued
Nov 8, 2001
Final sign-off
Nov 13, 2001

revise 2001/01/24/0507. additional plans sumit toshow complete exist & proposed floor plans.......

Open the permit page

$100
Oct 17, 2001Completed
final sign-off Nov 2001
495 Castro Strenew app#200101240507 for final
Details
Permit
200110171014
Permit issued
Oct 17, 2001
Final sign-off
Nov 13, 2001

renew app#200101240507 for final

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Wells Construction Inc (6), A B C Window Contractors (4), Instant Neon (2), International Fire Equip (2), Acco Engineered Systems Inc. Dba Acco En, Admiral Builders Inc, Aura Fire Safety Inc, Bcci Construction Company, Cal Neon Signs, Dragon Werks Inc, Nassif A Ayyad, Nelson Jameson Construction Inc, Standardconstr/Standardroof, Steve's Awning, Wesco Construction
Architects
Gensler (2), Addelkader K Helifa, Barry Bourbon, Chris Mcmahon, Maxwell Beaumont, Serina Calhoun, Suheil Shatara
Engineers
Abdelkader Khelifa, Mark Burnett, Rodrigo Santos

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.