Andrew Moore Consulting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Sep 2020
- Last 24 months
- 0 permits filed
120 permits since 2000: 87 completed, 20 never finaled, 13 expired or cancelled.
Of the 20 never-finaled permits, 7 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 120.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 1230 11th Av | to obtain final inspection for work approved under permit application #20070621753Details
to obtain final inspection for work approved under permit application #20070621753 | |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 3027 Sacramento St | remodel hall bath - new tub, vanity, tile. no structural changes. fixture swap out in powder room w/ new toilet, sink. no structural changes.Details
remodel hall bath - new tub, vanity, tile. no structural changes. fixture swap out in powder room w/ new toilet, sink. no structural changes. | $20,000 |
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 880 14th St | common area replace 12 aluminum double hung windows with marvin aluminum clad double hung windows. same size & locationDetails
common area replace 12 aluminum double hung windows with marvin aluminum clad double hung windows. same size & location | $15,000 |
| Feb 24, 2020 | Completed final sign-off Jul 2020 | 880 14th St | common area replace shingle siding inkind common area replace 12 aluminum double hung windows with marvin aluminum clad double hung windows. same size & location (added by e.o on 2/24/2020)Details
common area replace shingle siding inkind common area replace 12 aluminum double hung windows with marvin aluminum clad double hung windows. same size & location (added by e.o on 2/24/2020) | $7,500 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 454 15th Av | add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high effDetails
add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high eff | $45,000 |
| Jun 26, 2019 | Expired or cancelled cancelled Jan 2026 | 815 Rhode Island St | build new retaining wall in basementDetails
build new retaining wall in basement | $20,000 |
| Jan 8, 2019 | Completed final sign-off May 2019 | 2710 Harrison St | kitchen remodel. new cabinets, new counters. no structural changesDetails
kitchen remodel. new cabinets, new counters. no structural changes | $20,000 |
| Dec 20, 2018 | Completed final sign-off Jan 2019 | 1256 08th Av | to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work.Details
to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work. | $1,000 |
| Dec 5, 2018 | Completed final sign-off Dec 2020 | 1256 08th Av | voluntary strengthening of ground floorDetails
voluntary strengthening of ground floor | $20,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2020 | 1256 08th Av | window replacement in kind. unit 1 front fracade, 2 casements, rear facade: 2 dbl hung. unit 2 front facade 4 dbl hung, lightwell 1 dbl hung, unit 3 rear facade 2 dbl hung, 1 casementDetails
window replacement in kind. unit 1 front fracade, 2 casements, rear facade: 2 dbl hung. unit 2 front facade 4 dbl hung, lightwell 1 dbl hung, unit 3 rear facade 2 dbl hung, 1 casement | $25,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2021 | 1256 08th Av | interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvementsDetails
interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvements | $150,000 |
| Nov 16, 2018 | Completed final sign-off May 2019 | 1936 Folsom St | legalize finished storage in attic, no exterior alteration, new sheetrock throughout atticDetails
legalize finished storage in attic, no exterior alteration, new sheetrock throughout attic | $6,500 |
| Sep 4, 2018 | Completed final sign-off Dec 2018 | 1655 Plymouth Av | remodel master bath - new tile, new fixtures, add bath fan all lighting to be high efficacy or an occupancy sensors vanity in powder room.Details
remodel master bath - new tile, new fixtures, add bath fan all lighting to be high efficacy or an occupancy sensors vanity in powder room. | $20,000 |
| Jul 10, 2018 | Never finaled issued Aug 2018, no final | 923 Minnesota St | remodel (e) kitchen and dining rm. (n) electrical, plumbing, windows, floors, & cabintry, remove (e) vinyl siding as indicated and repair & paint (e) redwood siding, stregthen foundation.Details
