Nortrek Solutions
- Based in
- Napa
- On San Francisco permits
- Apr 2022 to Aug 2025
- Last 24 months
- 4 permits filed
8 permits since 2000: 5 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2025 | Completed final sign-off Sep 2025 | 346 01st St | powder room remodel like for likeDetails
powder room remodel like for like | $4,000 |
| Jun 26, 2025 | Completed final sign-off Sep 2025 | 346 01st St | unit 304: kitchen remodel. like for like. relocate kitchen sink.Details
unit 304: kitchen remodel. like for like. relocate kitchen sink. | $9,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2025 | 346 01st St | unit #304: bathroom remodel like for like-convert tub to walking shower.Details
unit #304: bathroom remodel like for like-convert tub to walking shower. | $9,000 |
| Dec 24, 2024 | In progress issued Jun 2026 | 231 Olive St | add (2) bedrooms & (1) bathroom @ basement. remodel kitchen @ entry level. relocate stair @ entry level. add (n) bathroom @ 2nd floor.Details
add (2) bedrooms & (1) bathroom @ basement. remodel kitchen @ entry level. relocate stair @ entry level. add (n) bathroom @ 2nd floor. | $40,000 |
| Sep 7, 2023 | Never finaled issued Sep 2023, no final | 1200 California St | unit 23b: paint and door trim. electrical like to like new receptacles. plumbing new faucet.Details
unit 23b: paint and door trim. electrical like to like new receptacles. plumbing new faucet. | $8,000 |
| Sep 7, 2023 | Completed final sign-off Dec 2023 | 541 Divisadero St | in-kind siding replacement in back of the house.Details
in-kind siding replacement in back of the house. | $12,000 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 541 Divisadero St | remove existing worn out deck replace with new lumber same size and length. everything identical, in-kind. no changesDetails
remove existing worn out deck replace with new lumber same size and length. everything identical, in-kind. no changes | $10,000 |
| Apr 5, 2022 | In progress issued May 2024 | 45 Montcalm St | new curbcut at sidewalk. new driveway ramp with planter area for off street parking. add 9'(w) x6'(h) wood gate at driveway. new soldier pile & concrete retaining wall.Details
new curbcut at sidewalk. new driveway ramp with planter area for off street parking. add 9'(w) x6'(h) wood gate at driveway. new soldier pile & concrete retaining wall. | $28,000 |