remodel (e) kitchen and dining rm. (n) electrical, plumbing, windows, floors, & cabintry, remove (e) vinyl siding as indicated and repair & paint (e) redwood siding, stregthen foundation. | $115,000 |
| May 14, 2018 | Completed final sign-off Feb 2019 | 332 Arkansas St | replace appliances, finishes and cabinetry in the extg kitchen and 2 baths. remove partition wall to open kitchen to dining/living area, install new post per structural design. electrical updates as required. n/a for maher.Details
replace appliances, finishes and cabinetry in the extg kitchen and 2 baths. remove partition wall to open kitchen to dining/living area, install new post per structural design. electrical updates as required. n/a for maher. | $90,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 627 Masonic Av | kitchen remodel and master bathroom remodel.Details
kitchen remodel and master bathroom remodel. | $75,000 |
| Mar 28, 2018 | Completed final sign-off Jan 2022 | 33 Liberty St | remove (e)decks,stair & supporting structure in rear yard & create (n) decks w/ supporting structure,connecting spiral stair. replace (e) foundation for entire bldg. excavate rear portion of bldg to allow for an 8'-0"ceiling height. replace(e) windows & doors at ground fl on west elevationDetails
remove (e)decks,stair & supporting structure in rear yard & create (n) decks w/ supporting structure,connecting spiral stair. replace (e) foundation for entire bldg. excavate rear portion of bldg to allow for an 8'-0"ceiling height. replace(e) windows & doors at ground fl on west elevation | $125,000 |
| Mar 28, 2018 | Completed final sign-off Jan 2022 | 31 Liberty St | new half bath in basement storage area. remove (e) deck, add new deck off of rear facadeDetails
new half bath in basement storage area. remove (e) deck, add new deck off of rear facade | $125,000 |
| Mar 21, 2018 | Completed final sign-off Apr 2018 | 742 Natoma St | remodel one bathroom. install one shower. new tile, new vanity. no change to extg lighting. no structural changes. no walls moved, removed, added, or infilled. all extg layouts to remain.Details
remodel one bathroom. install one shower. new tile, new vanity. no change to extg lighting. no structural changes. no walls moved, removed, added, or infilled. all extg layouts to remain. | $20,000 |
| Feb 22, 2018 | Never finaled issued Dec 2018, no final | 524 Moraga St | infill lightwell and expand kitchen into it and remodel kitchenDetails
infill lightwell and expand kitchen into it and remodel kitchen | $65,000 |
| Feb 9, 2018 | Completed final sign-off Oct 2018 | 284 Shrader St | kitchen and 2 bathroom remodel: replace extg plumbing fixtures and appliances in these areas. all work interior and only proposed with in 284 shrader. 215 sf area of work. n/a for maherDetails
kitchen and 2 bathroom remodel: replace extg plumbing fixtures and appliances in these areas. all work interior and only proposed with in 284 shrader. 215 sf area of work. n/a for maher | $82,000 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 249 Dellbrook Av | add (n) deck & spiral stairs in rear yard. on rear facade, replace one window with (n) sliding glass door (same opening size). replace one window in kind.Details
add (n) deck & spiral stairs in rear yard. on rear facade, replace one window with (n) sliding glass door (same opening size). replace one window in kind. | $22,000 |
| Nov 16, 2017 | Completed final sign-off Dec 2017 | 120 Montalvo Av | less than 50% dryrot repair to (e) front wood juliet balcony over garage. no change to existing design, all repairs in kind.Details
less than 50% dryrot repair to (e) front wood juliet balcony over garage. no change to existing design, all repairs in kind. | $3,500 |
| Sep 12, 2017 | Expired or cancelled withdrawn Dec 2017 | 1466 25th Av | new rear deck & stair for single family residence.Details
new rear deck & stair for single family residence. | $10,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2018 | 390 Fair Oaks St | remodel kitchen and bathroom. change bathtub to stall shower. add led recessed lighting throughout unit. no structural changes.Details
remodel kitchen and bathroom. change bathtub to stall shower. add led recessed lighting throughout unit. no structural changes. | $35,000 |
| Aug 14, 2017 | Completed final sign-off Jan 2018 | 1702 Vallejo St | remove claw foot tub and tile floor. install new shower. no structural changes. no change to lighting. bath fan already installed.Details
remove claw foot tub and tile floor. install new shower. no structural changes. no change to lighting. bath fan already installed. | $12,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 56 Sanchez St | to comply with physical inspection report cc-8068Details
to comply with physical inspection report cc-8068 | $5,000 |
| Jun 5, 2017 | Never finaled issued Jun 2017, no final | 1521 Masonic Av | remodel powder room. fixture swap out. no structural changes.Details
remodel powder room. fixture swap out. no structural changes. | $8,000 |
| Aug 29, 2016 | Never finaled issued Jun 2018, no final | 815 Rhode Island St | remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft.Details
remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft. | $30,000 |
| Jun 27, 2016 | Expired or cancelled cancelled Jan 2026 | 668 Madrid St | replacement of rear stairs with minor work to bath & kitchen.Details
replacement of rear stairs with minor work to bath & kitchen. | $75,000 |
| Mar 30, 2016 | Completed final sign-off Aug 2016 | 1317 Guerrero St | to comply with physical inspection report #cc-7371Details
to comply with physical inspection report #cc-7371 | $25,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 643 02nd Av | remodel bathroom, new tile, new vanity, new toilet, add bath fan on humidity sensor. all lighting will be high efficency or on occupancy sensor. no structural changes.Details
remodel bathroom, new tile, new vanity, new toilet, add bath fan on humidity sensor. all lighting will be high efficency or on occupancy sensor. no structural changes. | $20,000 |
| Jan 5, 2016 | Never finaled issued Jan 2016, no final | 1521 Masonic Av | remodel kitchen. new cabinets, new counters, no structural changes. all lighting to be high efficeicy led.Details
remodel kitchen. new cabinets, new counters, no structural changes. all lighting to be high efficeicy led. | $30,000 |
| Dec 2, 2015 | Completed final sign-off Apr 2016 | 1243 11th Av | remodel kitchen, no structural changes. new cabinets, new flooring, new counters.Details
remodel kitchen, no structural changes. new cabinets, new flooring, new counters. | $25,000 |
| Sep 9, 2015 | Never finaled issued Sep 2015, no final | 1293 Stanyan St | kitchen remodel- new cabinets, new flooring, new counters, no structural changes, lighting to be high efficacy 12'x12' size.Details
kitchen remodel- new cabinets, new flooring, new counters, no structural changes, lighting to be high efficacy 12'x12' size. | $35,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 1293 Stanyan St | remodel bathroom. new shower, new vanity, new toilet, new bathrm. all non-efficient lights to be on occupancy sensor. add recessed lighting to entry hallway. no walls to be moved. no structural.Details
remodel bathroom. new shower, new vanity, new toilet, new bathrm. all non-efficient lights to be on occupancy sensor. add recessed lighting to entry hallway. no walls to be moved. no structural. | $25,000 |
| Apr 28, 2015 | Never finaled issued Apr 2015, no final | 33 Noe St | all work in 33 noe: to obtain final inspection for work approved under pa# 2007 21119 8554. all work completeDetails
all work in 33 noe: to obtain final inspection for work approved under pa# 2007 21119 8554. all work complete | |
| Jan 30, 2015 | Never finaled issued Jan 2015, no final | 33 Noe St | to comply with physical inspection report # cc-7645Details
to comply with physical inspection report # cc-7645 | $8,000 |
| Oct 10, 2014 | Completed final sign-off Feb 2016 | 524 Moraga St | revision to permit 201407181595; replace (e) retaining wall at rear yard along east property line.Details
revision to permit 201407181595; replace (e) retaining wall at rear yard along east property line. | $3,500 |
| Jul 30, 2014 | Completed final sign-off Aug 2015 | 2295 Vallejo St | replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work.Details
replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work. | $11,000 |
| Jul 18, 2014 | Never finaled issued Jul 2014, no final | 1317 Guerrero St | remove fixturesand finishes at kitchen, bath, and rear porch of lower unit and rear porch of upper unit.remove cladding at porch to access framework no structural. kitchen and bath remodel.Details
remove fixturesand finishes at kitchen, bath, and rear porch of lower unit and rear porch of upper unit.remove cladding at porch to access framework no structural. kitchen and bath remodel. | $30,000 |
| Jul 18, 2014 | Completed final sign-off Feb 2016 | 524 Moraga St | interior ground floor remodel of 526 s.f. including a new full bathroom, a new family and a bedroom, a bar area, a new stair to the new remodel, area, relocate washer and dry, install new water heater. a new exterior stair at the rear less than 30".Details
interior ground floor remodel of 526 s.f. including a new full bathroom, a new family and a bedroom, a bar area, a new stair to the new remodel, area, relocate washer and dry, install new water heater. a new exterior stair at the rear less than 30". | $70,000 |
| May 19, 2014 | Completed final sign-off May 2014 | 2 Santa Rita Av | revision to scope of permit 201206182799; plywood will not be installed on wallsDetails
revision to scope of permit 201206182799; plywood will not be installed on walls | |
| May 8, 2014 | Completed final sign-off Sep 2016 | 1230 11th Av | remove wall between kitchen & dining room, install psl beams and posts.Details
remove wall between kitchen & dining room, install psl beams and posts. | $15,000 |
| May 2, 2014 | Expired or cancelled expired Oct 2018 | 417 Lyon St | revision to appl #200804250691 & 200906220975 - remove bathroom change to mud room, add powder room & open wall between dining & family room @ 1st floor.Details
revision to appl #200804250691 & 200906220975 - remove bathroom change to mud room, add powder room & open wall between dining & family room @ 1st floor. | $45,000 |
| May 2, 2014 | Expired or cancelled expired Oct 2018 | 417 Lyon St | to complete and final #200906220975.Details
to complete and final #200906220975. | |
| Apr 9, 2014 | Completed final sign-off Aug 2014 | 2 Santa Rita Av | new office & bathroom at 1/f, remove stair from garage to 1/f, relocate water heater, new drainage connections, new power direct vent water heater & new stacked washer & dryer, replace/relocate electrical panel, new outlets including 2/f, replace windows & doors. this adds an office & bathroomDetails
new office & bathroom at 1/f, remove stair from garage to 1/f, relocate water heater, new drainage connections, new power direct vent water heater & new stacked washer & dryer, replace/relocate electrical panel, new outlets including 2/f, replace windows & doors. this adds an office & bathroom | $70,000 |
| Mar 17, 2014 | Completed final sign-off Jul 2014 | 1185 Dolores St | #2 - remove closet partition wall in living room. replace bathroom door with pocket door.Details
#2 - remove closet partition wall in living room. replace bathroom door with pocket door. | $1,500 |
| Mar 10, 2014 | Completed final sign-off Jul 2014 | 1185 Dolores St | remodel bathroom: new tub/tile and vanity, no structural changes. replace (e) bath fan with new. add new cabinets to kitchen - no structural. lighting in bath to be on occupancy sensor. no change to kitchen lighting.Details
remodel bathroom: new tub/tile and vanity, no structural changes. replace (e) bath fan with new. add new cabinets to kitchen - no structural. lighting in bath to be on occupancy sensor. no change to kitchen lighting. | $20,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 1048 Haight St | remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor.Details
remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor. | $25,000 |
| Feb 3, 2014 | Completed final sign-off Aug 2016 | 1317 Guerrero St | convert portion of(e)garage/basement level to 2 beds&1 bath. add new internal stair in connect to 1st level.combine(e)utility porch kitchen&bed to make open great room.convert(e)utility porch to habitable space to add 1/2 bath.new external egress landing&stair to replace(e)non-compliant deck&stair.Details
convert portion of(e)garage/basement level to 2 beds&1 bath. add new internal stair in connect to 1st level.combine(e)utility porch kitchen&bed to make open great room.convert(e)utility porch to habitable space to add 1/2 bath.new external egress landing&stair to replace(e)non-compliant deck&stair. | $365,000 |
| Nov 5, 2013 | Completed final sign-off Jan 2014 | 1185 Dolores St | remodel bathroom - new shower, new tile, new toilet, new sin. remove tile counter in kitchen and replaced counter only. no structural changes.Details
remodel bathroom - new shower, new tile, new toilet, new sin. remove tile counter in kitchen and replaced counter only. no structural changes. | $15,000 |
| Aug 28, 2013 | Completed final sign-off Jan 2014 | 1165 Fell St | remodel kitchen - new cabinets, new counters, new flooring. no structural changes.Details
remodel kitchen - new cabinets, new counters, new flooring. no structural changes. | $20,000 |
| Aug 8, 2013 | Completed final sign-off Feb 2014 | 610 Andover St | interior remodel at 610 only (2nd floor of duplex): remodel bathroom including replacing window in lightwell, new laundry & half bath in existing closet, minor upgrades in kitchen ( new dishwasher & lighting).Details
interior remodel at 610 only (2nd floor of duplex): remodel bathroom including replacing window in lightwell, new laundry & half bath in existing closet, minor upgrades in kitchen ( new dishwasher & lighting). | $20,000 |
| Jun 25, 2013 | Completed final sign-off Oct 2013 | 652 Waller St | remove interior non-bearing walls of 3 closets, create new bathroom in same space - new shower, vanity & toilet.Details
remove interior non-bearing walls of 3 closets, create new bathroom in same space - new shower, vanity & toilet. | $15,000 |
| Jun 14, 2013 | Completed final sign-off Jun 2013 | 364 Crescent Av | to obtain final inspection for work approved under pa#200712200938 all work is complete.Details
to obtain final inspection for work approved under pa#200712200938 all work is complete. | |
| Jun 14, 2013 | Completed final sign-off Sep 2013 | 662 Waller St | to comply with report of physical inspection application cc-7242Details
to comply with report of physical inspection application cc-7242 | $1,000 |
| Jun 5, 2013 | Expired or cancelled expired Feb 2016 | 1009 Castro St | reconfiguration of access to bathroom & kids bedroom, new cabinetry at kids bedroom under pitched roof, cabinetry upgrade at hallway & skylights replacement (not visible from the street).Details
reconfiguration of access to bathroom & kids bedroom, new cabinetry at kids bedroom under pitched roof, cabinetry upgrade at hallway & skylights replacement (not visible from the street). | $12,000 |
| May 24, 2013 | Completed final sign-off Oct 2013 | 815 Rhode Island St | revision to 201303142164. remove e pressure treated wood stair at front of building. infill e front door at 2nd flDetails
revision to 201303142164. remove e pressure treated wood stair at front of building. infill e front door at 2nd fl | $3,000 |
| Apr 18, 2013 | Completed final sign-off Apr 2013 | 524 Moraga St | replace 2 window at front - pull aluminum windows and replace back to original. 3 window configuration with marvin aluminum clad wood windows. replace 1 picture window in back of house with marvin aluiminum clad wood window. comply egress windows requirements.Details
replace 2 window at front - pull aluminum windows and replace back to original. 3 window configuration with marvin aluminum clad wood windows. replace 1 picture window in back of house with marvin aluiminum clad wood window. comply egress windows requirements. | $7,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 815 Rhode Island St | replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total)Details
replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total) | $90,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2013 | 543 Moultrie St | remove (e) closet and construct new bathroom with new dormer at 3rd floor of (e) residenceDetails
remove (e) closet and construct new bathroom with new dormer at 3rd floor of (e) residence | $22,500 |
| Jan 25, 2013 | Expired or cancelled expired Feb 2017 | 530 Banks St | replace counters and cabinets in kitchen. replace in kind. add under cabinet lighting. no structural changes.Details
replace counters and cabinets in kitchen. replace in kind. add under cabinet lighting. no structural changes. | $15,000 |
| Jan 15, 2013 | Completed final sign-off Apr 2013 | 543 Moultrie St | remodel kitchen and bathroom on main floor. new cabinets and counters in kitchen. add undercabinet lighting. no other changes to (e) lighting. new shower and tile in bathroom. add bath fan to room. no structural changes.Details
remodel kitchen and bathroom on main floor. new cabinets and counters in kitchen. add undercabinet lighting. no other changes to (e) lighting. new shower and tile in bathroom. add bath fan to room. no structural changes. | $25,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2014 | 812 22nd St | comply with complaint# 201058048. replacement in kind rear portion (9'-5" deep x 24'10" wide) of building @ all 3 stories. interior remodel of lower unit. 2 new baths, kitchen remodel, new laundry. structural work at garage, new posts & beams. 1/2 bath @ ground floor. storage.Details
comply with complaint# 201058048. replacement in kind rear portion (9'-5" deep x 24'10" wide) of building @ all 3 stories. interior remodel of lower unit. 2 new baths, kitchen remodel, new laundry. structural work at garage, new posts & beams. 1/2 bath @ ground floor. storage. | $50,000 |
| Nov 27, 2012 | Completed final sign-off Feb 2013 | 1344 Francisco St | work in 1344 only. remodel kitchen, new led lighting, new cabinets. remove 2 partiton walls, infill 1 window at visible streetDetails
work in 1344 only. remodel kitchen, new led lighting, new cabinets. remove 2 partiton walls, infill 1 window at visible street | $30,000 |
| Nov 8, 2012 | Completed final sign-off Nov 2012 | 257 Waller St | repair dry rot and siding on east property line closer to rear of house, repair is approx 20 % of entire side of home, approx 12 ft wide by 15 ft ht (work is on rear building)Details
repair dry rot and siding on east property line closer to rear of house, repair is approx 20 % of entire side of home, approx 12 ft wide by 15 ft ht (work is on rear building) | $2,500 |
| Oct 12, 2012 | Completed final sign-off Jan 2013 | 643 02nd Av | remodel kitchen, new cabinets, new counters, new high efficency lighting. no structural changes, no exterior work.Details
remodel kitchen, new cabinets, new counters, new high efficency lighting. no structural changes, no exterior work. | $25,000 |
| Sep 10, 2012 | Never finaled issued Sep 2012, no final | 2343 42nd Av | kitchen remodeling & (n) deck at the back of bldg.Details
kitchen remodeling & (n) deck at the back of bldg. | $30,000 |
| Aug 17, 2012 | Completed final sign-off Sep 2012 | 304 Moultrie St | revision to pa #2012.0621.3120 - termite repair at back portion of liv room, replace damaged roof rafters & roof sheeting in kind & samaged studs & siding in kind, add 1/2 plywood on inside face of rear walls on main level, reinforce (n) 4x6 column support w/steel tube above lower lvl master bedroomDetails
revision to pa #2012.0621.3120 - termite repair at back portion of liv room, replace damaged roof rafters & roof sheeting in kind & samaged studs & siding in kind, add 1/2 plywood on inside face of rear walls on main level, reinforce (n) 4x6 column support w/steel tube above lower lvl master bedroom | $6,500 |
| Jul 24, 2012 | Completed final sign-off Jun 2013 | 33 Noe St | remodel bathroom - delete bathtub, new vanity, new toilet, new tile floor, bath fan already exists, lighting to be on occupancy sansors.Details
remodel bathroom - delete bathtub, new vanity, new toilet, new tile floor, bath fan already exists, lighting to be on occupancy sansors. | $9,000 |
| Jul 23, 2012 | Completed final sign-off Sep 2012 | 304 Moultrie St | replace 4 double hung windows on front with marvin double hung, same size, same location. replace 1 slider on back of house, same size & same locationDetails
replace 4 double hung windows on front with marvin double hung, same size, same location. replace 1 slider on back of house, same size & same location | $2,500 |
| Jul 23, 2012 | Completed final sign-off Jul 2012 | 3042 Jackson St | replace 4 double hung windows on front with marvin double hung, same size, same location. replace 1 slider on back of house, same size & same locationDetails
replace 4 double hung windows on front with marvin double hung, same size, same location. replace 1 slider on back of house, same size & same location | $10,000 |
| Jun 21, 2012 | Completed final sign-off Sep 2012 | 304 Moultrie St | 1. re-arrange layout on main level, convert (e) 3rd bedroom into (n) living room, convert (e) living room into (n) 3rd bedroom. 2. add one (n) skylight 2'x4 above stairway, add one (n) skylight 2'x4' in (n) living room.Details
1. re-arrange layout on main level, convert (e) 3rd bedroom into (n) living room, convert (e) living room into (n) 3rd bedroom. 2. add one (n) skylight 2'x4 above stairway, add one (n) skylight 2'x4' in (n) living room. | $15,000 |
| Jun 18, 2012 | Completed final sign-off May 2014 | 2 Santa Rita Av | remove wall covering in basement. install foundation bolts in accessible area of foundation. install plywood over walls.Details
remove wall covering in basement. install foundation bolts in accessible area of foundation. install plywood over walls. | $1,500 |
| May 14, 2012 | Completed final sign-off Aug 2012 | 859 Elizabeth St | remodel top floor athroom. new tub, new toilet, new vanity. install bath fan. light to be on occupancy sensors. lighting to comply with cec 150(k)Details
remodel top floor athroom. new tub, new toilet, new vanity. install bath fan. light to be on occupancy sensors. lighting to comply with cec 150(k) | $9,500 |
| Apr 25, 2012 | Completed final sign-off Jun 2012 | 1178 Greenwich St | re-tile shower include floor of bathroom, no structural work.Details
re-tile shower include floor of bathroom, no structural work. | $6,000 |
| Apr 12, 2012 | Completed final sign-off Jul 2012 | 3042 Jackson St | 3rd floor - unit #3 remove bearing between kitchen & living room. provide new steel beam.Details
3rd floor - unit #3 remove bearing between kitchen & living room. provide new steel beam. | $15,000 |
| Mar 26, 2012 | Completed final sign-off Jul 2012 | 2517 Harrison St | install 2 fixed skylights in kitchen.Details
install 2 fixed skylights in kitchen. | $2,500 |
| Mar 12, 2012 | Completed final sign-off May 2012 | 1257 Noe St | remodel 2 bathrooms - new tile/new fixtures, no structural. 2nd bathroom will add ceiling fan. all lighting will be on occupancy sensors. replace kitchen counters.Details
remodel 2 bathrooms - new tile/new fixtures, no structural. 2nd bathroom will add ceiling fan. all lighting will be on occupancy sensors. replace kitchen counters. | $25,000 |
| Dec 12, 2011 | Completed final sign-off Jul 2012 | 2517 Harrison St | remodel kitchen. replace cabinets, counters and stove. no structural changes. all (n) lighting must comply cec 150 (k)8Details
remodel kitchen. replace cabinets, counters and stove. no structural changes. all (n) lighting must comply cec 150 (k)8 | $20,000 |
| Sep 12, 2011 | Expired or cancelled expired Sep 2012 | 257 Castro St | relocate light switches in 1/f bathroom, (n) lighting must comply with cec 150(k), add new valve into shower wall, retile shower & floor with new tile, place non-flourscent light on occupancy sensor.Details
relocate light switches in 1/f bathroom, (n) lighting must comply with cec 150(k), add new valve into shower wall, retile shower & floor with new tile, place non-flourscent light on occupancy sensor. | $7,500 |
| Jul 26, 2011 | Completed final sign-off Oct 2011 | 859 Elizabeth St | remove approx 12 lin ft of interior wall between kitchen and dining room. kitchen remodelDetails
remove approx 12 lin ft of interior wall between kitchen and dining room. kitchen remodel | $35,000 |
| Jul 26, 2011 | Completed final sign-off Aug 2011 | 740 Natoma St | resurface landing at bottom of rear interior stairs, bring landing up by 1" to comply with sfbc sec.1009.3Details
resurface landing at bottom of rear interior stairs, bring landing up by 1" to comply with sfbc sec.1009.3 | $700 |
| Jul 22, 2011 | Completed final sign-off Oct 2011 | 50 Belcher St | replace 2 interior observation windows between classroom and directors office, class room, rear resource class room. replace 3 windows along side alley on north side of buildingDetails
replace 2 interior observation windows between classroom and directors office, class room, rear resource class room. replace 3 windows along side alley on north side of building | $7,000 |
| Jul 11, 2011 | Completed final sign-off Jan 2012 | 250 Romain St | kitchen & bathroom remodeling; convert (e) bedrooms into (n) family room in lower level.Details
kitchen & bathroom remodeling; convert (e) bedrooms into (n) family room in lower level. | $30,000 |
| Jul 7, 2011 | Expired or cancelled expired Sep 2012 | 257 Castro St | remodel 2nd floor powder room, new toilet and sink, no elec changes. remodel 3rd floor master bath, new shower stall, toilet, vanity and sink. keep existing bath fan, new lighting and smoke detectorsDetails
remodel 2nd floor powder room, new toilet and sink, no elec changes. remodel 3rd floor master bath, new shower stall, toilet, vanity and sink. keep existing bath fan, new lighting and smoke detectors | $20,000 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 658 Waller St | unit 658 only: kitchen remodel, new cabinets, counters, no structural. add required carbon monoxide/smoke detector.Details
unit 658 only: kitchen remodel, new cabinets, counters, no structural. add required carbon monoxide/smoke detector. | $25,000 |
| May 10, 2011 | Completed final sign-off Jul 2011 | 471 Mangels Av | re-tile shower and change shower valve, no other changes tobathroom, no structural changesDetails
re-tile shower and change shower valve, no other changes tobathroom, no structural changes | $3,000 |
| May 10, 2011 | Never finaled issued May 2011, no final | 1936 Folsom St | repair siding boards, add garage lights and outlets, add rear garage doorDetails
repair siding boards, add garage lights and outlets, add rear garage door | $4,000 |
| Apr 15, 2011 | Expired or cancelled expired Nov 2012 | 2917 24th Av | repair dryrot around front door and repair dryrot on front porch. repairing framing only. no structural changes. all repairs in kind.Details
repair dryrot around front door and repair dryrot on front porch. repairing framing only. no structural changes. all repairs in kind. | $2,500 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 1828 Grove St | remodel bathroom: (n) tile, (n) toilet, (n) vanity & sink, no structural changes, work is in 1828 only. no lighting work involved.Details
remodel bathroom: (n) tile, (n) toilet, (n) vanity & sink, no structural changes, work is in 1828 only. no lighting work involved. | $5,000 |
| Nov 9, 2010 | Expired or cancelled expired Jul 2015 | 26 Mallorca Wy | repair flashing where roof meets upper walls of bldg. repair drywall in master bedroom.Details
repair flashing where roof meets upper walls of bldg. repair drywall in master bedroom. | $3,000 |
| Nov 4, 2010 | Completed final sign-off Jul 2011 | 39 Ellert St | top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bathDetails
top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bath | $100,000 |
| Oct 8, 2010 | Completed final sign-off Jul 2011 | 39 Ellert St | turn a closet into a bathroom by creating a shed dormer.Details
turn a closet into a bathroom by creating a shed dormer. | $15,000 |
| Aug 30, 2010 | Completed final sign-off Sep 2010 | 504 Ellsworth St | revision to pa# 2009.09.28.7777. change bedroom to storage room on the ground floor.Details
revision to pa# 2009.09.28.7777. change bedroom to storage room on the ground floor. | |
| Jul 19, 2010 | Completed final sign-off Nov 2010 | 19 Bennington St | revision to pa# 2010.0119.4961. 3rd fl: relocate bathroom , closet, fireplace, 3 windows, 1 skylight. delete 1 skylight, add 1 window at front. all work shown in delta 1, 7.17.10Details
revision to pa# 2010.0119.4961. 3rd fl: relocate bathroom , closet, fireplace, 3 windows, 1 skylight. delete 1 skylight, add 1 window at front. all work shown in delta 1, 7.17.10 | |
| Jun 28, 2010 | Completed final sign-off Aug 2010 | 483 Edinburgh St | remodel 2nd floor bath room, new sink, nes tub, new toilet, new tile. add bath fan. no structural changes. no removal of walls.Details
remodel 2nd floor bath room, new sink, nes tub, new toilet, new tile. add bath fan. no structural changes. no removal of walls. | $15,000 |
| May 14, 2010 | Completed final sign-off May 2010 | 3843 26th St | remodel bathroom & master closet, new tub, new toilet, new vanity, new tile, refinish floors, no structural changes.Details
remodel bathroom & master closet, new tub, new toilet, new vanity, new tile, refinish floors, no structural changes. | $15,000 |
| May 14, 2010 | Completed final sign-off Aug 2010 | 141 Otsego Av | remodel main floor bath: new tile, new toilet, kinstall bath fan. insulate & re-drywall 2 back bedrooms, no structural changes.Details
remodel main floor bath: new tile, new toilet, kinstall bath fan. insulate & re-drywall 2 back bedrooms, no structural changes. | $20,000 |